Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Hra- solar photovoltaic system -roof mounted ( 21 modules, 3. 7 kw, one inverter) for existing sfd. Per section 46 (i) of the zoning ordinance, the photovoltaic system is not to extend more than 5 above the highest point of the existing roof. Date: March 20, 2008 Contractor: Clean Power Systems Inc Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1030-20 | Parcel: 405-200-21-00 |