Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Minor alteration to existing master bathroom on the second level. Location of vanity and bathub/shower to be exchanged, one recessed light to be installed in above the proposed shower. Date: March 22, 2012 Client: Peter Denton | Applicant: Peter And Steph Denton; Ohi Engineering Group | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1206468 | |||||
Plumbing and gas Date: March 29, 2012 Client: Peter Denton | Applicant: Franklin T Gaines | Permit status: Permit issued | Permit id: P1204145 | |||||
SCORE 96 Plumbing and gas Date: March 29, 2012 Contractor: Franklin T Gaines Client: Peter Denton | Permit status: Permit issued | Permit id: P1204145 | |||||
SCORE 79 Electrical Date: March 28, 2012 Contractor: John A Traylor; John A Traylor Client: Stephanie Denton | Permit status: Permit issued | Permit id: E1204706 | |||||
SCORE 96 Electrical Date: April 5, 2016 Contractor: James A. Williams Client: Peter Denton | Permit status: Completed | Permit id: E1605276 | |||||
SCORE 56 Minor alteration to existing master bathroom on the second level. Location of vanity and bathub/shower to be exchanged, one recessed light to be installed in above the proposed shower. Date: March 22, 2012 Contractor: Peter And Steph Denton Ohi Engineering Group Client: Peter Denton | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1206468 | |||||
SCORE 96 Plumbing and gas Date: March 29, 2012 Contractor: Franklin T Gaines Client: Peter Denton | Permit status: Permit issued | Permit id: P1204145 | |||||
SCORE 79 Electrical Date: March 28, 2012 Contractor: John A Traylor John A Traylor Client: Stephanie Denton | Permit status: Permit issued | Permit id: E1204706 | |||||
SCORE 96 Electrical Date: April 5, 2016 Contractor: James A. Williams Client: Peter Denton | Permit status: Completed | Permit id: E1605276 | |||||
SCORE 79 Electrical Date: March 28, 2012 Contractor: John A Traylor; John A Traylor Client: Stephanie Denton | Permit status: Permit issued | Permit id: E1204706 | |||||
SCORE 96 Plumbing and gas Date: March 29, 2012 Contractor: Franklin T Gaines Client: Peter Denton | Permit status: Permit issued | Permit id: P1204145 | |||||
SCORE 61 Interior alternations to basement floor with updated fixtures in kitchen and bathroom spaces. Date: March 4, 2016 Contractor: Stephanie Denton Client: Stephanie Denton | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1605353 | |||||
SCORE 56 Interior renovation. Add new floor opening and stair between 1st floor and basement (unit 1) level of rowhouse. There will be a wall separation between stairs and basement unit. This stairs will be used as storage. Date: March 16, 2016 Contractor: Stephanie Denton; Gregoire Holeyman Client: Stephanie Denton | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1605832 | |||||
SCORE 96 Electrical Date: April 5, 2016 Contractor: James A. Williams Client: Peter Denton | Permit status: Completed | Permit id: E1605276 | |||||
SCORE 56 Minor alteration to existing master bathroom on the second level. Location of vanity and bathub/shower to be exchanged, one recessed light to be installed in above the proposed shower. Date: March 22, 2012 Contractor: Peter And Steph Denton; Ohi Engineering Group Client: Peter Denton | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1206468 |