Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Installation of onsite underground combination domestic waterfire line piping and wastewater piping Date: September 14, 2016 Contractor: Michael Martinez Permit type: Plumbing permit | Permit status: Active | Expiration date: March 13, 2017 | Permit id: 2016-112279 Pp | |||||
SCORE 90 Teporary loop for construction reference sp 2015008177 Date: August 12, 2016 Contractor: Dave Gonzalez Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2016 | Expiration date: August 24, 2016 | Permit id: 2016-097564 Ep | |||||
Installation of new brezza natural living monument Date: September 7, 2017 Permit type: Electrical permit | Permit status: Active | Expiration date: March 6, 2018 | Permit id: 2017-103264 Ep | |||||
Installation new irrigation system Date: August 1, 2017 Permit type: Plumbing permit | Permit status: Active | Expiration date: January 28, 2018 | Permit id: 2017-093489 Pp | |||||
SCORE 90 Teporary loop for construction reference sp 2015008177 Date: August 12, 2016 Contractor: Dave Gonzalez Permit type: Electrical permit | Permit status: Final | Completion date: August 24, 2016 | Expiration date: August 24, 2016 | Permit id: 2016-097564 Ep | |||||
SCORE 98 New construction of swimming pool Date: May 31, 2017 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: November 2, 2017 | Expiration date: November 2, 2017 | Permit id: 2017-062194 Pp | |||||
SCORE 100 New construction of swimming pool Applicant Phone: (512) 264-5533 | Permit type: Building permit | Permit status: Active | Expiration date: May 5, 2018 | Permit id: 2017-062194 Bp | |||||
SCORE 98 New construction of swimming pool Date: May 30, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 6, 2017 | Expiration date: November 6, 2017 | Permit id: 2017-062194 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 3, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: September 15, 2017 | Expiration date: September 15, 2017 | Permit id: 2016-116981 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: September 6, 2017 | Expiration date: September 6, 2017 | Permit id: 2016-116981 Pp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: September 1, 2017 | Expiration date: September 1, 2017 | Permit id: 2016-116981 Mp | |||||
SCORE 98 Temporary meter loop for commercial property refer to 2016116981 bp Date: February 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 19, 2017 | Expiration date: April 19, 2017 | Permit id: 2017-016818 Ep | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 6, 2017 | Expiration date: October 6, 2017 | Permit id: 2016-116981 Bp | |||||
SCORE 98 Dumpster enclosure for multi family Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116998 Ep | |||||
SCORE 100 Dumpster enclosure for multi family Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116998 Bp | |||||
SCORE 98 New construction of 6 car garage for multifamily Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 6, 2017 | Expiration date: November 6, 2017 | Permit id: 2016-116996 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 3, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: September 12, 2017 | Expiration date: September 12, 2017 | Permit id: 2016-1169 Ep | |||||
SCORE 100 Estimated start date 060817construct new commercial sidewalk inspection fees paid to ss shall meet all city standardsnmt Date: June 7, 2017 Contractor: Rampart Construction Permit type: Driveway / sidewalks | Permit status: Final | Completion date: September 19, 2017 | Expiration date: September 19, 2017 | Permit id: 2017-069218 Ds | |||||
SCORE 99 New construction of 6 car garage for multifamily Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: August 25, 2017 | Expiration date: August 25, 2017 | Permit id: 2016-116996 Mp | |||||
SCORE 98 Tpole for construction of apartment reference 16116980 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 13, 2017 | Expiration date: April 13, 2017 | Permit id: 2017-014996 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: August 25, 2017 | Expiration date: August 25, 2017 | Permit id: 2016-1169 Mp | |||||
SCORE 100 112117 reactivate to replace 27 type iii commercial driveway approach estimated start date 112917estimated start date 022317construct new 27 type iii commercial driveway approach inspection fees paid to ss shall meet all city standardsnmt Date: February 21, 2017 Contractor: Rampart Construction Permit type: Driveway / sidewalks | Permit status: Expired | Expiration date: August 20, 2017 | Permit id: 2017-019986 Ds | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: September 1, 2017 | Expiration date: September 1, 2017 | Permit id: 2016-1169 Pp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 6, 2017 | Expiration date: October 6, 2017 | Permit id: 2016-1169 Bp | |||||
SCORE 100 New construction of 6 car garage for multifamily Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116996 Bp | |||||
SCORE 100 120817 see attached variance approved 111617for type iii approachnmtdemo existing driveway approach to alter type of driveway from type ii to type iii inspection fees paid to ss shall meet all city standardsnmt Date: November 28, 2017 Contractor: Rampart Construction Permit type: Driveway / sidewalks | Permit status: Active | Expiration date: May 27, 2018 | Permit id: 2017-148491 Ds | |||||
SCORE 100 New construction of clubhouse for multifamily Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 3, 2017 | Expiration date: October 3, 2017 | Permit id: 2016-116993 Bp | |||||
SCORE 98 New construction of clubhouse for multifamily Date: November 17, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: August 28, 2017 | Expiration date: August 28, 2017 | Permit id: 2016-116993 Ep | |||||
SCORE 99 New construction of clubhouse for multifamily Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: August 21, 2017 | Expiration date: August 21, 2017 | Permit id: 2016-116993 Mp | |||||
SCORE 98 New construction of clubhouse for multifamily Date: November 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: September 1, 2017 | Expiration date: September 1, 2017 | Permit id: 2016-116993 Pp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: October 5, 2017 | Expiration date: October 5, 2017 | Permit id: 2016-116982 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 26, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: October 4, 2017 | Expiration date: October 4, 2017 | Permit id: 2016-116982 Pp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: October 12, 2017 | Expiration date: October 12, 2017 | Permit id: 2016-116982 Ep | |||||
SCORE 98 Tpole for new apartments reference 20161163982 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 19, 2017 | Expiration date: April 19, 2017 | Permit id: 2017-014973 Ep | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 25, 2017 | Expiration date: October 25, 2017 | Permit id: 2016-116982 Bp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: September 26, 2017 | Expiration date: September 26, 2017 | Permit id: 2016-116987 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: September 29, 2017 | Expiration date: September 29, 2017 | Permit id: 2016-116987 Pp | |||||
SCORE 98 Tpole for construction of apartments reference 2016116987 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 13, 2017 | Expiration date: April 13, 2017 | Permit id: 2017-0149 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 17, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: October 4, 2017 | Expiration date: October 4, 2017 | Permit id: 2016-116987 Ep | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 17, 2017 | Expiration date: October 17, 2017 | Permit id: 2016-116987 Bp | |||||
SCORE 99 New construction of 6 car garage for multifamily Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 3, 2017 | Expiration date: November 3, 2017 | Permit id: 2016-116995 Mp | |||||
SCORE 98 New construction of 6 car garage for multifamily Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 6, 2017 | Expiration date: November 6, 2017 | Permit id: 2016-116995 Ep | |||||
SCORE 100 New construction of 6 car garage for multifamily Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116995 Bp | |||||
SCORE 98 Tpole for construction of apartments reference 2016116988 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 13, 2017 | Expiration date: April 13, 2017 | Permit id: 2017-015001 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 17, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: September 25, 2017 | Expiration date: September 25, 2017 | Permit id: 2016-116988 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: September 25, 2017 | Expiration date: September 25, 2017 | Permit id: 2016-116988 Pp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 17, 2017 | Expiration date: October 17, 2017 | Permit id: 2016-116988 Bp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: September 8, 2017 | Expiration date: September 8, 2017 | Permit id: 2016-116988 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: October 26, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: October 12, 2017 | Expiration date: October 12, 2017 | Permit id: 2016-116983 Pp | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116983 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 8, 2017 | Expiration date: May 8, 2017 | Permit id: 2017-043774 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: October 13, 2017 | Expiration date: October 13, 2017 | Permit id: 2016-116983 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: October 18, 2017 | Expiration date: October 18, 2017 | Permit id: 2016-116983 Ep | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: October 30, 2017 | Expiration date: October 30, 2017 | Permit id: 2016-116983 Bp | |||||
SCORE 98 Tpole for construction of apartments reference 2016116989 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 13, 2017 | Expiration date: April 13, 2017 | Permit id: 2017-014988 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 21, 2017 | Expiration date: November 21, 2017 | Permit id: 2016-116989 Mp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116989 Bp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: November 14, 2017 | Expiration date: November 14, 2017 | Permit id: 2016-116989 Pp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116989 Ep | |||||
SCORE 98 Tpole for construction of apartments reference 2016116985 Date: February 8, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: April 19, 2017 | Expiration date: April 19, 2017 | Permit id: 2017-015002 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: October 18, 2017 | Expiration date: October 18, 2017 | Permit id: 2016-116985 Pp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 8, 2017 | Expiration date: May 6, 2018 | Permit id: 2016-116985 Mp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: November 13, 2017 | Expiration date: November 13, 2017 | Permit id: 2016-116985 Bp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: October 27, 2017 | Expiration date: October 27, 2017 | Permit id: 2016-116985 Ep | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116984 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 8, 2017 | Expiration date: May 8, 2017 | Permit id: 2017-043782 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 18, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: October 19, 2017 | Expiration date: October 19, 2017 | Permit id: 2016-116984 Pp | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 3, 2017 | Expiration date: November 3, 2017 | Permit id: 2016-116984 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 6, 2017 | Expiration date: November 6, 2017 | Permit id: 2016-116984 Ep | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: November 13, 2017 | Expiration date: November 13, 2017 | Permit id: 2016-116984 Bp | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116986 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 8, 2017 | Expiration date: May 8, 2017 | Permit id: 2017-043785 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 14, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: November 2, 2017 | Expiration date: November 2, 2017 | Permit id: 2016-116986 Pp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Final | Completion date: November 22, 2017 | Expiration date: November 22, 2017 | Permit id: 2016-116986 Bp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 14, 2017 | Expiration date: November 14, 2017 | Permit id: 2016-116986 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 14, 2017 | Expiration date: November 14, 2017 | Permit id: 2016-116986 Mp | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116990 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 15, 2017 | Expiration date: May 15, 2017 | Permit id: 2017-043789 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 18, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Final | Completion date: November 22, 2017 | Expiration date: November 22, 2017 | Permit id: 2016-1169 Pp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-1169 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-1169 Mp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-1169 Bp | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116991 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 8, 2017 | Expiration date: May 8, 2017 | Permit id: 2017-043793 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116991 Mp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 18, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116991 Pp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116991 Bp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116991 Ep | |||||
SCORE 98 Tpole for new construction of apartments refer to 2016116992 Date: April 13, 2017 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: May 8, 2017 | Expiration date: May 8, 2017 | Permit id: 2017-043796 Ep | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 18, 2016 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116992 Pp | |||||
SCORE 98 New construction for multifamily building 19 buildings total Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116992 Ep | |||||
SCORE 99 New construction for multifamily building 19 buildings total Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116992 Mp | |||||
SCORE 100 New construction for multifamily building 19 buildings total Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116992 Bp | |||||
SCORE 98 New construction accessory mail kiosk maintenance shop dog spa revision 1 to added square footage and dollar value Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116994 Ep | |||||
SCORE 99 New construction accessory mail kiosk maintenance shop dog spa revision 1 to added square footage and dollar value Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116994 Mp | |||||
SCORE 98 New construction accessory mail kiosk maintenance shop dog spa revision 1 to added square footage and dollar value Date: April 21, 2017 Contractor: Gregory Holloway Permit type: Plumbing permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2017-046605 Pp | |||||
SCORE 100 New construction accessory mail kiosk maintenance shop dog spa revision 1 to added square footage and dollar value Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116994 Bp | |||||
SCORE 99 New construction of 4 car garage for multifamily Date: January 17, 2017 Contractor: Jack Schaffer Permit type: Mechanical permit | Permit status: Final | Completion date: November 3, 2017 | Expiration date: November 3, 2017 | Permit id: 2016-116997 Mp | |||||
SCORE 98 New construction of 4 car garage for multifamily Date: November 28, 2016 Contractor: Onel Riveron Sr Permit type: Electrical permit | Permit status: Final | Completion date: November 6, 2017 | Expiration date: November 6, 2017 | Permit id: 2016-116997 Ep | |||||
SCORE 100 New construction of 4 car garage for multifamily Applicant Phone: (979) 412-2506 | Permit type: Building permit | Permit status: Active | Expiration date: May 26, 2018 | Permit id: 2016-116997 Bp |