Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Temporary certificate of occupancy Date: May 10, 2017 Contractor: Freedom Enterprises Inc Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 782349 | |||||
SCORE 100 Day t. C. O. Date: August 26, 2016 Contractor: Freedom Enterprises Inc Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: August 26, 2016 | Permit id: 717806 | |||||
Level ii alterations with partial change of occupancy to create offices in current shell space on the second, third and fourth floors of building 3 as per approved plans and bbs variance 26877. Building 3 to be fully sprinklered per nfpa 13 and automatic smoke detection system complying with nfpa 72 must be installed per provisos of bbs variance 26877. Separate permits required for mep & fire suppression work Date: May 23, 2016 Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 24, 2017 | Permit id: 656914 | |||||
Restaurant upfit within existing shell building. New commercial kitchen with hoods, walk-in freezer cooler unit, bar, toilet rooms, dining areas. New exterior awnings. New roof top mechanical units. Date: July 8, 2015 Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 1, 2016 | Permit id: 586986 | |||||
SCORE 64 For interior alteration for creation of a restaurant space as per plans. Separate permits required for all mechanical, electrical, plumbing and fire suppression work. Date: February 27, 2017 Contractor: Rjs Construction Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Active | Completion date: August 31, 2017 | Permit id: 753251 | |||||
Six accessory flat wall signs in addition to the previously approved zoning use permit a p 455907 & 518918 1) sign #25 illuminated channel letters 5-0" x 19-0" 2) sign # 28 11-0" x 25-0" with an illuminated 46 x 25-0", illuminates 2-6" x 35-0" &n 3-0" x 25-0" digital message board 3) sign #20, 30, 31 & 32 8-6" x 100" see a p 455907 for plan Date: March 17, 2015 Client: Core Equity Ii Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 20, 2015 | Permit id: 596416 | |||||
SCORE 82 01 06 2016 tent installed at the fillmore 98 richmond st. (cook tent) Date: January 5, 2016 Contractor: L And A Tent Rentals Client: Core Equity Ii Lp | Permit type: Operations permit | Permit status: Completed | Permit id: 23970 | |||||
SCORE 96 Replace 5 windows within existing openings of vacant warehouse. No changes to size or location of existing openings. Date: August 11, 2011 Contractor: 117 Chestnut Street Lp Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Expired | Completion date: October 11, 2012 | Permit id: 357674 | |||||
Replacing loose bricks, capping and repointing on existing linear feet of parapet wall. No change in height or area. Date: March 29, 2012 Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: October 3, 2012 | Permit id: 395450 | |||||
SCORE 100 For the installation of a fire suppression system as per nfpa 13 in building #3 as per approved plans. New system to tie into existing fire suppression system. Date: June 17, 2016 Contractor: Angkor Contracting Services Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 694911 | |||||
SCORE 100 For the installation of one (1) internally illuminated, static flatwall sign [sign #25, above 2second floor roof line] and one (1) internally illuminated, two-faced marquee sign [sign #26] per submitted sealed plan. Separate electric permit required. Date: May 12, 2016 Contractor: Nova Industries Llc Client: Core Equity Ii Lp | Permit type: Sign permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 690762 | |||||
SCORE 100 Installation new nfpa 13 automatic sprinkler system throughout building 1 only - new fire pump and 6" service line, fdc. Part of alts permit ap513101. Additional future sprinkler permits required for buildings #2 & #3 . Date: October 9, 2014 Contractor: Angkor Contracting Services Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 561641 | |||||
SCORE 100 12 4 09-erection of (1)-20x assembly use tent Date: January 12, 2010 Contractor: Anthony Rental And Sales Inc Client: Core Equity Ii Lp | Permit type: Operations permit | Permit status: Completed | Permit id: 20087 | |||||
SCORE 100 Install (18)eighteen receptacles and (16) sixteen light fixtures Date: October 28, 2016 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 24, 2017 | Permit id: 732828 | |||||
SCORE 100 Install (1) one ansul r-102 10. 5 gallon wet chemical commercial kitchen fire suppression system. Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 6, 2016 Contractor: Atlantic Fire Equipment Co Inc Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 690074 | |||||
SCORE 93 For the partial demolition of an existing attached building. Size and location as shown on approved plans. Maintain existing use as assembly and entertainment. Date: May 19, 2017 Contractor: Ricco Construction Client: Core Equity Ii Lp | Permit type: Zoning permit | Permit status: Completed | Completion date: September 1, 2017 | Permit id: 769029 | |||||
SCORE 100 Install one ansul r-102 6 gallon wet chemical commercial kitchen fire suppression system. Date: December 2, 2016 Contractor: Atlantic Fire Equipment Co Inc Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 740713 | |||||
SCORE 100 Electrical power,lighting,tele data and av wiring per 2008 nec (east district)install fire alarm per nfpa 72 Date: September 23, 2016 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: January 4, 2017 | Permit id: 690671 | |||||
Complete removal of the existing, rooftop billboard sign and structure in accordance with the enclosed drawing no. D75030-t307-1 dated 17nov15, prepared by tantala associates, llc. No change to existing height, area, bulk, use, parking, or accessory signage. Existing non-accessory sign (billboard sign n. 010703) is owned by clear channel outdoor advertising and was installed with zoning permit no. 199365 issued 16oct72, and may be used as removal credit for future non-accesory sign applications in accordance with 14-905(12)(b). Date: February 9, 2017 Client: Core Equity Ii Lp | Permit type: Zoning permit | Permit status: Expired | Completion date: February 9, 2017 | Permit id: 653405 | |||||
SCORE 100 Installation of 7 network cameras to one network video recorder cat5e communications cabling one security control panel, one user control panel class 2 wiring,wiring will be exposed and fished in concealed spaces as per 2008 nec (east district) Date: June 9, 2017 Contractor: Vector Security Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 13, 2017 | Permit id: 790624 | |||||
SCORE 100 Electrical, telecommunicatons cat5e plenum 2 longest run,audio visual, lighting and lighting controls as per nec 2008. Transformer secondary ocp to comply with articles 240. 21(c)(2) & 450. 3 of the 2008 nec. Date: June 25, 2015 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 594203 | |||||
For the installation of one (1) rooftop unit with registers diffusers and associated ductwork on the fourth floor and one (1) heat pump with associated ductwork registers diffuers on the first floor, as per approved plans. Date: September 14, 2016 Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 719914 | |||||
SCORE 99 For the installation of registers, diffusers, ductwork and fans. No rooftop units or structural work included on this permit. Separate permit required for electrical, plumbing, fire suppression. Date: July 16, 2015 Contractor: The Genesio Co Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 601893 | |||||
SCORE 100 Visual inspection of 85kw generator for temporary power for 1-day event 4 15 15 as per nec 2008 Date: April 14, 2015 Contractor: Caniglia And Co Inc Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: November 6, 2015 | Permit id: 602487 | |||||
SCORE 100 Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Install wet chemical commercial kitchen fire suppression systems for three (3) commercial cooking hood systems. Post this permit Date: August 26, 2015 Contractor: Atlantic Fire Equipment Co Inc Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 634626 | |||||
SCORE 100 Using existing 600amp service and wiring entire building w recepts,switches,outlets,fixtures,branch and circuit wiring as per 2008 nec (cc district) install complete fire alarm system with devices and wiring such as strobes,horns and pull stations as per nfpa72 Date: October 19, 2016 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: July 21, 2017 | Permit id: 719179 | |||||
SCORE 100 Interior plumbing alterations to create a bowling alley with a restaurant bar - the installation will comply with tables p-811. 2 & p-904. 7 of the philadelphia plumbing code 2004 and table 608. 1 of the 2009 international plumbing code for water supply backflow protection at fixtures equipment Date: August 24, 2016 Contractor: G M Mechanical Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 22, 2016 | Permit id: 632267 | |||||
SCORE 100 Installation of fire suppression system throughout building #2 (partial first and entire second floor) in accordance with nfpa 13 standards. System to be provided with a fire pump and backflow prevention assembly. System serviced via a 6" fire service main line. Date: September 8, 2015 Contractor: Angkor Contracting Services Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: September 12, 2016 | Permit id: 634104 | |||||
SCORE 99 Installation of hvac system- roof top units, heat pumps, unit heaters, ac units,duct work,supply exhaust fans, additional registers diffusers, and accessory mechanicals. Engineer designer responsible for verifying roof top unit support framing and additional loading conditions, see additional alterations and shell permits ap586986 600947 see also ap601893 for interior ductwork only(no rtu) must comply with issued violations 482353 497394. Date: August 19, 2015 Contractor: The Genesio Co Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 629642 | |||||
SCORE 100 Day tco Date: November 3, 2015 Contractor: Freedom Enterprises Inc Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 649711 | |||||
SCORE 89 Install-14 rtus 51 difuseres 47 registers and grills 2 commercial exhaust fan 2 regular exhaust fans Date: March 17, 2016 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 652109 | |||||
SCORE 89 For the installation of two (2) roof top units, four (4) exhaust fans and associated ductwork in an existing building, as per approved plans. Date: February 14, 2017 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 653301 | |||||
SCORE 100 Alterations: interior plumbing;partial change of occupancy; offices; second, third & fourth floors of building 3 - the installation will compy with the philadephia plubming code 2004 Date: July 18, 2017 Contractor: G M Mechanical Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 24, 2017 | Permit id: 790773 | |||||
SCORE 100 Install 2 24"x120" d s l. E. D illuminated projecting signs as per plans. Date: November 6, 2017 Contractor: Aztec Signs And Graphics Inc Client: Core Equity Ii Lp | Permit type: Sign permit | Permit status: Active | Completion date: November 27, 2017 | Permit id: 820474 | |||||
SCORE 89 Installation of new hvac equipment per attached drawings. Date: October 19, 2016 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 721875 | |||||
SCORE 100 Install 200amp temporary service,temporary lighting and temporary gfci receptacles per 2008 nec (commercial) Date: December 11, 2014 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Expired | Completion date: April 25, 2015 | Permit id: 579221 | |||||
SCORE 100 Tco Date: February 3, 2016 Contractor: Freedom Enterprises Inc Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: February 3, 2016 | Permit id: 667603 | |||||
SCORE 89 Installation of two (2) commercial hoods. See a p 652109 for plan. Separate permit is required for cooking extinguishing system Date: March 17, 2016 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 676572 | |||||
SCORE 100 For the extension of an existing nfpa 13 system in to proposed restaurant serviced by an existing fire service line, existing backflow preventer assembly and existing fire pump. Please reference ap#561641 for approved assemblies. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with nfpa 13. Separate permits required for electrical and plumbing work. Date: August 12, 2015 Contractor: Angkor Contracting Services Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 627136 | |||||
SCORE 100 Level iii alterations to three (3) existing fire separated buildings (buildings 1,2 & 3) to include a complete change of occupancy; building 1 fitout for assembly and entertainment use with accessory offices and loading area as per approved plans. Separate permits required for fitouts of buildings 2 & 3 prior to occupancy. Buildings to be fully sprinklered in accordance with nfpa 13. Asbestos removal required. Separate permits required for mep, fire suppression and sign work Date: February 26, 2014 Contractor: David H Davidson Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: November 6, 2017 | Permit id: 513101 | |||||
SCORE 100 Roughin & set fixtures, wc, lav, fs, hs, kit sink, urinal, df (mix use) Date: January 22, 2015 Contractor: Jr Mcgee Plumbing Llc Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 562043 | |||||
Amend permit #513101 update the occupancy of the concert venue and to revise floor layouts and to remove required vestibules, stage ventilation and second means of egress from first floor bar area as per approved plans and bbs variance no. 25767. Work to also include creation of new building 5 with type vb construction. Per bbs variance, fire watch must be provided during concert events, no stage effects other than lighting and sound, a 36" x 36" manual hatch must be provided in auditorium roof and pyrotechnical displays shall be prohibited. Separate permits required for all mep, fire suppression and sign work Date: September 15, 2015 Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: December 16, 2015 | Permit id: 601017 | |||||
Level ii alterations to create a bowling alley with restaurant bar and dining in vacant shell space in partial first floor and entire second floor of existing building 2 as per approved plans. Building to be fully sprinklered. See a p 513101 for shell construction. No exterior sign work on this permit, separate permit required. Separate permits required for mep & fire suppression work Date: June 16, 2015 Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: September 20, 2016 | Permit id: 600947 | |||||
Day t. C. O. Concert venue accessory spaces (buildings #1 & #5 ) Date: September 15, 2015 Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 638895 | |||||
One accessory roof top signs in addition to the previously approved zoning use permit (a p 455907 & 518918 1) sign # 42 erection of a 9 ft. Tall x 26-8" wide flat wall sign extending above the existing roof parapet and braced to the existing roof, consisting of one row of 3-10" tall x 26-8" wide illuminated channel letters and a 2-10" tall x 24-6" wide digital message board. Date: October 1, 2015 Client: Core Equity Ii Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: October 1, 2015 | Permit id: 641745 | |||||
SCORE 93 Partial demolition of existing building as per approved plans. Demolition to be done by hand. Date: May 19, 2017 Contractor: Ricco Construction Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: June 17, 2017 | Permit id: 769034 | |||||
SCORE 100 Install drainage & water lines & install all plumbing fixtures the installation will comply with the philadelphia plumbing code 2004 Date: August 14, 2015 Contractor: G M Mechanical Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 623894 | |||||
Temporary certificate of occupancy for front portion of distillery Date: January 4, 2017 Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 747352 | |||||
SCORE 89 Installation of one (1) ul 7 listed commercial kitchen exhaust hood, rooftop mounted exhaust & makeup air fans & all associated ductwork to serve kitchen space of previously approved restaurant tenant space. Separate permit reqd for fire extinguishing system install. See mechanical permit# 721875 for approved construction documents. Date: October 19, 2016 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 721878 | |||||
SCORE 100 Ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: September 9, 2015 Contractor: Atlantic Fire Equipment Co Inc Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 637414 | |||||
SCORE 100 For the installation of one (1) internally illuminated, static flatwall sign [sign #25, above 2nd flr roof line] and one (1) internally illuminated, two-faced marquee sign [sign #26]. Size and location as per site plan approved under ap#455907 and sign shop drawings. (see cal no. 20157 for review of signs by the z. B. A.) for signs accessory to a bowling alley use as previously approved (under cal no. 20157) with all other existing uses as previously approved. Date: May 10, 2016 Contractor: Nova Industries Llc Client: Core Equity Ii Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 10, 2016 | Permit id: 678456 | |||||
SCORE 99 For the installation of a new hvac system and ductwork to include unit heater air curtains as shown on the approved plans. A seperate permit for the installation of commercial kitchen hood(s) is required. Separate electrical permits for the air curtains and heat pump units are required. Post this permit Date: August 20, 2015 Contractor: The Genesio Co Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 3, 2016 | Permit id: 629647 | |||||
SCORE 99 For the installation of three (3) commercial kitchen hoods in an existing restaurant as shown in approved plans. All hoods are ul 7 listed and are to be installed in accordance with manufacturers specifications. Date: August 20, 2015 Contractor: The Genesio Co Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 629673 | |||||
SCORE 100 Electrical power, fire alarm, and lighting as per plans Date: August 25, 2015 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: September 19, 2016 | Permit id: 623504 | |||||
Permit for the removal of (3) three, # 2 heating oil, underground storage tanks, Date: September 10, 2012 Client: Core Equity Ii Lp | Permit type: Demolition permit | Permit status: Completed | Completion date: October 26, 2012 | Permit id: 426362 | |||||
Erection and infill addition at 2nd floor1st floor use as concert venue, distillery manufacturing, distillery tasting room, bowling restaurant, restaurant, retail and common bldg uses. 2nd floor use as concert venue, distillery office, bowling alley lanes, admin office and common bldg uses. 3rd and 4th floor uses as distillery offices. Erection of multiple signs, out door bicycle parking spaces, 2 fully enclosed loading spaces, information kiosk, out door planters. Date: March 9, 2015 Client: Core Equity Ii Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 9, 2015 | Permit id: 455907 | |||||
For level 2 alteration to existing tenant space as per approved plans. Separate permits required for mechanical, electrical, plumbing and fire suppression work. Date: February 5, 2016 Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 653392 | |||||
SCORE 100 Installation of fire suppression system throughout distillary in building #3 in accordance with nfpa 13 standard. System to be serviced by existing system in building #1, see a p 561641 for main feed and backflow prevention assembly. All work shall comply with the approved plans. All work shall be performed by a fire suppression contractor licensed by the city of philadelphia. Date: February 12, 2016 Contractor: Angkor Contracting Services Client: Core Equity Ii Lp | Permit type: Suppression permit | Permit status: Completed | Completion date: January 5, 2017 | Permit id: 666071 | |||||
SCORE 89 Alteration to roof for structural support of rtus. See a p 652109 for plan Date: March 17, 2016 Contractor: Freedom Energy Partners Client: Core Equity Ii Lp | Permit type: Alteration permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 676578 | |||||
SCORE 100 Interior plumbing alterations to create a distillery with a restaurant bar - the installation will comply with tables p-506, p-811. 2 & p-904. 7 of the philadelphia plumbing code 2004 (ppc) - water supplies to equipment will be protected against backflow per section p-806 of the ppc 2004 by an approved method listed in table 608. 1 of the 2009 international plumbing code - branch venting must comply with section p-1105 of the ppc 2004 Date: January 4, 2017 Contractor: G M Mechanical Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 28, 2017 | Permit id: 657276 | |||||
SCORE 100 Intall 1 roof sign and framing support, signs #28, as per engineers plans. Date: October 13, 2015 Contractor: Ez Signs Llc Client: Core Equity Ii Lp | Permit type: Sign permit | Permit status: Completed | Completion date: June 9, 2016 | Permit id: 627327 | |||||
SCORE 100 Install fire alarm system as per nfpa 72 east district Date: August 26, 2015 Contractor: Fidelity Burglar And Fire Alarm Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: January 9, 2016 | Permit id: 628202 | |||||
SCORE 99 For the installation of one (1) commercial kitchen hood (type 1, 12-0" long) in the kitchen of a concert venue, as shown in approved plans. Separate permit required for fire suppression permit. Date: September 8, 2015 Contractor: The Genesio Co Client: Core Equity Ii Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 16, 2015 | Permit id: 629640 | |||||
SCORE 100 6" lat 6x4 curb trap 6" main replace Date: March 6, 2017 Contractor: Jack Edmondson Inc Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 764411 | |||||
SCORE 59 Alteration: interior underslab plumbing for the fit-out of a 1st floor bar & restaurant in building #4 (urban eel). Rough plumbing only underground only. The installation shall comply with the philadelphia plumbing code, 2004. Additional permits are required for above slab interior plumbing and the 6" sewer lateral to the street main. Fuel gas piping & equipment is not part of this permit and a mechanical permit is required. Date: June 5, 2017 Contractor: Athena Contracting Inc Client: Core Equity Ii Lp | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 17, 2017 | Permit id: 765563 | |||||
SCORE 56 Amend permit number 600947 for change of elevator system to include elevator machine room as per approved plans. Date: November 3, 2015 Contractor: Suominen Aniko Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 643784 | |||||
SCORE 100 Installation of one (1) accessory roof sign with internal illumination and digital display as per approved plans. Separate permit required for electrical work Date: December 21, 2015 Contractor: Ez Signs Llc Client: Core Equity Ii Lp | Permit type: Sign permit | Permit status: Completed | Completion date: March 11, 2016 | Permit id: 644670 | |||||
Day t. C. O. Date: October 14, 2015 Client: Core Equity Ii Lp | Permit type: Administrative permit | Permit status: Completed | Completion date: October 15, 2015 | Permit id: 645134 | |||||
For the erection of two roof top signs (signs and 41) accessory to an assembly occupancy. All work to be done per approved plans. If field condition vary contact structural engineer prior to the start of any work. Separate permits required for all other work. Date: November 12, 2015 Client: Core Equity Ii Lp | Permit type: Sign permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 645378 | |||||
To amend permit # 641745 to correct the permit wording for the erection of one accessory roof sign (12-3"x 26 - sign # 42) as identified on the plan associated with a p # 455907 with all previously approved uses. Date: October 27, 2015 Client: Core Equity Ii Lp | Permit type: Zoning admin review | Permit status: Completed | Completion date: October 27, 2015 | Permit id: 647959 | |||||
SCORE 100 600amp 3phase service, lighting, tele data wiring & av wiring as per nec 2008 & fire alarm as per nfpa 72 east district Date: December 18, 2015 Contractor: Liberty Integrated Solutions Client: Core Equity Ii Lp | Permit type: Electrical permit | Permit status: Completed | Completion date: August 25, 2016 | Permit id: 649065 | |||||
Three accessory roof top signs in addition to the previously approved zoning use permit a p 455907 & 518918 1) sign # 33 4-0" x 36-0" with five lines each 1-6" high 2) sign # 14-0" x 48-0" digital 3) sign #41 14-0" x 48-0" digital Date: March 17, 2015 Client: Core Equity Ii Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 17, 2015 | Permit id: 596034 |