Pressure vessel Date: June 3, 2010 Permit status: Permit finaled | Current use: Commercial | Permit id: 10045-10000-001 | |||||
SCORE 73 Electrical Date: November 2, 2010 Contractor: Gerald Bedard Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-90000-218 | |||||
SCORE 100 Plumbing Date: November 23, 2010 Contractor: Stacee Blokzyl Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-90000-202 | |||||
Electrical Date: June 17, 2011 Permit status: Issued | Current use: Commercial | Permit id: 11041-10000-125 | |||||
Supplemental permit to allow the sale & consumption of alcoholic bever Date: July 1, 2011 Value: $40,000 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10001-173 | |||||
SCORE 86 Plumbing Date: April 18, 2012 Contractor: Sheila Mcbride Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-90000-070 | |||||
SCORE 89 Install one 2-2" x 17-2" exterior non-illuminated wall sign Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 11048-10000-014 | |||||
Non-structural t. I. New nonbearing partitions to create office space Date: October 4, 2010 Value: $130,000 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10000-166 | |||||
T. I added and relocated sprinklers. Date: October 8, 2010 Permit type: Fire sprinkler | Permit status: Permit expired | Current use: Commercial | Permit id: 10043-10000-022 | |||||
SCORE 96 Plumbing Date: June 13, 2011 Contractor: Gil Simchoni Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-90000-101 | |||||
SCORE 82 Electrical Date: August 5, 2010 Contractor: Joseph Furio Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-90000-153 | |||||
SCORE 100 Electrical Date: October 15, 2010 Contractor: Mahmoud Fazlali Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-205 | |||||
SCORE 100 Electrical Date: September 29, 2010 Contractor: Dan George Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-90000-193 | |||||
SCORE 90 Electrical Date: June 6, 2011 Contractor: Marco Romero Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-105 | |||||
T. I. To exist. Restaurant. Expand patio areas. Redesign dining area Date: December 9, 2010 Value: $98,000 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10000-173 | |||||
1st floor lobby renovations (7 sq ft) infilling (2) walls to match e Date: July 29, 2010 Value: $50,000 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10000-122 | |||||
SCORE 88 New illuminated 4x9" - 6-8" wall sign for (e) restuarant tenant spac Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 11048-70000-011 | |||||
Fire sprinkler Date: August 4, 2015 Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-034 | |||||
SCORE 100 Electrical Date: June 2, 2014 Contractor: Mahmoud Fazlali Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-145 | |||||
SCORE 100 T. I. Remodel - demo & construct non-bearing interior partitions. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-260 | |||||
SCORE 61 Electrical Date: June 8, 2015 Contractor: Todd Ream Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-176 | |||||
SCORE 96 Plumbing Date: August 21, 2014 Contractor: S Mcbride Permit status: Issued | Current use: Commercial | Permit id: 14042-10001-110 | |||||
SCORE 100 Fire sprinkler Date: April 24, 2014 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-90000-014 | |||||
SCORE 93 Non-structural t. I.; demo, new partitions, partial new susp. Ceiling. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-076 | |||||
SCORE 86 Supplemental permit to: 15016-10000-07687 tochange suite no. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10001-076 | |||||
SCORE 66 Electrical Date: March 19, 2015 Contractor: Ryan Vallee Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-20000-080 | |||||
SCORE 97 Fire sprinkler Date: August 6, 2014 Contractor: Mike Connell Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-90000-031 | |||||
SCORE 93 Interior t. I. To an office space. New partitios, ceiling, millwork + f Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-104 | |||||
SCORE 100 Hvac Date: December 16, 2013 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 13044-90000-135 | |||||
SCORE 86 Supple permit 13048-10000-02432 to change contractor to don meyer sta Date: August 5, 2014 Contractor: John Carnes Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13048-10001-024 | |||||
SCORE 59 T. I. - dmeolish of walls, new walls, electrical lighting and finish Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-108 | |||||
SCORE 100 Fire sprinkler Permit status: Issued | Current use: Commercial | Permit id: 13043-20000-030 | |||||
SCORE 100 Fire sprinkler Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-20000-010 | |||||
SCORE 98 Electrical Date: June 15, 2014 Contractor: Robert King Permit status: Issued | Current use: Commercial | Permit id: 14041-90000-159 | |||||
Electrical Date: March 4, 2014 Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-057 | |||||
SCORE 100 Fire sprinkler Date: September 26, 2013 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-90000-031 | |||||
Plumbing Date: August 30, 2013 Permit status: Permit finaled | Current use: Commercial | Permit id: 13042-10000-172 | |||||
SCORE 68 Electrical Date: July 22, 2014 Contractor: Jerry Anaya Permit status: Issued | Current use: Commercial | Permit id: 14041-90000-196 | |||||
SCORE 93 Electrical Date: June 24, 2014 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-168 | |||||
SCORE 100 Common area remodel. See comment. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-077 | |||||
SCORE 93 Electrical Date: September 3, 2013 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-239 | |||||
Install one dual faced non-illuminated projection sign (20x3) readin Date: November 6, 2013 Value: $3,000 Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 13048-10000-024 | |||||
SCORE 93 Electrical Date: April 28, 2015 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-127 | |||||
SCORE 100 Hvac Date: April 14, 2014 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 14044-90000-034 | |||||
SCORE 91 Electrical Date: May 21, 2015 Contractor: Robert Thayer Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-156 | |||||
SCORE 100 Hvac Date: May 26, 2015 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-049 | |||||
Tenant improvement of existing tenant space. Some demolition. New p Date: August 21, 2013 Value: $150,000 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-164 | |||||
SCORE 59 Supplemental permit to revise existing corridor ceiling height on 2nd Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10001-077 | |||||
SCORE 97 Plumbing Date: April 29, 2015 Contractor: David Permit status: Issued | Current use: Commercial | Permit id: 15042-10000-084 | |||||
SCORE 99 Interior tenant improvement - construction of (11) offices with non lo Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-026 | |||||
SCORE 59 Interior non-structural t. I. ( 1416 s. F.) to remove & installnew part Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-137 | |||||
SCORE 100 Fire sprinkler Date: May 18, 2015 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-90000-021 | |||||
SCORE 98 Electrical Date: June 25, 2014 Contractor: Dan Montgomery Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-170 | |||||
SCORE 61 Electrical Date: August 6, 2015 Contractor: Michael Baccelli Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-90000-253 | |||||
SCORE 98 Electrical Date: January 23, 2014 Contractor: Brett Johnson Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-90000-020 | |||||
Supplemental permit to permit # 13016-10000-16402 : alteratio to inte Date: November 15, 2013 Value: $501 Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10001-164 | |||||
SCORE 96 Hvac Date: March 24, 2015 Contractor: Aron Lilland Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-026 | |||||
SCORE 95 Electrical Date: March 4, 2014 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-057 | |||||
SCORE 95 Electrical Date: March 26, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-089 | |||||
SCORE 95 Electrical Date: August 27, 2013 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-232 | |||||
SCORE 86 Fire sprinkler Date: August 4, 2015 Contractor: Lindley Fire Protection Co Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-034 | |||||
SCORE 87 Hvac Date: July 16, 2015 Contractor: Bradley Construction Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10000-071 | |||||
SCORE 89 Plumbing Date: August 30, 2013 Contractor: Coleman Plumbing Company Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13042-10000-172 | |||||
SCORE 94 Tenant improvement of existing tenant space. Some demolition. New p Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-164 | |||||
SCORE 94 Supplemental permit to permit # 13016-10000-16402 : alteratio to inte Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10001-164 | |||||
SCORE 95 Electrical Date: March 4, 2014 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-057 | |||||
SCORE 86 Install one dual faced non-illuminated projection sign (20x3) readin Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 13048-10000-024 | |||||
SCORE 93 Electrical Date: August 4, 2015 Contractor: Pyro Comm Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-250 | |||||
SCORE 95 Electrical Date: August 27, 2013 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-232 | |||||
SCORE 95 Electrical Date: March 26, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-089 | |||||
SCORE 82 Elevator Date: June 29, 2016 Contractor: Josh Preston Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-90000-009 | |||||
SCORE 100 Ti (2) new sprinkler heads ground floor. Date: October 13, 2016 Contractor: David Ravelo Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-20000-048 | |||||
SCORE 92 T. I. To add new partitions and new doors. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10000-192 | |||||
SCORE 100 Hvac Date: September 13, 2016 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-90000-106 | |||||
SCORE 100 Electrical Date: September 12, 2016 Contractor: Steven Vallee Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-90000-324 | |||||
SCORE 72 Electrical Date: October 24, 2016 Contractor: L T Electrical And Construction Co Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-375 | |||||
SCORE 95 Electrical Date: October 3, 2016 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-349 | |||||
Change of use and occupancy portion of building on the first floor fro Date: September 19, 2016 Value: $78,000 Permit type: Bldg-alter/repair | Permit status: Cofo in progress | Current use: Commercial | Permit id: 16016-10000-108 | |||||
SCORE 89 Install (1) new, non-illuminated, on-site wall sign @ 3-6" x 54-0". Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 16048-20000-018 | |||||
SCORE 95 Electrical Date: October 3, 2016 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-349 | |||||
SCORE 98 Date: November 7, 2017 Contractor: Gabriel Permit status: Issued | Current use: Commercial | Permit id: 17042-10000-276 | |||||
SCORE 59 Date: November 3, 2017 Contractor: Dcon Electric Inc Permit status: Issued | Current use: Commercial | Permit id: 17041-30000-398 | |||||
SCORE 99 Date: November 21, 2017 Contractor: Frederick Brown Permit status: Issued | Current use: Commercial | Permit id: 17044-90000-145 | |||||
SCORE 56 Date: November 20, 2017 Contractor: Julia Wright Permit status: Issued | Current use: Commercial | Permit id: 17043-90000-059 | |||||
SCORE 64 Date: December 4, 2017 Contractor: Robert Alantar Permit status: Issued | Current use: Commercial | Permit id: 17041-10000-434 | |||||
SCORE 97 T. I. And to change use of (e)59-4" x 62-4" irreg. Shaped office into Permit status: Issued | Current use: Commercial | Permit id: 17016-20000-291 | |||||
SCORE 100 Ti (2) new sprinkler heads ground floor. Date: October 13, 2016 Contractor: David Ravelo Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-20000-048 | |||||
SCORE 82 Date: June 29, 2016 Contractor: Josh Preston Permit status: Permit finaled | Current use: Commercial | Permit id: 16046-90000-009 | |||||
SCORE 89 Install (1) new, non-illuminated, on-site wall sign @ 3-6" x 54-0". Permit status: Permit finaled | Current use: Onsite | Permit id: 16048-20000-018 | |||||
SCORE 72 Date: October 24, 2016 Contractor: L T Electrical And Construction Co Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-375 | |||||
SCORE 100 Date: September 13, 2016 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-90000-106 | |||||
SCORE 100 Date: September 12, 2016 Contractor: Steven Vallee Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-90000-324 | |||||
Change of use and occupancy portion of building on the first floor fro Date: September 19, 2016 Value: $78,000 Permit status: Cofo issued | Current use: Commercial | Permit id: 16016-10000-108 | |||||
SCORE 92 T. I. To add new partitions and new doors. Permit status: Permit finaled | Current use: Commercial | Permit id: 16016-10000-192 | |||||
SCORE 95 Date: October 3, 2016 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-349 | |||||
SCORE 100 T. I. Remodel - demo & construct non-bearing interior partitions. Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-260 | |||||
SCORE 100 Date: June 2, 2014 Contractor: Mahmoud Fazlali Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-145 | |||||
SCORE 86 Date: August 4, 2015 Contractor: Lindley Fire Protection Co Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-034 | |||||
SCORE 61 Date: June 8, 2015 Contractor: Todd Ream Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-176 | |||||
SCORE 100 Date: April 14, 2014 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 14044-90000-034 | |||||
SCORE 89 Date: December 18, 2013 Contractor: Coleman Plumbing Company Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 13042-30001-172 | |||||
SCORE 91 Date: May 21, 2015 Contractor: Robert Thayer Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-156 | |||||
SCORE 100 Date: May 26, 2015 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-049 | |||||
SCORE 98 Date: June 15, 2014 Contractor: Robert King Permit status: Permit expired | Current use: Commercial | Permit id: 14041-90000-159 | |||||
SCORE 94 Tenant improvement of existing tenant space. Some demolition. New p Permit status: Permit finaled | Current use: Commercial | Permit id: 13016-10000-164 | |||||
SCORE 87 Date: July 16, 2015 Contractor: Bradley Construction Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-227 | |||||
SCORE 100 Date: September 11, 2013 Contractor: Matt Dahme Permit status: Permit finaled | Current use: Commercial | Permit id: 13044-90000-095 | |||||
SCORE 95 Date: August 27, 2013 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-10000-232 | |||||
SCORE 97 Date: April 29, 2015 Contractor: David Permit status: Issued | Current use: Commercial | Permit id: 15042-10000-084 | |||||
SCORE 100 Date: July 10, 2014 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-90000-026 | |||||
SCORE 59 Supplemental permit to revise existing corridor ceiling height on 2nd Permit status: Permit expired | Current use: Commercial | Permit id: 14016-10001-077 | |||||
SCORE 99 Interior tenant improvement - construction of (11) offices with non lo Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-026 | |||||
SCORE 59 Interior non-structural t. I. ( 1416 s. F.) to remove & installnew part Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-137 | |||||
SCORE 100 Date: May 18, 2015 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-90000-021 | |||||
SCORE 98 Date: June 25, 2014 Contractor: Dan Montgomery Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-170 | |||||
SCORE 96 Date: June 13, 2014 Contractor: S Mcbride Permit status: Issued | Current use: Commercial | Permit id: 14042-90000-110 | |||||
SCORE 61 Date: August 6, 2015 Contractor: Michael Baccelli Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-90000-253 | |||||
SCORE 98 Date: January 23, 2014 Contractor: Brett Johnson Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-90000-020 | |||||
SCORE 94 Supplemental permit to permit # 13016-10000-16402 : alteratio to inte Permit status: Permit expired | Current use: Commercial | Permit id: 13016-10001-164 | |||||
SCORE 93 Date: July 22, 2015 Contractor: Pyro Comm Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-234 | |||||
SCORE 96 Date: March 24, 2015 Contractor: Aron Lilland Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-026 | |||||
SCORE 93 Non-structural t. I.; demo, new partitions, partial new susp. Ceiling. Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-076 | |||||
SCORE 86 Supplemental permit to: 15016-10000-07687 tochange suite no. Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10001-076 | |||||
SCORE 66 Date: March 19, 2015 Contractor: Ryan Vallee Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-20000-080 | |||||
SCORE 97 Date: August 6, 2014 Contractor: Mike Connell Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-90000-031 | |||||
SCORE 93 Interior t. I. To an office space. New partitios, ceiling, millwork + f Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-104 | |||||
SCORE 86 Supple permit 13048-10000-02432 to change contractor to don meyer sta Date: August 5, 2014 Contractor: John Carnes Permit status: Permit finaled | Current use: Commercial | Permit id: 13048-10001-024 | |||||
SCORE 59 T. I. - dmeolish of walls, new walls, electrical lighting and finish Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-108 | |||||
SCORE 86 Install one dual faced non-illuminated projection sign (20x3) readin Permit status: Permit finaled | Current use: Onsite | Permit id: 13048-10000-024 | |||||
SCORE 100 Permit status: Issued | Current use: Commercial | Permit id: 13043-20000-030 | |||||
SCORE 100 Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-20000-010 | |||||
SCORE 95 Date: March 4, 2014 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-057 | |||||
SCORE 100 Date: September 26, 2013 Contractor: Maurice Singleton Permit status: Permit finaled | Current use: Commercial | Permit id: 13043-90000-031 | |||||
SCORE 68 Date: July 22, 2014 Contractor: Jerry Anaya Permit status: Issued | Current use: Commercial | Permit id: 14041-90000-196 | |||||
SCORE 95 Date: March 26, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-089 | |||||
SCORE 93 Date: June 24, 2014 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-168 | |||||
SCORE 100 Common area remodel. See comment. Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-077 | |||||
SCORE 93 Date: September 3, 2013 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-239 | |||||
SCORE 95 Date: May 11, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-141 | |||||
SCORE 93 Date: April 28, 2015 Contractor: Richard Tapp Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-90000-127 |