Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Installation of a halo inline system and hose bib replacement Date: December 2, 2013 Contractor: Nicholas Nelson Permit type: Residential plumbing | Permit status: Issued | Permit id: Plb-13-08234 | |||||
SCORE 100 Furnace replacement Date: March 10, 2014 Contractor: Paul Kocanda Permit type: Residential air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-14-01933 | |||||
SCORE 100 Ac unit replacement Date: May 28, 2015 Contractor: Matthew Schaefer Permit type: Electrical residential existing | Permit status: Issued | Permit id: Elc-15-04210 | |||||
Inspection of the electrical connection to the new furnace after replacement. Date: March 10, 2014 Permit type: Electrical residential existing | Permit status: Issued | Permit id: Elc-14-01988 | |||||
SCORE 89 2 lavs. Whirlpool. Shower. Date: January 14, 2015 Contractor: Brandon Iwansky Permit type: Residential plumbing | Permit status: Issued | Permit id: Plb-15-00177 | |||||
SCORE 89 Remove existing shower. Replace toilet. Replace valve and add shower head to tub/shower. Move lavatory drain/water lines over ~6" to fit in new vanity. Date: November 3, 2014 Contractor: Brandon Iwansky Permit type: Residential plumbing | Permit status: Issued | Permit id: Plb-14-07273 | |||||
SCORE 100 A/c replacement Date: June 1, 2015 Contractor: Paul Kocanda Permit type: Residential air conditioning air distribution systems | Permit status: Issued | Permit id: Mec-15-03767 | |||||
Repl gal gas wh repl of main line Date: January 10, 2017 Permit type: Residential plumbing | Permit status: Issued | Permit id: Plb-17-00110 |