Building Permits at 1015 Half Street Se Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1015 Half Street Se Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Refer to permit number pa 43603 for inspection fee #01901-8960. 00, wet deposit fee #06384 -33334. 00; install 278lf 8" water main in k st se and 255lf 8" water main in l st se; install fire and domestic water laterals to 8" water main; install 64lf 10" pvc sanitary sewer main with 4" pvc sanitary sewer lateral; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work.
Date:  July 8, 2010

Client: Skanska Usa Building Inc | Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: October 16, 2010 | Permit id: Pa56456
2010/07/080951015 Half Street Se Washington Dc
SCORE
89
Milling and overlay of existing roadway paving along new building frontages on k street, l street and half street, se, per ddot standards, as per plans.
Date:  November 23, 2010

Client: Half Street Se, Llc Co Douglas Wilson Companies, Inc | Permit type: Paving; mill and overlay | Permit status: Cancel/withdrawn | Expiration date: January 4, 2011
2010/11/230891015 Half Street Se Washington DcSkanska Usa Building Operations
Excavation; new building
Date:  June 9, 2006

Permit status: Cancel/withdrawn
2006/06/090951015 Half Street Se Washington Dc
SCORE
64
Excavation; new building
Date:  June 9, 2006

Permit status: Cancel/withdrawn
2006/06/090641015 Half Street Se Washington DcCapitol Gateway Llc C O Poto
SCORE
61
Scope of work
Date:  January 9, 2007

Permit type: Occupancy; staging area(s), occupancy; sce(s), occupancy; raze deposit | Permit status: Cancel/withdrawn
2007/01/090611015 Half Street Se Washington DcCapitol Gateway Llc C O Pot
SCORE
82
Construction staging area
Date:  November 10, 2010

Permit status: Expired | Expiration date: January 31, 2011 | Permit id: Pa10014637
2010/11/100821015 Half Street Se Washington DcHalf Street Se, Llc C O Douglas Wilson Companies, Inc
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 20, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Notpaid | Expiration date: April 6, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 15, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Mobile crane work zone
Date:  July 22, 2010
Contractor: Miller And Long

Permit status: Expired | Expiration date: August 6, 2010 | Permit id: Pa10008523
2010/07/2201001015 Half Street Se Washington DcMiller And Long
SCORE
100
Mobile crane work zone
Date:  September 24, 2010

Permit status: Expired | Expiration date: October 16, 2010 | Permit id: Pa10013398
2010/09/2401001015 Half Street Se Washington DcCranerental Company Inc
SCORE
89
Paving; mill and overlay

Permit status: 3 | Expiration date: January 4, 2011 | Permit id: 0
0891015 Half Street Se Washington DcSkanska Usa Building Operations
SCORE
100
Construction staging area
Date:  October 14, 2010

Permit status: Expired | Expiration date: October 23, 2010 | Permit id: Pa10014685
2010/10/1401001015 Half Street Se Washington DcCranerental Company Inc
SCORE
56
Construction staging area
Date:  May 26, 2010
Contractor: Chris Seager

Permit status: Expired | Expiration date: November 12, 2010 | Permit id: Pa10004256
2010/05/260561015 Half Street Se Washington DcChris Seager
SCORE
99
Mobile crane work zone
Date:  August 17, 2010

Permit status: Expired | Expiration date: August 21, 2010 | Permit id: Pa10010614
2010/08/170991015 Half Street Se Washington DcJohnson Crane Service
SCORE
66
Occupancy; to cccupy public space
Contractor: Half Street Se Llc

Permit status: 3 | Permit id: 0
0661015 Half Street Se Washington DcHalf Street Se Llc
SCORE
66
Excavation; sheeting & shoring (for buildings), excavation; vault(s) 20x each

Permit status: 3 | Expiration date: December 18, 2009 | Permit id: 0
0661015 Half Street Se Washington Dc1015 Half Street Se Llc
SCORE
61
Occupancy; staging area(s), occupancy; sce(s), occupancy; raze deposit

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcCapitol Gateway Llc C O Pot
SCORE
61
Fixture; wall, free standing (exception over 30")
Contractor: Half St Se, Llc

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcHalf St Se, Llc
SCORE
61
Fixture; wall, free standing (exception over 30"), fixture; concrete handicapped ramp, steps,handrails guardra

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcHalf Street, Llc C O Opus East
SCORE
64
Excavation; new building

Permit status: 3 | Permit id: 0
0641015 Half Street Se Washington DcCapitol Gateway Llc C O Poto
SCORE
100
Occupancy; staging area(s), excavation; gas connection (trench)
Date:  June 9, 2009
Contractor: Washington Gas

Permit status: 8 | Expiration date: July 30, 2009 | Permit id: Pa47468
2009/06/0901001015 Half Street Se Washington DcWashington Gas
SCORE
95
1st-extension of permit#pa44913. Build manhole and mainline conduit (customer built) to connect to 1015 half street se; alley sq. # 697 b b half and k streets se. Attached plan and conditions are part of this permit.
Date:  May 20, 2009
Contractor: Pepco

Permit type: Excavation; electric connection (trench), excavation; manhole installation, excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: July 2, 2009 | Permit id: Pa44913-R1
2009/05/200951015 Half Street Se Washington DcPepco
SCORE
100
Install 2 of 4" hp main & 119 of 4" service; main in roadway on l st se; service in alley at 1015 half st se between south capital st & half st se, cut in alley way. Permit #94755, wr #688626, bca #38688. Attached sketch condition of permit. Ward #6
Date:  May 20, 2009
Contractor: Washington Gas

Permit type: Occupancy; staging area(s), excavation; gas connection (trench) | Permit status: Permit expired | Expiration date: July 30, 2009 | Permit id: Pa47468
2009/05/2001001015 Half Street Se Washington DcWashington Gas
SCORE
95
2nd-extension of permit#pa44913. Build manhole and mainline conduit (customer built) to connect to 1015 half street se; alley sq. # 697 b b half and k streets se. Attached plan and conditions are part of this permit.
Date:  July 1, 2009
Contractor: Pepco

Permit type: Excavation; electric connection (trench), excavation; manhole installation, excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: August 17, 2009 | Permit id: Pa44913-R2
2009/07/010951015 Half Street Se Washington DcPepco
SCORE
95
3rd-extension of permit#pa44913. Build manhole and mainline conduit (customer built) to connect to 1015 half street se; alley sq. # 697 b b half and k streets se. Attached plan and conditions are part of this permit.
Date:  August 14, 2009
Contractor: Pepco

Permit type: Excavation; electric connection (trench), excavation; manhole installation, excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: October 2, 2009 | Permit id: Pa44913-R3
2009/08/140951015 Half Street Se Washington DcPepco
SCORE
99
1st extension of permit number pa 43603; install 278of 8"water main with new breakaway fire hydrant in k st se; abandon existing fire hydrant in k st se; install 255 new 8" water main in l st se; install 64 of 10" sanitary sewer main; install one new sewer manhole with 4" pvc lateral; install new manhole with 12" pvc sanitary sewer lateral to existing 18" sewer manhole in l st se; abandon and remove 1 - small sewer service from existing 18" sewer main in l st se; attached plans and conditions are part of this permit; must contact system inspection oversight division (siod) before permanent restoration of public space at 202-671-2393
Date:  May 20, 2009
Contractor: Magnolia Plumbing

Client: Half St Llc | Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: August 31, 2009 | Permit id: Pa43603-R1
2009/05/200991015 Half Street Se Washington DcMagnolia Plumbing
SCORE
61
Fixture; wall, free standing (exception over 30")
Date:  April 9, 2008
Contractor: Half St Se, Llc

Permit status: Cancel/withdrawn | Permit id: 0
2008/04/090611015 Half Street Se Washington DcHalf St Se, Llc
SCORE
61
This permit is good for the duration of the fixture (fence, art work, sign, bike rack, bench, trash can, bollard)
Date:  May 2, 2008

Permit type: Fixture; wall, free standing (exception over 30"), fixture; concrete handicapped ramp, steps,handrails/guardra | Permit status: Cancel/withdrawn | Permit id: 0
2008/05/020611015 Half Street Se Washington DcHalf Street, Llc C O Opus East
SCORE
66
Occupancy; to cccupy public space
Date:  June 3, 2008
Contractor: Half Street Se Llc

Permit status: Cancel/withdrawn | Permit id: 0
2008/06/030661015 Half Street Se Washington DcHalf Street Se Llc
SCORE
66
Renewal of permit pa38859, tcp for excavation sheeting and shoring, installing pepco vaults. New expiration date of 6-18-09
Date:  June 18, 2009

Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) 20x each | Permit status: Cancel/withdrawn | Expiration date: December 18, 2009 | Permit id: 0
2009/06/180661015 Half Street Se Washington Dc1015 Half Street Se Llc
SCORE
64
Excavation; new building
Date:  June 9, 2006

Permit status: Cancel/withdrawn | Permit id: 0
2006/06/090641015 Half Street Se Washington DcCapitol Gateway Llc C O Poto
SCORE
95
Construction staging area

Permit status: Notpaid | Expiration date: December 6, 2016 | Permit id: 0
0951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 15, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Not paid | Expiration date: April 6, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 20, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
95
Construction staging area

Permit status: Not paid | Expiration date: December 6, 2016 | Permit id: 0
0951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
89
Install single (1) monitoring well in public space parking on k street se, west of north-south alley bordering building site, as directed by ddoe, per attached plan and detail.
Date:  June 6, 2011

Client: Half Street Se, Llc Co Douglas Wilson Companies, Inc | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 31, 2011 | Permit id: Pa63010
2011/06/060891015 Half Street Se Washington DcSkanska Usa Building Operations
SCORE
95
Repair gas service 28n c/l of l street se and 36 w c/l half street s at 1015 half st se between l st se and k st se, 4x5 cut over main, attached sketch condition of permit should be one year duration
Date:  May 5, 2011

Permit type: Excavation; repair gas service (excavation) | Permit status: Permit expired | Expiration date: July 31, 2011 | Permit id: Pa62194
2011/05/050951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
100
Refer to permit number pa 43603 for inspection fee #01901-8960. 00, wet deposit fee #06384 -33334. 00; install 278lf 8" water main in k st se and 255lf 8" water main in l st se; install fire and domestic water laterals to 8" water main; install 64lf 10" pvc sanitary sewer main with 4" pvc sanitary sewer lateral; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work.
Date:  July 8, 2010

Client: Skanska Usa Building Inc | Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: October 16, 2010 | Permit id: Pa56456
2010/07/0801001015 Half Street Se Washington DcMagnolia Plumbing And Heating
SCORE
95
Install new gas service; main in roadway on l st se; service in alley, at 1015 half st. Se off south capital st. Se between l st. Se and k st. Se, cut in alley way. Permit # 114112, wr# 688626, bca #38688 attached plans and conditions are part of this permit. Hours permitted to work are between 9: am to 3: pm monday thru friday.
Date:  July 14, 2010

Permit type: Excavation; gas connection (trench) | Permit status: Permit expired | Expiration date: January 3, 2011 | Permit id: Pa56573
2010/07/140951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
89
Install retaining wall, concrete handicapped ramp, steps and handrails/guardrails in public space to ddot requirements, as per public space committee-approved plans.
Date:  August 18, 2010

Client: Half Street Se, Llc C O Douglas Wilson Companies, Inc | Permit type: Paving; ada curb ramp, fixture; retaining wall to 42", projections; stoop & steps | Permit status: Permit expired | Expiration date: November 30, 2010 | Permit id: Pa57247
2010/08/180891015 Half Street Se Washington DcSkanska Usa Building Operations
SCORE
60
Install 15 new street lights and remove 6 street lights install for manholes for ddot we are waiving the six old lights (30000) and give credit for 160 in the system which makes the new total of 59,0 is needed now. Sunny 9/17/10
Date:  September 9, 2010
Contractor: Tower Davis

Client: Hal Street Se Llc C O Douglas Wilson Wilson | Permit type: Over head work; streetlight(s) installation, over head work; streetlight temporary removal | Permit status: Permit expired | Expiration date: December 15, 2010 | Permit id: Pa57606
2010/09/090601015 Half Street Se Washington DcTower Davis
SCORE
95
Excavate to place 35 of 4-4" telephone service conduit to 1015 half street se in roadway of l street between south capitol street and half street se and in sidewalk of half street se between k street and l street se as shown on job 9a07082. Hours permitted to work are between 9: am to 3: pm monday thru friday.
Date:  September 15, 2010
Contractor: Verizon

Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: December 5, 2010 | Permit id: Pa57668
2010/09/150951015 Half Street Se Washington DcVerizon
SCORE
89
Paving; mill and overlay

Permit status: 3 | Expiration date: January 4, 2011 | Permit id: 0
0891015 Half Street Se Washington DcSkanska Usa Building Operations
SCORE
89
Permit to occupy public space to perform the following work:installing and paving of alley(s), curb & gutter(s), side walk (s), and landscaping: planting of tree (s) and instaling tree box space(s) as per approved site plans and tcp. Note: 1. Work zone deposit fees for this permit has been waived, previous fees of amount-(144,020. 90), as per permit#pa57242 was paid on 9/16/2010. 2. This permit reads in conjunction with construction permit#pa57242 and occupancy permit#pa10014637. 3. All work must be done as per d. C. Standards and specifications. 4. The developer has submitted two (2) sets of sealed and sign copies of covenent maintenance agreement to the ddot p/s office.
Date:  April 17, 2009

Client: Half Street Se, Llc, C O Douglas Wilson | Permit type: Paving; alley(s), paving; curb & gutter(s), paving; sidewalk(s), landscaping; tree planting, landscaping; new tree space(s) | Permit status: Permit expired | Expiration date: May 8, 2011 | Permit id: Pa46553
2009/04/170891015 Half Street Se Washington DcSkanska Usa Building Operations
SCORE
64
Excavation; new building

Permit status: 3 | Permit id: 0
0641015 Half Street Se Washington DcCapitol Gateway Llc C O Poto
SCORE
95
1015 half st se, crew 351 making 4x4 3 s c/l k st se & 215 w c/l half st se, permit no: 706269 wr no: 3055928
Date:  October 14, 2016

Permit type: Excavation; repair gas service (excavation) | Permit status: Permit expired | Expiration date: December 12, 2016 | Permit id: Pa185220
2016/10/140951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
56
This permit is to cap (abandon) existing water and sanitary services. Winter moratorium is in-effect and waiver letter have been submitted. Plumbing company is responsible for 100% restoration to dc standard when weather permits. Contractor shall use all signs shown on approved traffic control plan - failure to do so will result in revocation of this permit. Sidewalk and roadway is to re-open when work is not in progress.
Date:  November 8, 2006

Permit type: Occupancy; abandonment of exist services, excavation; excavation_watersewer, excavation; abandonment of exist services | Permit status: Permit expired | Expiration date: January 8, 2007 | Permit id: Pa23631
2006/11/080561015 Half Street Se Washington DcCapital Gate Way Llc
SCORE
61
Occupancy; staging area(s), occupancy; sce(s), occupancy; raze deposit

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcCapitol Gateway Llc C O Pot
SCORE
56
Place crane truck materials and equipment. Hours: 7am-7pm sat. And sun. (half street side)
Date:  April 24, 2007

Permit type: Occupancy; mobile crane(s) | Permit status: Permit expired | Expiration date: May 24, 2007 | Permit id: Pa26534
2007/04/240561015 Half Street Se Washington DcCapitol Gateway, Llc
SCORE
61
Fixture; wall, free standing (exception over 30")
Contractor: Half St Se, Llc

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcHalf St Se, Llc
SCORE
61
Fixture; wall, free standing (exception over 30"), fixture; concrete handicapped ramp, steps,handrails guardra

Permit status: 3 | Permit id: 0
0611015 Half Street Se Washington DcHalf Street, Llc C O Opus East
SCORE
66
Occupancy; to cccupy public space
Contractor: Half Street Se Llc

Permit status: 3 | Permit id: 0
0661015 Half Street Se Washington DcHalf Street Se Llc
SCORE
66
Excavation for sheeting,shoring and installing electrical vaults for pepco use. These vaults will be owned and maintained by the owner. Net area for renting public space is 432. Square feet. Attached plans, pepco,verizon,wasa ,ipma and public space conditions are part of this permit. Work in the area must be co-ordinated between the contractors for the safety of the pedestrian and vehicular traffic. Temp.( add construction fence)
Date:  December 8, 2008
Contractor: Half Street Se Llc

Permit type: Occupancy; install tie backs and shouldier beams, excavation; sheeting & shoring (for buildings), excavation; install tie backs and shouldier beams, excavation; install tie backs and shouldier beams | Permit status: Permit expired | Permit id: Pa38859-R1
2008/12/080661015 Half Street Se Washington DcHalf Street Se Llc
SCORE
66
Excavation; sheeting & shoring (for buildings), excavation; vault(s) 20x each

Permit status: 3 | Expiration date: December 18, 2009 | Permit id: 0
0661015 Half Street Se Washington Dc1015 Half Street Se Llc
SCORE
56
Scope opf work to use the curb lane an sidewalk area as per tcp with a sce, temp construction fence and gates
Date:  December 11, 2007
Contractor: Half Street, Llc

Permit type: Occupancy; sce(s) | Permit status: Permit expired | Expiration date: May 14, 2008 | Permit id: Pa30233
2007/12/110561015 Half Street Se Washington DcHalf Street, Llc
SCORE
66
Excavation for sheeting,shoring and installing electrical vaults for pepco use. These vaults will be owned and maintained by the owner. Net area for renting public space is 432. Square feet. Attached plans, pepco,verizon,wasa ,ipma and public space conditions are part of this permit. Work in the area must be co-ordinated between the contractors for the safety of the pedestrian and vehicular traffic. Temp.( add construction fence)
Date:  June 20, 2008
Contractor: Half Street Se Llc

Permit type: Occupancy; install tie backs and shouldier beams, excavation; sheeting & shoring (for buildings), excavation; install tie backs and shouldier beams, excavation; install tie backs and shouldier beams | Permit status: Permit expired | Expiration date: June 19, 2009 | Permit id: Pa38859
2008/06/200661015 Half Street Se Washington DcHalf Street Se Llc
SCORE
56
Use of roadway to put up tower crane with 2 ton crane; monday thur saturday from 7 am to 7 pm.
Date:  August 13, 2008
Contractor: Half St Llc

Permit type: Occupancy; temporary use roadway to put up tower crane. | Permit status: Permit expired | Expiration date: September 18, 2008 | Permit id: Pa40680
2008/08/130561015 Half Street Se Washington DcHalf St Llc
SCORE
100
Use of roadway to put up tower crane with 2 ton crane; monday thru saturday from 7am to 7pm.
Date:  August 28, 2008
Contractor: Miller And Long

Permit type: Occupancy; tower crane(s) | Permit status: Permit expired | Expiration date: October 2, 2008 | Permit id: Pa41129
2008/08/2801001015 Half Street Se Washington DcMiller And Long
SCORE
99
Install 278of 8"water main with new breakaway fire hydrant in k st se; abandon existing fire hydrant in k st se; install 255 new 8" water main in l st se; install 64 of 10" sanitary sewer main; install one new sewer manhole with 4" pvc lateral; install new manhole with 12" pvc sanitary sewer lateral to existing 18" sewer manhole in l st se; abandon and remove 1 - small sewer service from existing 18" sewer main in l st se; attached plans and conditions are part of this permit; must contact ddot wholecost inspector r lee 202-369-5543 prior to start of work
Date:  January 15, 2009
Contractor: Magnolia Plumbing

Client: Half St Llc | Permit type: Excavation; water lateral connection to 2" | Permit status: Permit expired | Expiration date: May 23, 2009 | Permit id: Pa43603
2009/01/150991015 Half Street Se Washington DcMagnolia Plumbing
SCORE
95
Build manhole and mainline conduit (customer built) to connect to 1015 half street se; alley sq. # 697 b b half and k streets se. Attached plan and conditions are part of this permit.
Date:  March 4, 2009
Contractor: Pepco

Permit type: Excavation; electric connection (trench), excavation; manhole installation, excavation; repair electric ml conduit | Permit status: Permit expired | Expiration date: May 17, 2009 | Permit id: Pa44913
2009/03/040951015 Half Street Se Washington DcPepco
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Notpaid | Expiration date: April 6, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 15, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 20, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
95
Construction staging area

Permit status: Notpaid | Expiration date: December 6, 2016 | Permit id: 0
0951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
66
Other reserved parking
Date:  December 29, 2014
Contractor: Kimberly Csajko

Permit status: Permit expired | Expiration date: January 1, 2015 | Permit id: Pa10171652
2014/12/290661015 Half Street Se Washington DcKimberly Csajko
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Not paid | Expiration date: April 6, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 15, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
100
Other reserved parking
Contractor: Dc Lottery

Permit status: Withdrawn | Expiration date: May 20, 2015 | Permit id: 0
01001015 Half Street Se Washington DcDc Lottery
SCORE
98
Mobile crane work zone
Date:  April 21, 2015
Contractor: Crane Service Co

Permit status: Permit expired | Expiration date: April 25, 2015 | Permit id: Pa10185783
2015/04/210981015 Half Street Se Washington DcCrane Service Co
SCORE
95
Construction staging area

Permit status: Not paid | Expiration date: December 6, 2016 | Permit id: 0
0951015 Half Street Se Washington DcWash Gas And Light Co
SCORE
94
Other reserved parking
Date:  May 23, 2017
Contractor: D.C. Lottery

Permit status: Permit expired | Expiration date: June 15, 2017 | Permit id: Pa10398952
2017/05/230941015 Half Street Se Washington DcD.C. Lottery
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.