Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Repair conduit service breakdown Date: April 29, 2011 Contractor: Pepco Holdings Inc Permit type: Paving; sidewalk (porous/pervious), excavation; repair electric service (exavation) | Permit status: Permit expired | Expiration date: May 31, 2011 | Permit id: Pa61946 | |||||
SCORE 95 3389929 - replace damaged door grate - 5 x 5 cut - 184 south of the south curb of l street, n. W. And 9 east of the east curb of connecticut ave., n. W. (kisamore) this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed Date: June 29, 2012 Contractor: Pepco Holdings Inc Permit type: Excavation; repair electric service (exavation) | Permit status: Approved (pending payment | Expiration date: July 30, 2012 | |||||
SCORE 100 The golden triangle bid requests a permit to install two benches in public space. Ddot is currently renovating the sidewalk at the site, scheduled to be completed march 15, 2013. The project manager at ipma is wendy peckham, wendy. Peckham@dc. Gov. The bid would install the benches after the ddot sidewalk work is completed. The benches will match the other benches on this block- see next attachments for layout and specifications. The bid respectfully requests a waiver of permit fees for this public space improvement. Date: February 22, 2013 Contractor: Golden Triangle Bid Golden Triangle Bid Permit type: Fixture; bench(es) | Permit status: Permit expired | Expiration date: May 10, 2013 | Permit id: Pa79814 | |||||
Dccr proposes to drill one geotechnical boring (pragi-11) located in the west parking lane east of 1648 35th st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The wor Date: October 20, 2015 Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: March 31, 2016 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-11) located in the west parking lane east of 1648 35th st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The wor Date: October 20, 2015 Contractor: E2cr Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: March 31, 2016 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Rejected | Expiration date: May 31, 2011 | Permit id: 0 | |||||
SCORE 93 Construction staging area Date: September 13, 2012 Contractor: Tw Telecom Of Dc, Llc Keith Davis Permit status: Expired | Expiration date: October 15, 2012 | Permit id: Pa10073133 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Resubmit | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 100 Excavation; monitoring well (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 95 Excavation; repair electric service (exavation) Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 95 Paving; sidewalk (porous pervious), excavation; repair electric service (exavation) Date: June 14, 2011 Contractor: Pepco Holdings Inc Permit status: 8 | Expiration date: May 31, 2011 | Permit id: Pa61946 | |||||
SCORE 95 3389929 - replace damaged door grate - 5 x 5 cut - 184 south of the south curb of l street, n. W. And 9 east of the east curb of connecticut ave., n. W. (kisamore) this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed Contractor: Pepco Holdings Inc Permit status: Cancel/withdrawn | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-11) located in the west parking lane east of 1648 35th st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The wor Contractor: E2cr Inc Permit status: Cancel/withdrawn | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 70 Scope of work : 1. Temp place crane on l st. Roadway to hoist materials & equipment between the hours of 7: am to 7: pm saturdays after hour permit required for work on sundays 2. Contractor shall use all signs shown on approved traffic control plan - failure to do so will result in revocation of this permit Contractor: Blake Development Corp Permit type: Occupancy; mobile crane(s), occupancy; as per approved tcp | Permit status: Permit expired | Expiration date: October 10, 2007 | Permit id: Pa30826 | |||||
SCORE 70 Scope of work : 1. Temp place crane on l st. Roadway to hoist materials & equipment between the hours of 7: am to 7: pm saturdays after hour permit required for work on sundays 2. Contractor shall use all signs shown on approved traffic control plan - failure to do so will result in revocation of this permit Contractor: Blake Development Corp Permit type: Occupancy; mobile crane(s), occupancy; as per approved tcp | Permit status: Permit expired | Expiration date: October 31, 2007 | Permit id: Pa30919 | |||||
SCORE 95 Excavation; repair electric service (exavation) Contractor: Pepco Holdings Inc Permit status: 3 | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 100 The golden triangle bid requests a permit to install two benches in public space. Ddot is currently renovating the sidewalk at the site, scheduled to be completed march 15, 2013. The project manager at ipma is wendy peckham, wendy. Peckham@dc. Gov. The bid would install the benches after the ddot sidewalk work is completed. The benches will match the other benches on this block- see next attachments for layout and specifications. The bid respectfully requests a waiver of permit fees for this public space improvement. Date: March 15, 2013 Contractor: Golden Triangle Bid Golden Triangle Bid Permit status: Permit expired | Expiration date: May 10, 2013 | Permit id: Pa79814 | |||||
SCORE 100 Excavation; monitoring well (single) Contractor: E2cr Inc Permit status: 3 | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 56 Occupy north side l street nw at address with crane hoist materials 7 am to 7 pm saturday & sunday after hour permit required for work on sunday Date: July 5, 2006 Contractor: Spring Field Crane Permit type: Occupancy; mobile crane(s), occupancy; see conditions | Permit status: Permit expired | Expiration date: July 8, 2006 | Permit id: Pa20707 | |||||
SCORE 70 Scope of work : 1. Temp place crane on l st. Roadway to hoist materials & equipment between the hours of 7: am to 7: pm saturdays after hour permit required for work on sundays 2. Contractor shall use all signs shown on approved traffic control plan - failure to do so will result in revocation of this permit Date: July 16, 2007 Contractor: Blake Development Corp Permit type: Occupancy; mobile crane(s), occupancy; as per approved tcp | Permit status: Permit expired | Expiration date: August 12, 2007 | Permit id: Pa28402 | |||||
SCORE 93 Steel plate- single location Date: September 14, 2012 Contractor: Tw Telecom Of Dc, Llc Keith Davis Permit status: Expired | Expiration date: September 21, 2012 | Permit id: Pa10073281 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Rejected | Expiration date: May 31, 2011 | Permit id: 0 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Resubmit | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 95 3389929 - replace damaged door grate - 5 x 5 cut - 184 south of the south curb of l street, n. W. And 9 east of the east curb of connecticut ave., n. W. (kisamore) this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed Contractor: Pepco Holdings Inc Permit status: Cancel/withdrawn | Expiration date: July 30, 2012 | Permit id: 0 | |||||
SCORE 88 Place 82 of (2) 1-1/2" hdpe e/w (1) 24 fiber and #6 awg tracer wire this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: August 8, 2012 Contractor: Tw Telecom Of Dc Llc Tw Telecom Of Dc Llc Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: December 17, 2012 | Permit id: Pa74327 | |||||
SCORE 86 A suspended roadway letter was received place 293 of (1) 1-1/4" quad duct e/w (1) 72 fiber and tracer wire place 33 of (1) 4" pvc e/w(3) 1-1/4" indt e/w (1) 144 fiber and tracer wire place (1) 4x4x4 manhole Date: September 16, 2015 Contractor: Xo Communications Keith Davis Permit type: Excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: January 28, 2016 | Permit id: Pa116081 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pragi-11) located in the west parking lane east of 1648 35th st nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used at backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional information. The wor Contractor: E2cr Inc Permit status: Cancel/withdrawn | Expiration date: March 31, 2016 | Permit id: 0 | |||||
SCORE 100 Moving truck Date: February 18, 2014 Contractor: Star International Movers Permit status: Permit expired | Expiration date: February 28, 2014 | Permit id: Pa10129929 | |||||
SCORE 56 Moving truck Date: January 2, 2015 Contractor: Miller Isley Permit status: Permit expired | Expiration date: January 3, 2015 | Permit id: Pa10172487 | |||||
SCORE 86 Construction staging area Date: November 25, 2015 Contractor: Xo Communications Keith Davis Permit status: Permit expired | Expiration date: December 11, 2015 | Permit id: Pa10219416 | |||||
SCORE 94 Other reserved parking Date: August 23, 2016 Contractor: D.C. Lottery Permit status: Permit expired | Expiration date: September 13, 2016 | Permit id: Pa10329290 |