Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Right of way Date: April 21, 2010 Contractor: Neil Phillippi Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Complete | Permit id: Row10-01886 | |||||
SCORE 96 Right of way Date: April 21, 2010 Contractor: Jennifer Phillippi Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Complete | Permit id: Row10-01886 | |||||
SCORE 96 Right of way Date: April 21, 2010 Contractor: Jennifer Phillippi Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Complete | Permit id: Row10-01886 | |||||
Traffic lane restrictions on s capitol ave at georgia st to use crane for installation of truss and Date: March 27, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-01465 | |||||
Traffic lane restrictions on s capitol ave at georgia st to use crane for removal of truss and video Date: March 30, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-01480 | |||||
Traffic lane restrictions on s capitol ave at georgia st to install disco ball under csx railroad on Date: March 30, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-01500 | |||||
Marching band event at los and icc. We are asking to close the west lane of capitol (from maryland o Date: November 5, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-01130 | |||||
Metes and bounds legal / comm renovation to include the tear-off and re-roof of a portion of existin Date: June 2, 2015 Value: $850,000 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Review | Current use: Convention center | Permit id: Str15-02581 | |||||
Indiana convention center / concession stand interior remodel 35 sf per plans / cdr: 367187 / con Date: August 30, 2013 Value: $475,000 Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Structural | Permit status: Review | Current use: Convention center | Permit id: Str13-03912 | |||||
Use of southern most lane on w maryland st in front of the indiana convention center to run shuttle Date: June 28, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-03900 | |||||
SCORE 96 Adding section to substation for 12 amp feed to distribution panel Date: September 12, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03043 | |||||
Use of 4 traffic lanes north side curb lane and 8 parking meters southside sidewalk taxi and loading Date: December 18, 2012 Permit type: Right of way | Permit status: Complete | Permit id: Row12-07235 | |||||
2008 indiana fire code section 3503. 1. 1 - indiana conevention center will be used for display of veh Date: October 27, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: No variance required | Permit id: Svr10-00194 | |||||
SCORE 96 Traffic light sensor installationemergency contact: tom bothwell 281-6615 Date: April 6, 2010 Contractor: Joseph Cathcart Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01550 | |||||
2008 indiana building code section 907. 2. 1. 1 the activation of the fire alarm system does not auto Date: November 9, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00323 | |||||
I-465 w side to conv str 84 l 8. 5 w 13. 5 h 160000lbsemergency contact: 909-748-771 Date: October 2, 2012 Client: Capital Improvement Board Of Managers Of Marion County Indiana | Permit type: Right of way | Permit status: Issued | Permit id: Row12-05754 | |||||
SCORE 86 Concrete curb sidewalk & ramp replacement on capitol st; brick removal for dpw project; emergency co Date: May 23, 2011 Contractor: Steven Milbourne Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02939 | |||||
SCORE 93 Relocating first hydrant south of georgia street on the westside of capitol avenue due to convention Date: August 4, 2010 Contractor: Abby Cudworth Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-04516 | |||||
SCORE 96 Actual address is 1 s missouri st - service retirement 1 cut in asphalt street Date: November 3, 2010 Contractor: Vicky Burton Permit type: Right of way | Permit status: Complete | Permit id: Row10-06508 | |||||
20 gar 12-4-9(a) - fire hoses will be removed Date: October 27, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr10-00193 | |||||
85th national ffa convention with 550 attendees Date: May 30, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-03134 | |||||
SCORE 96 Provide temporary service for super bowl event tent Date: December 27, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: November 17, 2012 | Permit id: Ele11-04524 | |||||
SCORE 99 Removing decorations from conv center sidewalk and parking lane on maryland west of capitol s sideem Date: December 19, 2012 Contractor: Daniel Miller Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Complete | Permit id: Row12-07290 | |||||
83rd national ffa convention with 550 attendees Date: October 8, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-06014 | |||||
SCORE 99 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to hang holiday deco Date: November 14, 2012 Contractor: Daniel Miller Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-06646 | |||||
Super bowl xlvihost committee submittalconvention centertemporary tents - south parking lotsinstall Date: December 12, 2011 Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str11-04897 | |||||
Row curb lane use for bus parking; southern lane of maryland between missouri and capitol; from 4:00 Date: April 26, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-02064 | |||||
Row curb lane use on south street and traffic lane use on capitol ave for re-route of mecca fiber op Date: June 3, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-03013 | |||||
2008 indiana fire code section 2404. 15. 1 2404. 15. 2 the heating system is not listed for use with t Date: December 29, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00380 | |||||
2008 indiana fire code section 2403. 12. 2 the tent will only 1 of the 2 required exits Date: December 29, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00379 | |||||
The walk is an annual event hosted through gencon gaming convention. Attendees dress up as zombies Date: May 11, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-02440 | |||||
SCORE 89 Test Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Void | Current use: Apt office | Permit id: Str11-03831 | |||||
Commission added condition: 2008 indiana building code section 410. 4. 1 3103. 1. 1 a platform will be Date: December 29, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00371 | |||||
Meters across the street from the convention center Date: May 19, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-02816 | |||||
SCORE 86 Rear of address cut and trench from middle of west st e to the curb line of missouri then microtrenc Date: November 15, 2011 Contractor: Ross Manire Permit type: Right of way | Permit status: Issued | Permit id: Row11-06607 | |||||
SCORE 86 Metes and bounds / new communication equipment for existing cell tower to include 3 new antennas and Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Extension - 180 | Expiration date: May 24, 2014 | Current use: Comm tower | Permit id: Str12-06361 | |||||
2008 indiana building code section 1008. 1. 8. 3-a key operated deadbolt will be provided on a means of Date: July 2, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr10-00101 | |||||
SCORE 56 For dpw cultural trail; 1 lane n of washington; 1 traffic & 1 curb lane between washington & marylan Date: March 31, 2010 Contractor: Dennis Lods Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01501 | |||||
Blocking traffic lanes (crossing all lanes) on capitol ave to remove mesh bridge wrap on skywalk f Date: September 20, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-05580 | |||||
SCORE 86 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ georgia s Date: August 12, 2010 Contractor: Kathleen Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-04684 | |||||
Blocking traffic lanes (crossing all lanes) on capitol ave to install mesh bridge wrap on skywalk Date: September 20, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-05579 | |||||
SCORE 96 For dpw cultural trail; 1 lane n of washington; 1 traffic & 1 curb lane between washington & marylan Date: March 31, 2010 Contractor: Joseph Cathcart Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01501 | |||||
Use of south lane on maryland st from capitol ave to west st for loading shuttle busses for event at Date: January 9, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-00075 | |||||
17305 - annual meeting and exhibits for the national rifle association Date: January 21, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-00287 | |||||
Use of curb lane on maryland st closest to convention center for private event to accommodate bus & Date: February 11, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-00614 | |||||
17464 - impd applicant testing Date: February 21, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-00769 | |||||
Placement of wayfinding flags on the sidewalk in multiple areas for the fdic convention on 3/31/14 t Date: March 11, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01152 | |||||
Use of traffic ln on capitol ave to install graphic to indiana convention center on capitol ave for Date: March 11, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01154 | |||||
Placement of 4x4 towers with lighting on the sidewalk in multiple areas for the fdic convention on 3 Date: March 12, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01173 | |||||
SCORE 96 Gratis permit dpw electr conduitemergency contact thomas fansler 714-3235 per contractor e-mail req Date: March 21, 2014 Contractor: T Fansler Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01382 | |||||
SCORE 88 Gratis permit dpw electr conduitemergency contact thomas fansler 714-3235 per contractor e-mail req Date: March 21, 2014 Contractor: Thomas Fansler Iii Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01382 | |||||
Use of parking lane & 2 meters on w maryland st to park sprinter van during convention center event Date: March 21, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-01391 | |||||
Install fdic wrap on westin skywalk on capitol ave on 3/31/14 and remove wrap on 4/18/14; emergency Date: March 28, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01543 | |||||
Install nra wrap on westin skywalk on capitol ave using 1 traffic ln at a time on 4/21/14 and remove Date: April 15, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-01905 | |||||
17848 - trade show for the auto racing industry Date: April 22, 2014 Permit type: Right of way | Permit status: Issued | Permit id: Row14-02025 | |||||
Installation of sidewalk splats on various sidewalks downtown in clean zone area for nra convention; Date: April 23, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-02090 | |||||
Recaulk the north facade of conv centpartial closure of sidewalk on maryland st frm 4/28 to 5/12 frm Date: April 24, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-02129 | |||||
Install do it best wrap on skywalk between denison parking garage and convention center on capitol a Date: May 5, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-02379 | |||||
Use of turn lane and 2 additioanl. Traffic lanes for crane placement on w. Maryland st to hoist roof Date: July 28, 2014 Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Complete | Permit id: Row14-04082 | |||||
Use of sidewalk along maryland st toward west st from bus shelter on south side of street for gen-co Date: July 30, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-04159 | |||||
Use of curb lane on capitol ave in front of convention center for shuttel busses for the exact targe Date: September 5, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-04939 | |||||
18785 - national annual convention Date: October 2, 2014 Permit type: Right of way | Permit status: Void | Permit id: Row14-05522 | |||||
Use of traffic lane & cultural trail on capitol ave in front of convention center from maryland st t Date: October 2, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-05529 | |||||
Install skywalk graphic on skywalk between denison parking garage and convention center on capitol a Date: October 9, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-05677 | |||||
SCORE 89 Use of traffic ln on capitol ave from georgia st to south st for stormwater treatment unit cleaning Date: October 11, 2014 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-05721 | |||||
SCORE 89 Use of traffic ln on capitol ave from georgia st to south st for stormwater treatment unit cleaning Date: October 11, 2014 Contractor: Charles Mcauley Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row14-05721 | |||||
Right of way Date: October 13, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Open | Permit id: Row14-05750 | |||||
Use of traffic ln parking ln & sidewalk on maryland st on 11/15/14 to hang holiday decor on exterior Date: November 12, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-06274 | |||||
Use of traffic lane on west side of capitol ave south of maryland st in front of convention center Date: December 3, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-06645 | |||||
SCORE 97 Replace sidewalk on maryland in front of convention center from 12/15/14 thru 12/23/14; emergency co Date: December 10, 2014 Contractor: John Williamson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row14-06759 | |||||
Metes & bounds legal / cib / temporary skywall signs to install on may 13 2014 & remove on may 20 Date: February 14, 2014 Value: $500 Client: Cib | Permit type: Sign | Permit status: Issued | Expiration date: February 20, 2016 | Permit id: Sgn14-00102 | |||||
SCORE 88 Request for extended hours approved comm tear-off / re-roof / decking / convention center / Client: Capitol Improvement Board Of Marion County | Permit type: Structural | Permit status: Closed | Completion date: January 29, 2015 | Expiration date: January 24, 2015 | Current use: Other commercial | Permit id: Str14-03686 | |||||
SCORE 92 Request for extended hours approved comm tear-off / re-roof / decking / convention center / Client: Capitol Improvement Board Of Marion County | Permit type: Structural | Permit status: Closed | Completion date: January 29, 2015 | Expiration date: January 24, 2015 | Current use: Other commercial | Permit id: Str14-03686 | |||||
SCORE 100 Metes and bounds legal / new antennas and accosiates units for upgrade to an existing communication Client: Sprint | Permit type: Structural | Permit status: Issued | Expiration date: March 4, 2015 | Current use: Office | Permit id: Str14-04483 | |||||
SCORE 93 Metes and bounds legal / new antennas and accosiates units for upgrade to an existing communication Client: Sprint | Permit type: Structural | Permit status: Issued | Expiration date: March 4, 2015 | Current use: Office | Permit id: Str14-04483 | |||||
1998 indiana fire code section 8705. 3-a portion of the addition will not be provided with code compl Date: January 22, 2014 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: January 22, 2014 | Permit id: Svr00-00084 | |||||
1993 indiana building code section 3308(b)-a horizontal exit will have openings that are not protect Date: November 24, 2014 Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: State variance | Permit status: Closed | Completion date: November 24, 2014 | Permit id: Svr98-00034 | |||||
SCORE 96 Metes and bounds / replacement of 108 vav boxes and controls replacement of 6 ahu coils / cb Date: January 27, 2015 Contractor: Tim Gatewood Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Heating & cooling | Permit status: Extension - 180 | Expiration date: January 4, 2016 | Permit id: Htg15-00621 | |||||
Use of traffic ln parking ln & sidewalk on maryland st on 1/3/15 to hang holiday decor on exterior o Date: January 2, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-00004 | |||||
Oversize/overweightemergency contact: paul lecluse 800-544-4188 Date: March 13, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01160 | |||||
Oversize/overweightfrom canada coming into the city along i- from ohio exiting shadeland going sou Date: March 17, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01245 | |||||
Use of sidewalk & traffic lane for temporary installation of visit indy art sculpture on the plaza / Date: March 20, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01329 | |||||
Install skywalk graphic on skywalk between denison parking garage and convention center on maryland Date: March 31, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-01543 | |||||
Install fdic wrap on westin skywalk on capitol ave on 4/17/15 and remove wrap on 4/27/15; emergency Date: April 9, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01663 | |||||
Placement of wind dancers on the sidewalk in multiple areas for the fdic convention on 4/17/15 thru Date: April 9, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01678 | |||||
Placement of directional truss on the sidewalk in multiple areas for the fdic convention on 4/17/15 Date: April 9, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01680 | |||||
Placement of 35 sidewalk decals on varioua sidewalks in multiple areas around the indiana convention Date: April 9, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01681 | |||||
Install fdic letters on in front of icc on capitol ave sidewalk across from georgia st on 4/18/15 an Date: April 10, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01685 | |||||
Oversize/overweightemergency contact mary 800-228-7577 Date: April 16, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-01831 | |||||
SCORE 96 Inlet repair for united water kent haste 317-223-7332no work on 5/2 mini marthon and 5/9 per contr Date: April 21, 2015 Contractor: Janet Haste Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-01911 | |||||
Moving 66k lb load from 1 s capitol to washington st to i-465 exit 46emergency contact: jeff barre Date: April 24, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Cancelled | Permit id: Row15-02017 | |||||
Use of sidewalk only on south capitol ave to install window graphic for ibe on convention center win Date: June 30, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-03379 | |||||
Use of sidewalk along maryland st toward west st from bus shelter on south side of street for gen-co Date: July 24, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row15-03825 | |||||
Indiana blood center blocking parknig lane for blood mobile on w maryland from 8/9-8/11. Emergency co Date: August 7, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row15-04121 | |||||
Use of 4 traffic lanes north side curb lane and 8 parking meters southside sidewalk taxi and loading Date: August 24, 2015 Permit type: Right of way | Permit status: Complete | Permit id: Row15-04393 | |||||
Oversize/overweightemergency contact: mike todd 216-406-5947 Date: September 23, 2015 Client: Budig Realty Llc Attn Anthony Lestingi | Permit type: Right of way | Permit status: Issued | Permit id: Row15-04862 | |||||
Use of use of parking ln & sidewalk on new york st from 11/17/13 thru 11/20/13; use of parking ln si Date: November 10, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Ready to issue | Permit id: Row15-05732 | |||||
18997 - work truck show convention. Positioning vehicles around the city parked at meters to be on Date: January 9, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-00042 | |||||
19016 - the final four dribble refreshed by coca-cola give 32 kids the chance to dribble their way Date: January 16, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-00055 | |||||
National ffa convention with 550 attendees Date: March 17, 2015 Permit type: Right of way | Permit status: Review | Permit id: Sev15-00342 | |||||
National ffa convention with 550 attendees Date: March 17, 2015 Permit type: Right of way | Permit status: Open | Permit id: Sev15-00343 | |||||
Trade show for the auto racing industry Date: March 24, 2015 Permit type: Right of way | Permit status: Review | Permit id: Sev15-00366 | |||||
A 3 day national faith-based conference for high school teens. Estimated attendance is 21000-23000. Date: September 1, 2015 Permit type: Right of way | Permit status: Issued | Permit id: Sev15-01011 | |||||
Metes & bounds legal / 3 temporary banner signs located on skywalk / to be applied on 5/12/15 and re Date: May 11, 2015 Value: $667 Client: Capital Improvement Board | Permit type: Sign | Permit status: Issued | Expiration date: May 11, 2017 | Permit id: Sgn15-00327 | |||||
SCORE 82 Metes and bounds legal / att lte wcs site: in0461 project:129028 / remove 6 cables replace 6 a Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Issued | Expiration date: August 29, 2015 | Current use: Comm tower | Permit id: Str15-00696 | |||||
SCORE 89 Metes and bounds legal / att lte wcs site: in0461 project:129028 / remove 6 cables replace 6 a Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Issued | Expiration date: August 29, 2015 | Current use: Comm tower | Permit id: Str15-00696 | |||||
Final four videoboard at the entrance to the convention center / installation date: 3/29/2015 / remo Date: March 25, 2015 Permit type: Structural | Permit status: Closed | Completion date: March 31, 2015 | Expiration date: September 27, 2015 | Permit id: Str15-01075 | |||||
Cbssn stageline sl1 stage / installation date: 3/31/2015 / removal date: 4/7/2015 / emergency cont Date: March 30, 2015 Permit type: Structural | Permit status: Issued | Expiration date: September 27, 2015 | Permit id: Str15-01169 | |||||
2012 indiana fire code section 313. 1 314. 1-15- riding lawnmowers and 10-15 push mowers powered by Date: January 14, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: February 5, 2015 | Permit id: Svr15-00012 | |||||
1993 indiana building code section 1806-new exhibition halls will have unprotect roof structure. Date: February 24, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: February 24, 2015 | Permit id: Svr98-00147 | |||||
1993 indiana building code section 3308(a)-exhibit hall e when in separate use will have horizontal Date: February 24, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: February 24, 2015 | Permit id: Svr98-00148 | |||||
1998 indiana building code table 17-a-the new truck dock expansion will have the structural frame of Date: February 25, 2015 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: February 25, 2015 | Permit id: Svr98-00149 | |||||
SCORE 96 Total evening road closure of s capitol ave from maryland st to georgia st from 9/7/ thru 9/10/10; Date: August 31, 2010 Contractor: T Fansler Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05112 | |||||
SCORE 98 Installing manhole for at&t installing mh on w side of capitolacross from georgia at edge of safet Date: August 26, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05016 | |||||
Row curb lane use for bus parking; southern lane of maryland between west & missouri sts; from 5/13- Date: April 27, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-02110 | |||||
SCORE 100 Install dedicated phone equipment room cooling equipment including all necessary ductwork. Date: October 27, 2011 Contractor: Jeff Martin Client: Indiana Convention Center | Permit type: Heating & cooling | Permit status: Received | Permit id: Htg11-08130 | |||||
Use of parking lane & 2 meters to park sprinter van during convention center event from 12/3/12 thru Date: November 15, 2012 Permit type: Right of way | Permit status: Issued | Permit id: Row12-06672 | |||||
Blocking traffic lanes (crossing all lanes) on capitol ave with rolling crane to install 75 x 67 Date: May 9, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02730 | |||||
Row curb lane use on capitol between maryland & south sts for vehicle demonstrations at indiana conv Date: January 2, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-00011 | |||||
SCORE 99 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to remove holiday de Date: December 28, 2011 Contractor: Daniel Miller Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-07350 | |||||
Use of curb lane on capitol ave from maryland st to south st from 1/23-1/27 to install building grap Date: January 18, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-00303 | |||||
SCORE 86 Installing manhole for at&t installing mh on w side of capitolacross from georgia at edge of safet Date: August 26, 2010 Contractor: Kathleen Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05016 | |||||
SCORE 89 Testing pack 12 - plans uploaded Date: March 23, 2012 Contractor: Nicholas Runnebohm Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Sewer connection | Permit status: Cancelled | Permit id: Swr12-00790 | |||||
Convention center to i-465 west side 84 long 8. 5 wide 13. 5 high 1600 lbsemergency contact: 909-74 Date: October 10, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row12-05910 | |||||
Blood drive Date: July 22, 2010 Permit type: Right of way | Permit status: Issued | Permit id: Row10-04159 | |||||
2008 indiana fire code section 313. 1 314. 4-6 gasoline fueled vehicles will be stored and operated in Date: November 20, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: December 6, 2012 | Permit id: Svr12-00286 | |||||
Traffic lane use western lane of capitol ave from maryland street to georgia st to park a bmv ve Date: March 8, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-01450 | |||||
SCORE 80 Test Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Void | Current use: Apt office | Permit id: Str11-03831 | |||||
SCORE 96 Gratis permit underground relocation of ip&l conduits for cultural trail project; 2 curb lanes & Date: April 7, 2010 Contractor: T Fansler Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01573 | |||||
SCORE 96 Concrete curb sidewalk & ramp replacement on capitol st; brick removal for dpw project; emergency co Date: May 23, 2011 Contractor: James Sylvester Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02939 | |||||
Use of curb lane & 6 meters to park trucks for dealer expo from 2/16/12 thru 2/20/12; emergency cont Date: December 6, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06934 | |||||
Traffic lane use western lane of capitol ave from maryland street to georgia st to park a bmv ve Date: March 8, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-01185 | |||||
SCORE 93 Right of way Date: July 12, 2010 Contractor: Abby Cudworth Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Complete | Permit id: Row10-03881 | |||||
SCORE 99 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to hang holiday deco Date: November 17, 2011 Contractor: Daniel Miller Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06677 | |||||
Right of way Date: September 21, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit status: Issued | Permit id: Row10-05548 | |||||
Commission added conditions: 2008 indiana fire code section 1028. 2 exits will be altered or obstru Date: December 29, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00370 | |||||
Rolling traffic lane use to wrap the skywalk over capitol ave between the denison parking garage and Date: November 18, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06699 | |||||
SCORE 71 Test - plans uploaded Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Cancelled | Current use: Apt office | Permit id: Str11-03879 | |||||
SCORE 86 Installing conduit & set manhole for at&t; installing mh on w side of capitolacross from georgia at Date: September 2, 2010 Contractor: Kathleen Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05167 | |||||
Parking recruit vehicle on maryland st sidewalk across from victory field on 8/16/2011; emergency co Date: August 16, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row11-04672 | |||||
SCORE 96 Use of west side southbound traffic lane on capitol for staging equipment concrete truck & dumpsters Date: October 17, 2012 Contractor: Joseph Cathcart Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-06026 | |||||
Row curb lane and traffic lane use on the southside of maryland between the 300-5 block for fdic c Date: April 12, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-01689 | |||||
SCORE 98 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ georgia s Date: August 12, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-04684 | |||||
SCORE 89 Use of west curb lane on capitol ave between chesapeake and south sts n 7/24/12 for stormwater bmp c Date: July 20, 2012 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row12-04342 | |||||
SCORE 86 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to hang holiday deco Date: November 14, 2012 Contractor: James Engledow Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-06646 | |||||
84th national ffa convention with 550 attendees Date: September 15, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-05361 | |||||
Row curb lane and 4 meters for temporary rig parking on w maryland from 2/17/ thru 2/21/10; meter Date: November 10, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-06730 | |||||
20 indiana building code section 2406. 1. 1-safety glazing identification will not be provided for t Date: July 2, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr10-00102 | |||||
Row curb lane and 4 meters for temporary rig parking on w maryland from 2/16/ thru 2/20/10; meter Date: February 14, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Ready to issue | Permit id: Row11-00748 | |||||
SCORE 98 Installing conduit & set manhole for at&t; installing mh on w side of capitolacross from georgia at Date: September 2, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05167 | |||||
SCORE 86 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to remove holiday de Date: December 28, 2011 Contractor: James Engledow Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-07350 | |||||
SCORE 89 6 sf tent installation date: 10-24-12 removal date: 10-25-12 eme Date: September 6, 2012 Contractor: Glenn Rice Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Notification | Permit status: Open | Permit id: Not12-01923 | |||||
SCORE 96 Testing pack 12 - plans uploaded Date: March 23, 2012 Contractor: Michael Runnebohm Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Sewer connection | Permit status: Cancelled | Permit id: Swr12-00790 | |||||
SCORE 98 Use of sidewalk & traffic lane on capitol ave for cultural trail project from 5/19/11/ thru 08/20/11 Date: May 18, 2011 Contractor: Robert Hunt Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02783 | |||||
Traffic lane use; east lane on missouri street between south and maryland on 2/15/12 from 10: a. M. Date: December 13, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-07084 | |||||
Go express bus stop signs Date: December 28, 2012 Client: Go Express Travel | Permit type: Encroachment | Permit status: Complete | Permit id: Enc12-00145 | |||||
Curb lane and meter use for temporary parking on north side of maryland st from the nw corner of w m Date: November 18, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06693 | |||||
Traffic lane use on s capitol for vehicle loading/unloading for ride & drive event for dealer expo o Date: February 15, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-00786 | |||||
SCORE 96 Use of west side southbound traffic lane on capitol for staging equipment concrete truck & dumpsters Date: October 17, 2012 Contractor: Michael Kerr Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-06026 | |||||
Traffic lane use; south lane on maryland street between west and capitol on 2/15/12 from 10:00am-5:0 Date: December 13, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-07086 | |||||
SCORE 56 Super bowl xlvihost committee submittalconvention centertemporary tents - south parking lotsinstall Date: December 12, 2011 Contractor: Peter Souze Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str11-04897 | |||||
SCORE 96 Metes and bounds / new communication equipment for existing cell tower to include 3 new antennas and Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Extension - 180 | Expiration date: May 24, 2014 | Current use: Comm tower | Permit id: Str12-06361 | |||||
SCORE 82 Metes & bounds/ indiana convention center/ 4 sleds with roof mounted antennas for cellular communica Client: Verizon Wireless | Permit type: Structural | Permit status: Issued | Expiration date: May 15, 2012 | Current use: Comm tower | Permit id: Str11-04603 | |||||
SCORE 56 Traffic light sensor installationemergency contact: tom bothwell 281-6615 Date: April 6, 2010 Contractor: Nate Crowell Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01550 | |||||
SCORE 86 Blocking sidewalk parking lane & 1 traffic lane with boom-lift on maryland st to hang holiday deco Date: November 17, 2011 Contractor: James Engledow Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06677 | |||||
SCORE 82 Use of sidewalk & traffic lane on capitol ave for cultural trail project from 5/19/11/ thru 08/20/11 Date: May 18, 2011 Contractor: Eric Suess Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02783 | |||||
Metes & bounds legal / 4 sleds with roof mounted antennas for cellular communication purposes / work Date: November 9, 2011 Client: Verizon Wireless | Permit type: Improvement location permit | Permit status: Issued | Expiration date: November 9, 2013 | Permit id: Ilp11-01916 | |||||
2008 indiana fire code section 314. 4 gas & fuel levels in displayed vehicles will exceed limits al Date: June 6, 2011 Client: David Rick | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00140 | |||||
Row curb lane traffic lane and meter use for the international motorsports industry show; curb lane Date: November 8, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-06598 | |||||
Blocking traffic lanes (crossing all lanes) on capitol ave with rolling crane to remove 75 x 67 Date: May 10, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-02776 | |||||
Blood drive Date: July 14, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-03899 | |||||
SCORE 86 Removing decorations from conv center sidewalk and parking lane on maryland west of capitol s sideem Date: December 19, 2012 Contractor: James Engledow Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Complete | Permit id: Row12-07290 | |||||
SCORE 89 Use of sidewalk & curb lane at corner of capitol ave and louisiana st on 8/7/12 for sewer televising Date: August 6, 2012 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-04647 | |||||
Commission added condition: (gar) 675 iac 12-4-9 existing sprinkler heads will be obstructed withi Date: December 29, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr11-00372 | |||||
2002 nfpa 72 section 6. 8. 1. 1 - the alarm notification will not comply or sound as specfied in nfpa 7 Date: December 20, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Approved | Permit id: Svr10-00230 | |||||
1998 indiana building code section 1004. 3. 4. 3-an existing open parking garage will have a non rated Date: December 15, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: December 15, 2011 | Permit id: Svr03-00058 | |||||
1998 indiana fire code section 1109. 8. 2-lit candles will be used as part of the firefighters memoria Date: December 15, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: December 15, 2011 | Permit id: Svr03-00057 | |||||
SCORE 87 Request for extended hours approved 6 pm - 6 am / metes and bounds legal / convention cent Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Issued | Expiration date: October 9, 2013 | Current use: Convention center | Permit id: Str12-05835 | |||||
2008 indiana fire code section 3503. 1. 1-the center will be used for operation of motor vehicles powe Date: August 10, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: October 4, 2012 | Permit id: Svr12-00197 | |||||
SCORE 79 Rear of address cut and trench from middle of west st e to the curb line of missouri then microtrenc Date: November 15, 2011 Contractor: Jeff Rinartz Permit type: Right of way | Permit status: Issued | Permit id: Row11-06607 | |||||
Access ramp for indiana convention center from dock area to csx above-grade railroad tracks with ret Date: May 17, 2010 Permit type: Encroachment | Permit status: Review | Permit id: Enc10-00048 | |||||
Kappa alpha psi fraternity inc biennial grand chapter meeting centennial celebration Date: May 9, 2011 Permit type: Right of way | Permit status: Issued | Permit id: Row11-02522 | |||||
Vehicle demonstrations using south curb lane on maryland st between west st and capitol ave on 3/6/1 Date: November 7, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Cancelled | Permit id: Row11-06454 | |||||
Use of two traffic lanes on w maryland in front of convention center from 1/16/13 thru 1/17/13 for b Date: January 8, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-00170 | |||||
Traffic lane use; south lane on maryland street between west and capitol on 2/13/13 from 10:00am-5:0 Date: January 22, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-00410 | |||||
Traffic lane use; on capitol ave between on 2/14/13 from 9:00am-5:00pm; 2/15/13 from 9:00am-3:00pm; Date: February 6, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-00683 | |||||
Racing trade show Date: February 21, 2013 Permit type: Right of way | Permit status: Cancelled | Permit id: Row13-01022 | |||||
Use of curb lanes around convention center for racing trade show; use of south st maryland st west s Date: March 4, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-01185 | |||||
Use of parking lane & 3 meters on w maryland st to park sprinter van during convention center event Date: March 27, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-01647 | |||||
Use of traffic ln on w maryland st to apply graphic to indiana convention center on maryland st for Date: April 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02067 | |||||
Use of traffic ln on w maryland st to remove graphic to indiana convention center on maryland st for Date: April 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02068 | |||||
Use of traffic ln on capitol ave to install graphic to indiana convention center on capitol ave for Date: April 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02069 | |||||
Use of traffic ln on capitol ave to remove graphic to indiana convention center on capitol ave for f Date: April 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02070 | |||||
Oversize/overweightemergency contact: dave green 651-462-1000 Date: April 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-02073 | |||||
Placement of wayfinders on the sidewalk in 4 different areas for the fdic convention on 4/19/13; eme Date: April 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02090 | |||||
Removal of wayfinders on the sidewalk in 4 different areas for the fdic convention on 4/29/13; emerg Date: April 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02091 | |||||
Oversize/overweightemergency contact: jean foy 402-568-2224 Date: April 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-02106 | |||||
Placement of wayfinding flags on the sidewalk in multiple areas for the fdic convention on 4/19/13; Date: April 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02108 | |||||
Removal of wayfinding flags on the sidewalk in multiple areas for the fdic convention on 4/29/13; em Date: April 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02110 | |||||
Oversize/overweightemergency contact: kristi 715-294-2555 Date: April 19, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-02144 | |||||
Use of traffic ln on capitol ave to remove graphic to indiana convention center on capitol ave for d Date: May 9, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02512 | |||||
Move equipment and supplies in and out on south side of maryland approx 1 ft e of west st souther Date: May 15, 2013 Permit type: Right of way | Permit status: Complete | Permit id: Row13-02593 | |||||
Cardinal contracting llc placing a crane lift on the adjacent traffic to 1 s capitol ave/ to l Date: May 30, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-02900 | |||||
16771 - religious high school youth conference Date: July 12, 2013 Permit type: Right of way | Permit status: Issued | Permit id: Row13-03798 | |||||
Use of south traffic ln on w maryland st during the american chemical sociaty nat meeting at india Date: August 8, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-04392 | |||||
Use of sidewalk along maryland st toward west st from bus shelter on south side of street for gen-co Date: August 13, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-04437 | |||||
Use of traffic lane and sidewalk to hang exact target connections banner on jw marriott sky walk on Date: September 12, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-04985 | |||||
SCORE 89 Fluid waste services inc./ stormwater treatment umt cleaningon capital ave blocking traffic ln on 10 Date: October 1, 2013 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Cancelled | Permit id: Row13-05287 | |||||
SCORE 89 Fluid waste services inc./ stormwater treatment umt cleaningon capital ave blocking traffic ln on 10 Date: October 1, 2013 Contractor: Charles Mcauley Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Cancelled | Permit id: Row13-05287 | |||||
Going from in conv ctr to i-465 east side missouri to maryland st to washington to southeastern to Date: October 1, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-05297 | |||||
Use of traffic ln on capitol ave to install graphic to indiana convention center on capitol ave for Date: October 9, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-05443 | |||||
SCORE 89 Use of traffic ln on capitol ave from georgia st to south st for stormwater treatment unit cleaning Date: October 29, 2013 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-05800 | |||||
SCORE 89 Use of traffic ln on capitol ave from georgia st to south st for stormwater treatment unit cleaning Date: October 29, 2013 Contractor: Charles Mcauley Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-05800 | |||||
Use of traffic ln parking ln & sidewalk on maryland st on 11/16/13 to hang holiday decor on exterior Date: November 14, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-06074 | |||||
SCORE 96 Storm sewer repair for united water. Kent haste 317-223-7332 Date: November 21, 2013 Contractor: Janet Haste Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row13-06208 | |||||
Use of traffic ln on capitol ave to install graphic to indiana convention center glass cube for big Date: November 27, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-06308 | |||||
Use of traffic ln on maryland st to install graphic on westin hotel skywalk #2 on 1/2/14 and to remo Date: December 17, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-06639 | |||||
Use of traffic ln parking ln & sidewalk on maryland st on 12/28/13 to remove holiday decor on exteri Date: December 26, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row13-06716 | |||||
One new wall sign affixed to sky bridge/ welcome to connections 2013 lead from within exact target & Date: September 12, 2013 Client: Capital Improvement Board Of Managers Of Marion County Indiana | Permit type: Sign | Permit status: Issued | Expiration date: September 12, 2015 | Permit id: Sgn13-00927 | |||||
Metes and bound legal / new wall sign on sky bridge north east corner of capitol and maryland for co Date: October 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Sign | Permit status: Issued | Expiration date: October 16, 2015 | Permit id: Sgn13-01055 | |||||
Metes and bounds legal / proposed skywalk banner 2162sf on east and west elevations of skywalk no. 2 Date: December 16, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Sign | Permit status: Ready to issue | Permit id: Sgn13-01251 | |||||
SCORE 96 Metes and bound legal / remodel of existing cell tower per plans / 2013reg1 / cbd2 rc / center twp Client: Sprint | Permit type: Structural | Permit status: Issued | Expiration date: July 8, 2014 | Current use: Comm tower | Permit id: Str13-05013 | |||||
SCORE 86 Metes and bound legal / remodel of existing cell tower per plans / 2013reg1 / cbd2 rc / center twp Client: Sprint | Permit type: Structural | Permit status: Issued | Expiration date: July 8, 2014 | Current use: Comm tower | Permit id: Str13-05013 | |||||
2008 indiana fire code section 313. 1 314. 4-fueld vehicles will be operated indoors at the event. Date: October 24, 2013 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: State variance | Permit status: Closed | Completion date: December 4, 2013 | Permit id: Svr13-00230 | |||||
SCORE 96 Adding section to substation for 12 amp feed to distribution panel Date: September 12, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03043 | |||||
SCORE 96 Provide temporary service for super bowl event tent Date: December 27, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: November 17, 2012 | Permit id: Ele11-04524 | |||||
SCORE 86 Metes and bounds new communication equipment for existing cell tower to include 3 new antennas and Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Extension - 180 | Expiration date: May 24, 2014 | Current use: Comm tower | Permit id: Str12-06361 | |||||
SCORE 96 Total evening road closure of s capitol ave from maryland st to georgia st from 9 7 thru 9 10 10; Date: August 31, 2010 Contractor: T Fansler Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05112 | |||||
SCORE 98 Installing manhole for at&t installing mh on w side of capitolacross from georgia at edge of safet Date: August 26, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05016 | |||||
Row curb lane use for bus parking; southern lane of maryland between west & missouri sts; from 5 13- Date: April 27, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-02110 | |||||
SCORE 100 Install dedicated phone equipment room cooling equipment including all necessary ductwork. Date: October 27, 2011 Contractor: Jeff Martin Client: Indiana Convention Center | Permit type: Heating & cooling | Permit status: Received | Permit id: Htg11-08130 | |||||
Use of parking lane & 2 meters to park sprinter van during convention center event from 12 3 12 thru Date: November 15, 2012 Client: Indiana Stadium & Convention Building Authority | Permit type: Right of way | Permit status: Issued | Permit id: Row12-06672 | |||||
Use of curb lane on capitol ave from maryland st to south st from 1 23-1 27 to install building grap Date: January 18, 2012 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-00303 | |||||
SCORE 96 Gratis permit underground relocation of ip&l conduits for cultural trail project; 2 curb lanes & Date: April 7, 2010 Contractor: T Fansler Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-01573 | |||||
SCORE 96 Provide temporary service for super bowl event tent Date: December 27, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: November 17, 2012 | Permit id: Ele11-04524 | |||||
SCORE 96 Concrete curb sidewalk & ramp replacement on capitol st; brick removal for dpw project; emergency co Date: May 23, 2011 Contractor: James Sylvester Client: Marion County Capital Imp Bd Of Managers Of One Rca Dome | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02939 | |||||
SCORE 96 Adding section to substation for 12 amp feed to distribution panel Date: September 12, 2011 Contractor: James Tsareff Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Electrical | Permit status: Issued | Expiration date: September 17, 2012 | Permit id: Ele11-03043 | |||||
Use of curb lane & 6 meters to park trucks for dealer expo from 2 16 12 thru 2 20 12; emergency cont Date: December 6, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-06934 | |||||
Parking recruit vehicle on maryland st sidewalk across from victory field on 8 16 2011; emergency co Date: August 16, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row11-04672 | |||||
SCORE 98 Row excavation to install conduit for at&t ; ( test hole in traffic lane of capitol ave @ georgia s Date: August 12, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-04684 | |||||
SCORE 89 Use of west curb lane on capitol ave between chesapeake and south sts n 7 24 12 for stormwater bmp c Date: July 20, 2012 Contractor: Rich Schroeder Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row12-04342 | |||||
Row curb lane and 4 meters for temporary rig parking on w maryland from 2 17 thru 2 21 10; meter Date: November 10, 2010 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row10-06730 | |||||
Row curb lane and 4 meters for temporary rig parking on w maryland from 2 16 thru 2 20 10; meter Date: February 14, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Ready to issue | Permit id: Row11-00748 | |||||
SCORE 98 Installing conduit & set manhole for at&t; installing mh on w side of capitolacross from georgia at Date: September 2, 2010 Contractor: Michael Thompson Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row10-05167 | |||||
SCORE 96 Testing pack 12 - plans uploaded Date: March 23, 2012 Contractor: Michael Runnebohm Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Sewer connection | Permit status: Cancelled | Permit id: Swr12-00790 | |||||
SCORE 98 Use of sidewalk & traffic lane on capitol ave for cultural trail project from 5 19 11 thru 08 20 11 Date: May 18, 2011 Contractor: Robert Hunt Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row11-02783 | |||||
Traffic lane use; east lane on missouri street between south and maryland on 2 15 12 from 10: a. M. Date: December 13, 2011 Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row11-07084 | |||||
SCORE 93 Metes and bounds legal / per: 2011-reg-093 / add 3 antennas 6 rrus fiber and dc cables and fiber de Client: At&t Mobility | Permit type: Structural | Permit status: Issued | Expiration date: February 25, 2012 | Current use: Antenna | Permit id: Str11-03345 | |||||
SCORE 89 Use of sidewalk & curb lane at corner of capitol ave and louisiana st on 8/7/12 for sewer televising Date: August 6, 2012 Contractor: Charles Mcauley Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Complete | Permit id: Row12-04647 | |||||
SCORE 96 Metes & bounds/ indiana convention center/ 4 sleds with roof mounted antennas for cellular communica Client: Verizon Wireless | Permit type: Structural | Permit status: Issued | Expiration date: May 15, 2012 | Current use: Comm tower | Permit id: Str11-04603 | |||||
SCORE 89 Use of west curb lane on capitol ave between chesapeake and south sts n 7/24/12 for stormwater bmp c Date: July 20, 2012 Contractor: Charles Mcauley Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Right of way | Permit status: Issued | Permit id: Row12-04342 | |||||
SCORE 96 Place temporory strand fiber optic cable and copper cable over west/missouri streets utilizing the e Date: September 14, 2011 Contractor: Brian Cravens Client: Capital Improvement Board Of Managers Of Marion County Indiana | Permit type: Right of way | Permit status: Denied | Permit id: Row11-05339 | |||||
SCORE 92 Request for extended hours approved 6 pm - 6 am / metes and bounds legal / convention cent Client: Marion County Capital Imp Bd Of Managers Of | Permit type: Structural | Permit status: Issued | Expiration date: October 9, 2013 | Current use: Convention center | Permit id: Str12-05835 | |||||
SCORE 89 Super bowl xlvihost committee structure #16 - indy car covertemporary structure12 sfinstalled: 1/1 Date: January 16, 2012 Contractor: Mark Dodd Client: Marion County Convention & Recreation Facilities Authority % P E | Permit type: Structural | Permit status: Closed | Completion date: February 28, 2012 | Expiration date: August 26, 2012 | Permit id: Str12-00154 | |||||
SCORE 99 Metes and bounds legal / per: 2011-reg-093 / add 3 antennas 6 rrus fiber and dc cables and fiber de Client: At&t Mobility | Permit type: Structural | Permit status: Issued | Expiration date: February 25, 2012 | Current use: Antenna | Permit id: Str11-03345 |