Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit status: Active | Permit id: 744891 | |||||
Alteration permit ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit status: Active | Permit id: 726598 | |||||
Electrical permit ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit status: Active | Permit id: 739171 | |||||
SCORE 91 For level ii alterations to an existing personal care facility, alterations to include the erection of non bearing partition walls, provide finishes and furnishing throughout. Teant space is fully sprinklered. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for all other work. ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Alteration permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 741615 | |||||
SCORE 100 Interior plumbing alterations in the 1st floor activity rooms (united cerebral palsy) to install (4)15"x15" stainless steel sinks w gooseneck faucets & (1)point of use hot water heater - approval was granted to install fixture waste pumps - installation per the approved plan and the philadelphia plumbing code 2004 ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 19, 2017 | Permit id: 744891 | |||||
SCORE 91 For the installation replacement of register diffuser with associated ductwork. Work to be done in accordance with manufacturers specifications. All work to be done per approved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for all other work. Please see ap#741615 for approved plan. ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 19, 2017 | Permit id: 757996 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Suppression permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 765450 | |||||
SCORE 100 Roof replacement - install a 2 ply garland sps roof system (commercial) ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Alteration permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 726598 | |||||
SCORE 94 Partial electrical alterations within existing classroom area as per 2008 nec; replace led lamps, 4 new led fixtures, relocated 4 switches, 9 recetpacles, 2 exit signs, and 20-amp 120-volt circuit for small water heater ![]() ![]() Client: United Cerebral Palsy Assoc Of Phila & Vicinity | Permit type: Electrical permit | Permit status: Completed | Completion date: March 22, 2017 | Permit id: 739171 |