Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Excavation & shoring only. Date: December 19, 2013 Contractor: Steven Dellorto Current use: Office | Permit id: #201312194603 | |||||
SCORE 95 To erect 61 stories with 3 basements office retail parking building. Date: March 13, 2013 Contractor: Owner Current use: Office | Permit id: #201303132080 | |||||
Install 8 foot diameter drilled reinforced concrete caisson from existing grade using emporary casing. After drilling installation of the reinforcing cage and placing concrete an osterberg cell bi-directional load test will be performed. Date: March 20, 2013 Value: $225,000 Current use: Office | Permit id: #201303202641 | |||||
SCORE 96 Rev. To pa#201303202641 test load bearing element schedule and details. Current use: Office | Permit id: #201308083906 | |||||
SCORE 96 To erect 63 stories with 3 basements office retail parking building. Current use: Office | Permit id: #201303132080 | |||||
SCORE 96 Revision to 201308083906. Add another test load bearing element schedule and details. Plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. Compliance with ordinance no 155-13 required. Excavation yd - (see exempt letter from health dept) Current use: Office | Permit id: #201401075767 | |||||
SCORE 96 Underground fire service only 2-8 inch fire services. Date: November 14, 2014 Contractor: Steven Dellorto Current use: Vacant lot | Permit id: #201411141521 | |||||
SCORE 67 Excavation & shoring only. Cdsm bracing tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Current use: Vacant lot | Permit id: #201312194603 | |||||
SCORE 96 Revision to pa 201312194603 excavation & shoring; revised excavation & shoring on levels a-d revise shoring connection detatils; maher n a (health approved previous appn) Date: July 22, 2014 Contractor: Steven Dellorto Current use: Vacant lot | Permit id: #201407221817 | |||||
Install temp electrical service for transbay tower Date: September 5, 2014 Permit id: #201409055532 | |||||
Erect tower crane 2 along 1st street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Date: June 26, 2015 Permit type: Building permit | Current use: Office | Permit id: #201506260126 | |||||
SCORE 98 Install 2 sewer laterals. Contractor: A And B Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150805897 | |||||
Erect 3 electric single faced wall signs for "salesforce". N/a ordinance #155-13 Date: April 23, 2015 Permit type: Building permit | Permit id: #201504234433 | |||||
Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Date: June 26, 2015 Permit type: Building permit | Current use: Office | Permit id: #201506260124 | |||||
SCORE 95 New construction: provide electrical infrastructure for 63-story building reaching containing 1. 09m sf of office psace 9823sf of retail space 283k sf publicly accessible open space and 847 if sub parking area. Core and shell protect only incluing (8) 4000a and (2) 2500a service from pg&e. Normal power busduct distrib riser to electrical rooms and emergency fuel generator back power source. Date: July 28, 2015 Contractor: Sasco Permit type: Electrical permit | Permit status: Issued | Permit id: E20150716100 | |||||
SCORE 95 Provide electrical infrastructure for 63-store building reaching containing 1 0 937 sq ft of office space 9 823 sp ft of retail space 28 3 sq ft publicly accessible open space and 84 7 of subterranean parking area. Core and shell protect only including (8) 4000a and (2) 2500a servicies from pg&e. Normal power busduct distribution riser to electrical rooms and emergency fuel generator back poer source. Date: July 28, 2015 Contractor: Sasco Permit type: Electrical permit | Permit status: Filed | Permit id: E20150728371 | |||||
Revision to pa# 2013/12/19/4603-r1. Phase ii - shoring. Installation of jet grout columns sealant pies rc slab to support excavation for repair of lbes. Monitoring plan for lbe excavation shoring & construction sequence. Maher: n/a Value: $70,000 Permit type: Additions alterations or repairs | Permit status: Filed | Completion date: August 16, 2016 | Permit id: 201608165156 | |||||
SCORE 95 Temp power - 4000amp. Date: October 21, 2014 Contractor: Sasco Permit type: Electrical permit | Permit status: Filed | Permit id: E201410213814 | |||||
SCORE 95 Install 1-4000amp temp power. Date: October 23, 2014 Contractor: Sasco Permit type: Electrical permit | Permit status: Issued | Permit id: E201410233876 | |||||
SCORE 95 57 stations for modular partitions only Date: October 28, 2014 Contractor: Service West Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20141028841 | |||||
Revision to architectural and mep addendum reference pa#2013031320 s-3. Date: May 5, 2016 Permit type: Building permit | Current use: Office | Permit id: #201605056637 | |||||
Revision to pa 201312194603 excavation & shoring; revised excavation & shoring on levels a-d revise shoring connection detatils; maher n a (health approved previous appn) Date: July 22, 2014 Value: $100,000 Permit type: Additions alterations or repairs | Permit status: Withdrawn | Expiration date: July 22, 2014 | Permit id: 201407221817 | |||||
SCORE 96 Rev. To pa#201303202641 test load bearing element schedule and details. Permit type: Building permit | Expiration date: December 9, 2013 | Current use: Office | Permit id: #201308083906 | |||||
Revision to pa 201312194603 excavation & shoring; revised excavation & shoring on levels a-d revise shoring connection detatils; maher n/a (health approved previous appn) Value: $100,000 Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: July 22, 2014 | Permit id: 201407221817 | |||||
Street space Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 8, 2015 | Permit id: M628427 | |||||
SCORE 98 Install 2 sewer laterals. Date: August 5, 2015 Contractor: A And B Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150805897 | |||||
SCORE 96 Excavation & shoring only. Date: December 19, 2013 Contractor: Steven Dellorto Permit type: Building permit | Current use: Office | Permit id: #201312194603 | |||||
SCORE 96 Revision to 201308083906. Add another test load bearing element schedule and details. Plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. Compliance with ordinance no 155-13 required. Excavation > yd - (see exempt letter from health dept) Permit type: Building permit | Expiration date: January 14, 2015 | Current use: Office | Permit id: #201401075767 | |||||
SCORE 95 Salesforce tower - installation of bms Date: July 6, 2016 Contractor: Mcmillan Bros Electric Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201607069160 | |||||
To erect 61 stories with 3 basements office retail parking building. Date: March 13, 2013 Permit type: Building permit | Current use: Office | Permit id: #201303132080 | |||||
Install 8 foot diameter drilled reinforced concrete caisson from existing grade using emporary casing. After drilling installation of the reinforcing cage and placing concrete an osterberg cell bi-directional load test will be performed. Date: March 20, 2013 Value: $225,000 Permit type: Building permit | Expiration date: March 29, 2014 | Current use: Office | Permit id: #201303202641 | |||||
Revision to 201308083906. Add another test load bearing element schedule and details. Plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. Compliance with ordinance no 155-13 required. Excavation > yd - (see exempt letter from health dept) Value: $20,000 Permit type: Otc alterations permit | Permit status: Complete | Completion date: January 7, 2014 | Expiration date: December 29, 2016 | Permit id: 201401075767 | |||||
SCORE 67 Excavation & shoring only. Cdsm bracing tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Permit type: Building permit | Expiration date: May 7, 2017 | Current use: Vacant lot | Permit id: #201312194603 | |||||
Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Value: $125,000 Permit type: Otc alterations permit | Permit status: Issued | Completion date: June 26, 2015 | Expiration date: August 6, 2017 | Current use: Vacant lot | Permit id: 201506260124 | |||||
SCORE 96 To erect 63 stories with 3 basements office retail parking building. Permit type: Building permit | Expiration date: September 27, 2019 | Current use: Office | Permit id: #201303132080 | |||||
Install temp electrical service for transbay tower Date: September 5, 2014 Permit type: Building permit | Permit id: #201409055532 | |||||
SCORE 95 Rough electrical conduit for security system. Date: September 26, 2016 Contractor: Brayer Electric Company Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201609260772 | |||||
Erect tower crane 2 along 1st street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Value: $125,000 Permit type: Otc alterations permit | Permit status: Issued | Completion date: June 26, 2015 | Expiration date: August 6, 2017 | Current use: Vacant lot | Permit id: 201506260126 | |||||
SCORE 100 Work category: 4pb; overhead fire protection - floors 2 thru 30 Date: September 14, 2016 Contractor: Superior Automatic Sprinkler Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20160914482 | |||||
Street space permit Permit type: Otc alterations permit | Permit status: Issued | Completion date: April 14, 2016 | Permit id: M681488 | |||||
To erect 63 stories with 3 basements office retail parking building. Value: $272,000,000 Permit type: New construction | Permit status: Issued | Completion date: March 13, 2013 | Expiration date: December 1, 2021 | Permit id: 201303132080 | |||||
Streetspace Permit type: Otc alterations permit | Permit status: Issued | Completion date: September 23, 2013 | Permit id: M428747 | |||||
Rev to app #201312194603 revision 1 excavation of lbes below the main excavation of transbay tower project: summary (1) installation of jet grout columns secant piles and rc slab to support the excavation for repair of lbes 2. Monitoring plan 3. Sequencing of primary milestones during constrution. Value: $10,000,000 Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: March 6, 2015 | Expiration date: August 28, 2018 | Current use: Vacant lot | Permit id: 201503060222 | |||||
Excavation & shoring only. Cdsm bracing tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Value: $100,000 Permit type: Additions alterations or repairs | Permit status: Issued | Completion date: December 19, 2013 | Expiration date: April 16, 2018 | Permit id: 201312194603 | |||||
Install underground fire services only two 8-inch fire services one off of 8-inch main on 1st st and one off of 12-inch main on mission st. (mission & 1st street) Value: $35,000 Permit type: Otc alterations permit | Permit status: Issued | Completion date: November 14, 2014 | Expiration date: August 12, 2016 | Permit id: 201411141521 | |||||
Erect 3 electric single faced wall signs for "salesforce". N/a ordinance #155-13 Value: $300,000 Permit type: Sign-errect | Permit status: Filed | Completion date: April 23, 2015 | Current use: Office | Permit id: 201504234433 | |||||
Street space permit Permit type: Otc alterations permit | Permit status: Issued | Completion date: October 6, 2014 | Permit id: M524167 | |||||
Rev. To pa#201303202641 test load bearing element schedule and details. Value: $1 Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 8, 2013 | Expiration date: August 4, 2014 | Current use: Vacant lot | Permit id: 201308083906 | |||||
Revision to architectural and mep addendum reference pa#2013031320 s-3. Value: $1 Permit type: Additions alterations or repairs | Permit status: Filed | Completion date: May 5, 2016 | Current use: Vacant lot | Permit id: 201605056637 | |||||
Erect 3 electric single faced wall signs for "salesforce". N a ordinance #155-13 Date: April 23, 2015 Permit type: Building permit | Permit id: #201504234433 | |||||
Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: June 26, 2015 Permit type: Building permit | Current use: Office | Permit id: #201506260124 | |||||
Erect tower crane 2 along 1st street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: June 26, 2015 Permit type: Building permit | Current use: Office | Permit id: #201506260126 | |||||
SCORE 95 To erect 61 stories with 3 basements office retail parking building. Date: March 13, 2013 Contractor: Owner Permit type: Building permit | Current use: Office | Permit id: #201303132080 | |||||
Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: June 26, 2015 Value: $125,000 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: June 26, 2015 | Current use: Vacant lot | Permit id: 201506260124 | |||||
SCORE 67 Excavation & shoring only. Cdsm bracing tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Permit type: Building permit | Expiration date: May 7, 2017 | Current use: Vacant lot | Permit id: #201312194603 | |||||
Erect tower crane 2 along 1st street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: June 26, 2015 Value: $125,000 Permit type: Otc alterations permit | Permit status: Issued | Expiration date: June 26, 2015 | Current use: Vacant lot | Permit id: 201506260126 | |||||
Revision to pa# 2013 12 19 4603-r1. Phase ii - shoring. Installation of jet grout columns sealant pies rc slab to support excavation for repair of lbes. Monitoring plan for lbe excavation shoring & construction sequence. Maher: n a Date: August 16, 2016 Value: $70,000 Permit type: Additions alterations or repairs | Permit status: Issued | Expiration date: August 16, 2016 | Permit id: 201608165156 | |||||
Erect 3 electric single faced wall signs for "salesforce". N a ordinance #155-13 Date: April 23, 2015 Value: $300,000 Permit type: Sign-errect | Permit status: Filed | Expiration date: April 23, 2015 | Current use: Office | Permit id: 201504234433 | |||||
57 stations for modular partitions only Permit status: Expired | Permit id: Ew20141028841 | |||||
New construction: provide electrical infrastructure for 63-story building reaching containing 1. 09m sf of office psace 9823sf of retail space 283k sf publicly accessible open space and 847 if sub parking area. Core and shell protect only incluing (8) 4000a and (2) 2500a service from pg&e. Normal power busduct distrib riser to electrical rooms and emergency fuel generator back power source. Permit status: Issued | Permit id: E20150716100 | |||||
Salesforce tower - installation of bms Permit status: Filed | Permit id: Ew201607069160 | |||||
Install 1-4000amp temp power. Permit status: Issued | Permit id: E201410233876 | |||||
Rough electrical conduit for security system. Permit status: Filed | Permit id: Ew201609260772 | |||||
Install2sewerlaterals. Date: August 5, 2015 Permit status: Issued | Expiration date: August 5, 2015 | Permit id: Pp20150805897 | |||||
Work category: 4pb; overhead fire protection - floors 2 thru 30 Date: September 14, 2016 Permit status: Issued | Expiration date: September 14, 2016 | Permit id: Pw20160914482 | |||||
Install 1-4000amp temp power. Permit status: Issued | Permit id: E201410233876 | |||||
57 stations for modular partitions only Permit status: Expired | Permit id: Ew20141028841 | |||||
New construction: provide electrical infrastructure for 63-story building reaching containing 1. 09m sf of office psace 9823sf of retail space 283k sf publicly accessible open space and 847 if sub parking area. Core and shell protect only incluing (8) 4000a and (2) 2500a service from pg&e. Normal power busduct distrib riser to electrical rooms and emergency fuel generator back power source. Permit status: Issued | Permit id: E20150716100 | |||||
Salesforce tower - installation of bms Permit status: Filed | Permit id: Ew201607069160 | |||||
Rough electrical conduit for security system. Permit status: Filed | Permit id: Ew201609260772 | |||||
Revision to 2013031320 s3 to update fire fighters smoke control panel & elevator lighting, outlets maher na Date: March 20, 2017 Value: $1 Permit type: Otc alterations permit | Expiration date: January 30, 2017 | Current use: Office | Permit id: 201701308251 | |||||
Revision to pa# 2013 03 13 2080-s4 for screen wall framing & building maintenance unit support structure above level 62. Maher: n a Date: May 9, 2017 Value: $1 Permit type: Additions alterations or repairs | Expiration date: March 17, 2017 | Permit id: 201703171743 | |||||
Revision to pa 2013-0313-2080s3 r5 relocate fuel oil vent pipes Date: June 6, 2017 Value: $1,000 Permit type: Otc alterations permit | Expiration date: May 25, 2017 | Current use: Vacant lot | Permit id: 201705257697 | |||||
The projectwill proving transbay tower with parking stackers alloring for an additional 2 parking spce. Ref pa #2013031320850-s n a for maher ordiannce. Date: June 13, 2017 Value: $1 Permit type: Additions alterations or repairs | Expiration date: June 13, 2017 | Current use: Office | Permit id: 201706139224 | |||||
Exterior signage for saleforce, set into pavers on ground. Date: September 20, 2017 Value: $2,000 Permit type: Sign - erect | Expiration date: September 20, 2017 | Current use: Office | Permit id: 201709209076 | |||||
Excavation & shoring only. Cdsm, bracing, tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Date: May 7, 2014 Value: $100,000 Permit type: Additions alterations or repairs | Completion date: August 15, 2017 | Expiration date: December 19, 2013 | Permit id: 201312194603 | |||||
Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: August 6, 2015 Value: $125,000 Permit type: Otc alterations permit | Completion date: August 10, 2017 | Expiration date: June 26, 2015 | Current use: Vacant lot | Permit id: 201506260124 | |||||
Erect tower crane 2 along 1st street. Sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N a for maher ordinance. Date: August 6, 2015 Value: $125,000 Permit type: Otc alterations permit | Completion date: August 10, 2017 | Expiration date: June 26, 2015 | Current use: Vacant lot | Permit id: 201506260126 | |||||
47, 48 and 49th floor - structural stair for architectural permits ref pa 2017-0517-6809, 2017-0517-6807 and 2017-0517-6810 Date: October 20, 2017 Value: $1 Permit type: Additions alterations or repairs | Expiration date: July 14, 2017 | Current use: Vacant lot | Permit id: 201707141919 | |||||
2 f- non structural demo, (n) non structural partitions, doors, ceiling, lighting, electrical, millwork & finishes. No change in occupancy, use or area. Mep., life safety, sprinkler under seperate permit. N a ordinance #155-13 Date: August 25, 2017 Value: $162,240 Permit type: Otc alterations permit | Expiration date: August 18, 2017 | Current use: Vacant lot | Permit id: 201708185212 | |||||
Electric wall sign for salesforce tower; installed atop canopy Date: September 20, 2017 Value: $2,000 Permit type: Sign - erect | Expiration date: September 20, 2017 | Current use: Office | Permit id: 201709209077 | |||||
2 monument signs for salesforce tower sign type tn. 01, tn. 02 Date: September 20, 2017 Value: $5,000 Permit type: Otc alterations permit | Expiration date: September 20, 2017 | Current use: Office | Permit id: 201709209080 | |||||
Mep for 201708185212 maher not req Date: October 3, 2017 Value: $50,000 Permit type: Otc alterations permit | Expiration date: October 3, 2017 | Current use: Vacant lot | Permit id: 201710030176 | |||||
Fire sprinkler permits. Relocate 17, add 3, delete 5 pendents, relocate 1 and delete 8 uprights on the 2nd floor. T. I pa# 201708185212. Na for maker. Date: October 11, 2017 Value: $6,000 Permit type: Otc alterations permit | Completion date: October 31, 2017 | Expiration date: October 10, 2017 | Current use: Office | Permit id: 201710100741 | |||||
Revision to pa# 2013 03 13 2080-s15 landscaping. Revision to ground level zone 1 & 2. 5th level zone 3. Changing location of trels. Add public art. Add detectable surface. Add tree uplight. Maher: n a Date: October 19, 2017 Value: $1,000 Permit type: Additions alterations or repairs | Expiration date: October 19, 2017 | Current use: Office | Permit id: 201710191690 | |||||
Revision to smoke control system for 47th, 48th, 49th fl Date: January 5, 2018 Value: $1 Permit type: Otc alterations permit | Expiration date: January 5, 2018 | Current use: Office | Permit id: 201801057907 | |||||
To erect 63 stories with 3 basements, office, retail, parking building. Date: September 27, 2013 Value: $272,000,000 Permit type: New construction | Expiration date: March 13, 2013 | Permit id: 201303132080 | |||||
Install 8 foot diameter drilled reinforced concrete caisson from existing grade using emporary casing. After drilling, installation of the reinforcing cage, and placing concrete, an osterberg cell bi-directional load test will be performed. Date: March 29, 2013 Value: $225,000 Permit type: Otc alterations permit | Completion date: January 5, 2015 | Expiration date: March 20, 2013 | Current use: Vacant lot | Permit id: 201303202641 | |||||
Revision to 201308083906. Add another test load bearing element, schedule and details. Plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. Compliance with ordinance no 155-13 required. Excavation > yd - (see exempt letter from health dept) Date: January 14, 2014 Value: $20,000 Permit type: Otc alterations permit | Completion date: January 5, 2015 | Expiration date: January 7, 2014 | Permit id: 201401075767 | |||||
Revision to pa 201312194603, excavation & shoring; revised excavation & shoring on levels a-d, revise shoring connection detatils; maher n a (health approved previous appn) Date: July 22, 2014 Value: $100,000 Permit type: Additions alterations or repairs | Expiration date: July 22, 2014 | Permit id: 201407221817 | |||||
Install underground fire services only, two 8-inch fire services, one off of 8-inch main on 1st st and one off of 12-inch main on mission st. (mission & 1st street) Date: August 12, 2015 Value: $35,000 Permit type: Otc alterations permit | Completion date: June 16, 2017 | Expiration date: November 14, 2014 | Permit id: 201411141521 | |||||
Rev to app #201312194603 revision 1, excavation of lbes below the main excavation of transbay tower project: summary (1) installation of jet grout columns, secant piles and rc slab to support the excavation for repair of lbes 2. Monitoring plan 3. Sequencing of primary milestones during constrution. Date: August 28, 2015 Value: $10,000,000 Permit type: Additions alterations or repairs | Completion date: November 5, 2015 | Expiration date: March 6, 2015 | Current use: Vacant lot | Permit id: 201503060222 | |||||
Revision to architectural and mep addendum reference pa#2013031320 s-3. Maher: n a Date: January 27, 2017 Value: $1 Permit type: Additions alterations or repairs | Expiration date: May 5, 2016 | Current use: Vacant lot | Permit id: 201605056637 | |||||
Revision to pa# 2013 12 19 4603-r1. Phase ii - shoring. Installation of jet grout columns, sealant pies rc slab to support excavation for repair of lbes. Monitoring plan for lbe excavation shoring & construction sequence. Maher: n a Date: December 9, 2016 Value: $70,000 Permit type: Additions alterations or repairs | Expiration date: August 16, 2016 | Permit id: 201608165156 | |||||
Witness test for fire alarm final tco @ salesforce tower-building office - 101 1st st, 2nd floor. See permit #ew201709208111 Date: October 25, 2017 Permit status: Complete | Completion date: November 1, 2017 | Permit id: Ew201710258857 | |||||
Office t i including lighting, power and fire alarm devices @ salesforce tower building office - 101 1st street, 2nd floor Date: September 20, 2017 Permit status: Complete | Completion date: November 28, 2017 | Permit id: Ew201709208111 | |||||
Installing data, low voltage cabling in various locations throughout the building. Date: February 14, 2017 Permit status: Issued | Permit id: Ew201702143566 | |||||
Salesforce tower - installation of bms Date: July 6, 2016 Permit status: Issued | Permit id: Ew201607069160 | |||||
Rough electrical conduit for security system. Date: September 26, 2016 Permit status: Issued | Permit id: Ew201609260772 | |||||
New construction: provide electrical infrastructure for 63-story building reaching containing 1. 09m sf of office psace, 9823sf of retail space, 283k sf publicly accessible open space and 847 if sub parking area. Core and shell protect only incluing (8) 4000a and (2) 2500a service from pg&e. Normal power busduct distrib riser to electrical rooms and emergency fuel generator back power source. Date: July 28, 2015 Permit status: Issued | Permit id: E20150716100 | |||||
Install 1-4000amp temp power. Date: October 23, 2014 Permit status: Complete | Completion date: September 29, 2017 | Permit id: E201410233876 | |||||
Network cabling, including (32) cales @ 101 first street, 2nd floor Date: October 11, 2017 Permit status: Issued | Permit id: Ew201710118554 | |||||
57 stations for modular partitions only Date: October 28, 2014 Permit status: Expired | Permit id: Ew20141028841 | |||||
Install 2 sewer laterals. Date: August 5, 2015 Permit status: Complete | Completion date: October 5, 2015 | Expiration date: August 5, 2015 | Permit id: Pp20150805897 | |||||
Work category: 5p; flood test of shower pan on level p2. Date: June 5, 2017 Permit status: Issued | Expiration date: June 5, 2017 | Permit id: Pw20170605596 | |||||
This pays for inspections related to original permit # pw20171018681 filed 10 18 2017. Dow: work category: 4pb; fire sprinkler ti : relocate 17 and add 3 pendent heads. Add one upright head Date: October 18, 2017 Permit status: Complete | Completion date: October 25, 2017 | Expiration date: October 18, 2017 | Permit id: Pw20171018682 | |||||
Work category: 5p; rough and trim install one (1) kitchen sink with chronomite and dishwasher provided by others. Date: September 20, 2017 Permit status: Complete | Completion date: October 27, 2017 | Expiration date: September 20, 2017 | Permit id: Pw20170920092 | |||||
SCORE 96 Erect tower crane 1 at corner of mission and fremont street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc. L litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Permit type: Building permit | Expiration date: August 6, 2017 | Current use: Office | Permit id: #201506260124 | |||||
SCORE 96 Erect tower crane 2 along 1st street. Sow includes furnishing installing jumping and dismantiling liebher. 542 hc-l litronic tower crane. Ref app#201303132080. N/a for maher ordinance. Permit type: Building permit | Expiration date: August 6, 2017 | Current use: Office | Permit id: #201506260126 | |||||
SCORE 100 2 f- non structural demo (n) non structural partitions doors ceiling lighting electrical millwork & finishes. No change in occupancy use or area. Mep. Life safety sprinkler under seperate permit. N a ordinance #155-13 Permit type: Building permit | Expiration date: August 25, 2018 | Current use: Office | Permit id: #201708185212 | |||||
SCORE 96 Revision to pa# 2013/12/19/4603-r1. Phase ii - shoring. Installation of jet grout columns sealant pies rc slab to support excavation for repair of lbes. Monitoring plan for lbe excavation shoring & construction sequence. Maher: n/a Permit type: Building permit | Current use: Vacant lot | Permit id: #201608165156 | |||||
SCORE 95 Installing data low voltage cabling in various locations throughout the building. Date: February 14, 2017 Contractor: Sasco Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201702143566 | |||||
SCORE 96 Exterior signage for saleforce set into pavers on ground. Permit type: Building permit | Expiration date: June 9, 2018 | Permit id: #201709209076 | |||||
SCORE 96 Electric wall sign for salesforce tower; installed atop canopy Permit type: Building permit | Expiration date: June 9, 2018 | Permit id: #201709209077 | |||||
SCORE 100 Revision to pa# 2013 03 13 2080-s15 landscaping. Revision to ground level zone 1 & 2. 5th level zone 3. Changing location of trees. Add public art. Add detectable surface. Add tree uplight. Other various architecture details. Maher: n a Permit type: Building permit | Expiration date: February 9, 2019 | Current use: Office | Permit id: #201710191690 | |||||
SCORE 96 2 monument signs for salesforce tower sign type tn. 01 tn. 02. Maher na Permit type: Building permit | Expiration date: June 9, 2018 | Permit id: #201802070632 | |||||
Deferred fire sprinkler permit for added car stackers. Reference permit application #2017 0613 9224. Maher: n a Date: February 14, 2018 Permit type: Building permit | Current use: Office | Permit id: #201802141314 | |||||
Defered structural electrical & plumbing for landscape - reference pa#2017-1019-16 & site permit pa#2013-0313-2080. Date: February 16, 2018 Permit type: Building permit | Permit id: #201802161592 | |||||
SCORE 96 Revision to architectural and mep addendum reference pa#2013031320 s-3. Maher: n a Permit type: Building permit | Expiration date: January 27, 2018 | Current use: Office | Permit id: #201605056637 | |||||
Revision to 2013031320 s3 to update fire fighters smoke control panel & elevator lighting outlets maher na Date: January 30, 2017 Permit type: Building permit | Current use: Office | Permit id: #201701308251 | |||||
SCORE 100 Revision to smoke control system for 47th 48th 49th fls. N a for maher Permit type: Building permit | Expiration date: May 8, 2018 | Current use: Office | Permit id: #201801057907 | |||||
SCORE 96 Revision to pa 201312194603 excavation & shoring; revised excavation & shoring on levels a-d revise shoring connection detatils; maher n/a (health approved previous appn) Date: July 22, 2014 Contractor: Steven Dellorto Permit type: Building permit | Current use: Vacant lot | Permit id: #201407221817 | |||||
47 48 and 49th floor - structural stair for architectural permits ref pa 2017-0517-6809 2017-0517-6807 and 2017-0517-6810 Date: July 14, 2017 Permit type: Building permit | Current use: Office | Permit id: #201707141919 | |||||
SCORE 100 Revision to pa 2013-0313-2080s3 r5 relocate fuel oil vent pipes Permit type: Building permit | Expiration date: December 6, 2017 | Current use: Office | Permit id: #201705257697 | |||||
The projectwill proving transbay tower with parking stackers alloring for an additional 2 parking spce. Ref pa #2013031320850-s n a for maher ordiannce. Date: June 13, 2017 Permit type: Building permit | Current use: Office | Permit id: #201706139224 | |||||
SCORE 100 Work category: 5p; flood test of shower pan on level p2. Date: June 5, 2017 Contractor: D And J Tile Company Inc Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170605596 | |||||
SCORE 100 To erect 61 stories with 3 basements office retail parking building. Date: March 13, 2013 Contractor: Owner Owner Permit type: Building permit | Current use: Office | Permit id: #201303132080 | |||||
SCORE 100 Rev to app #201312194603 revision 1 excavation of lbes below the main excavation of transbay tower project: summary (1) installation of jet grout columns secant piles and rc slab to support the excavation for repair of lbes 2. Monitoring plan 3. Sequencing of primary milestones during constrution. Permit type: Building permit | Current use: Vacant lot | Permit id: #201503060222 | |||||
SCORE 96 Revision to 2013031320 s3 to update fire fighters smoke control panel & elevator lighting outlets maher na Permit type: Building permit | Expiration date: July 20, 2017 | Current use: Office | Permit id: #201701308251 | |||||
Revision to pa# 2013 03 13 2080-s4 for screen wall framing & building maintenance unit support structure above level 62. Maher: n a Date: March 17, 2017 Permit type: Building permit | Current use: Office | Permit id: #201703171743 | |||||
SCORE 67 Excavation & shoring only. Cdsm bracing tie back. Compliance with ordinance no# 155-13 exempted. Approval from dph attached. Permit type: Building permit | Expiration date: May 7, 2017 | Current use: Vacant lot | Permit id: #201312194603 | |||||
SCORE 96 Install underground fire services only two 8-inch fire services one off of 8-inch main on 1st st and one off of 12-inch main on mission st. (mission & 1st street) Permit type: Building permit | Current use: Vacant lot | Permit id: #201411141521 | |||||
SCORE 95 Witness test for fire alarm final tco @ salesforce tower-building office - 101 1st st 2nd floor. See permit #ew201709208111 Date: November 1, 2017 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201710258857 | |||||
SCORE 95 Network cabling including (32) cales @ 101 first street 2nd floor Date: October 11, 2017 Contractor: Paganini Communications Inc Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201710118554 | |||||
SCORE 100 47 48 and 49th floor - structural stair for architectural permits ref pa 2017-0517-6809 2017-0517-6807 and 2017-0517-6810 Permit type: Building permit | Expiration date: October 20, 2018 | Current use: Office | Permit id: #201707141919 | |||||
SCORE 100 Mep for 201708185212 maher not req Permit type: Building permit | Expiration date: October 3, 2018 | Current use: Office | Permit id: #201710030176 | |||||
SCORE 82 Fire sprinkler permits. Relocate 17 add 3 delete 5 pendents relocate 1 and delete 8 uprights on the 2nd floor. T. I pa# 201708185212. Na for maker. Permit type: Building permit | Expiration date: April 11, 2018 | Current use: Office | Permit id: #201710100741 | |||||
Revision to pa# 2013 03 13 2080-s15 landscaping. Revision to ground level zone 1 & 2. 5th level zone 3. Changing location of trels. Add public art. Add detectable surface. Add tree uplight. Maher: n a Date: October 19, 2017 Permit type: Building permit | Current use: Office | Permit id: #201710191690 | |||||
SCORE 100 This pays for inspections related to original permit # pw20171018681 filed 10 18 2017. Dow: work category: 4pb; fire sprinkler ti : relocate 17 and add 3 pendent heads. Add one upright head Date: October 18, 2017 Contractor: Rlh Fire Protection Cma Fire Protect Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20171018682 | |||||
SCORE 95 Office t i including lighting power and fire alarm devices @ salesforce tower building office - 101 1st street 2nd floor Date: September 20, 2017 Contractor: Paganini Electric Corp(see Signatories) Permit type: Electrical permit | Permit status: Issued | Permit id: Ew201709208111 | |||||
Exterior signage for saleforce Date: September 20, 2017 Permit type: Building permit | Permit id: #201709209076 | |||||
Electric wall sign for salesforce tower Date: September 20, 2017 Permit type: Building permit | Permit id: #201709209077 | |||||
2 monument signs for salesforce tower sign type tn. 01 tn. 02 Date: September 20, 2017 Permit type: Building permit | Current use: Office | Permit id: #201709209080 | |||||
SCORE 100 Work category: 5p; rough and trim install one (1) kitchen sink with chronomite and dishwasher provided by others. Date: September 20, 2017 Contractor: Allied Heating And Air Conditining Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170920092 |