Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Demolition & construction of non-structural partitions & finishes,relocate light fixtures,no increas Current use: Office | Permit id: 200411169298 | |||||
SCORE 99 Revision to prev 200411169298 see sheet a-1. Current use: Office | Permit id: 200411300312 | |||||
SCORE 65 Tapping for loose brick veneer & replace on the street sides of the bldng. Current use: Apartments | Permit id: 200404141271 | |||||
SCORE 100 Remodel unit 12 kitchen&bath. R r cabinets,appliance. Install plumb fix. Repl light,drywall,floorin Current use: Apartments | Permit id: 200406116260 | |||||
Minor alterations to (e) tenant space ![]() ![]() Current use: Office | Permit id: 200407138702 | |||||
SCORE 100 Demo of interior partitions,ceiling grid & finishes. Area to remain unoccupied per sfab 017 Current use: Office | Permit id: 200502044838 | |||||
SCORE 99 Interior alt to existing space (minor) demo & const. Of non structural partitions, ceilings & finish Current use: Office | Permit id: 200502085063 | |||||
SCORE 100 Mechanical & sprinklers @ 1st floor only. Current use: Office | Permit id: #200503107253 | |||||
SCORE 95 Replace kitchen cabinets appliances lights with new no structural work Current use: Apartments | Permit id: #200505021282 | |||||
SCORE 96 (e)kitchen & bathroom replacement. No structural work provide fluorcesant light fixture. Current use: Apartments | Permit id: #200508220832 | |||||
SCORE 100 #7- relocate 2 heads add 1 upright head t. I. Upgrade of existing sprinkler system. Current use: Apartments | Permit id: #200812118289 | |||||
SCORE 99 Revision to pa# 2008-0711-6512-new moment frame & beam strengthing Current use: Apartments | Permit id: #200812128419 | |||||
SCORE 99 #7- remodel 3 existing bathrooms new electric radiant heating at master bath floor built in desk at office new lighting. Revision to approved building permit application #200807116512. Current use: Apartments | Permit id: #200812239128 | |||||
SCORE 99 Demo existing walls door carpet on 1st floor (per ab-17) tenant improvement under separate permit. Current use: Office | Permit id: #200804230436 | |||||
SCORE 99 Unit #7-remodel kitchen & 3 bathrooms. New interior railing water heater on 3rd floor. Remove load bearing wall at kitchen & wall at dining room. Replace bath finishes. 4th floor remove wall to enlarge closet & reconfigure bath. Change finishes in other bath. Elect plmb on separate permit. Current use: Apartments | Permit id: #200807116512 | |||||
SCORE 100 2nd floor-tenant improvements to include minor demolition new walls and upgrades to meet ada requirements. Mep fire safety & sprinkler under seperate permit. No increase in office space. Interior work only. Current use: Office | Permit id: #200808128997 | |||||
SCORE 100 2nd floor revision to appl #200808128997 to remove automatic door opener o stall door in disabled access bathroom. Current use: Office | Permit id: #200809040749 | |||||
SCORE 96 2nd floor-addition of new fire alarm devices to (e) fire alarm panel. 3 smoke detectors 1 control module 1 power supply 7 strobes 14 speaker strobes Current use: Office | Permit id: #200809101234 | |||||
SCORE 100 Fire alarm life safety installation of 2 speaker strobes on 1st floor. Current use: Office | Permit id: #200809252653 | |||||
SCORE 96 2nd floor-as built revision to pa# 2008-0910-1234-added to scope: 4 speaker strobes 1 smoke detector Current use: Office | Permit id: #200809292914 | |||||
SCORE 95 Unit 45 - replace existing spiral stair w open tread stair per drawings supplied. Current use: Apartments | Permit id: #200905077958 | |||||
SCORE 95 Unit 45 - 1 kitchen remodel & 2 bath remodel. Replace track lighting w recessed lighting. Replace carpet w wood flooring incl tile work on wall & floor for bathroom & kitchen. Electrical and plumbing under separate permit. Current use: Apartments | Permit id: #200905088068 | |||||
SCORE 99 Work @ unit# 7 only. Reflashing of 2 living room windows & 1 kitchen window. Remove brick vemeer & stucco about 6 to 12 wide at jambs & sills of windows. Install new flashing at jambs & sills of windows & reinstall lath & stucco & brick veneer. Current use: Apartments | Permit id: #200906029509 | |||||
SCORE 100 Work @ unit# 2 only. Replace kitchen cabinets. Replace tub in master bath. Replace tiles in master bath. Min 50% of kitchen light wattage shall be of fluorescent. Current use: Apartments | Permit id: #200906160512 | |||||
SCORE 100 Unit 4 - replace existing kitchen cabinets bath vanity wet bar cabinet and counters. Current use: Apartments | Permit id: #200906301684 | |||||
SCORE 100 Pre-construction demolition under ab017. Demo interior partitions only. Fire sprinklers & life safety to remain operational. No fire rated construction to be removed. Current use: Office | Permit id: #200908074348 | |||||
SCORE 99 Remodel kitchen and bathrooms new recessed light fixtures plumb gas line to fireplace and range in kitchen. New hardwood floors and new opening in kitchen wall Current use: Apartments | Permit id: #201001285509 | |||||
SCORE 100 Addition of 2 smoke detectors 12 speakers strobes 3 strobes & a strobe power supply for the goldman fund tenant remodel on floor 2. All new devices connect onto the extg fire alarm system. Current use: Office | Permit id: #201010012040 | |||||
SCORE 100 Mechanical & electrical work associated with approved permit #201009160999 Current use: Office | Permit id: #201010062425 | |||||
SCORE 100 Remodel existing restrooms to comply with ada new finishes in 2nd fl office Current use: Office | Permit id: #201010082595 | |||||
SCORE 100 2nd floor - 95 removed sprinklers 84 added sprinklers Current use: Office | Permit id: #201010193342 | |||||
SCORE 100 2nd floor-tenant improvements to (e) fire sprinkler system-14 removed sprinklers & 11 new pendent sprinklers Current use: Office | Permit id: #201010263746 | |||||
SCORE 100 Creation of common corridor on 2nd floor. New ada compliant stair hand and guard rails Current use: Office | Permit id: #201009201178 | |||||
SCORE 100 Floor 2nd - addition of 6 speaker strobes for the corridor remodel. All new devices connect onto the existing fire alarm system. Current use: Office | Permit id: #201012015841 | |||||
Interior condo residence remodel. New skylights new finishes remodel kitchen remodel baths new hvac new electrical outlet and lighting layout. ![]() ![]() Current use: Apartments | Permit id: #201012237332 | |||||
SCORE 91 Unit #15-interior remodeling-relocate coat closet in the foyer expand kitchen new cabinets appliances & new configuration. Patch & repair adjacent surfaces paint refinish floors. No structural work- sprinklers separate permit. Current use: Apartments | Permit id: #201003087745 | |||||
SCORE 95 Replace appliances in kitchen. New stove needs gas vs. Electricity. Run new gas line & rewire from 2 to 1 for new stove Current use: Apartments | Permit id: #201003299143 | |||||
SCORE 100 2nd floor-demo of non structural partitions build back of non structural partitions. All new or revised hvac electrical plumbing sprinkler & life safety will be design build & submitted under seperate permit. Building is fully sprinklered Current use: Office | Permit id: #201009160999 | |||||
SCORE 100 Creation of common corridor on 2nd floor. New ada compiant stair hand and guard rails ![]() ![]() Current use: Office | Permit id: #201009201178 | |||||
SCORE 99 We will be waterproofing 2 leaking windows that are attached. We will be removing the brick veneer and stucco around the windows and installing new flashing and replacing the stucco and the brick veneer Current use: Apartments | Permit id: #201105246667 | |||||
SCORE 92 Unit #8-nfpa-b fire sprinkler t. I. For condo remodel Current use: Apartments | Permit id: #201106248833 | |||||
SCORE 100 Install new shower in bath (remove bathtub) install new tiles lighting to comply w cec 1 (k) install new vanity. No change to exhaust system. No change to walls windows or doors. Current use: Apartments | Permit id: #201106309248 | |||||
SCORE 100 1st floor - fire sprinkler system upgrade. Relocate 19 pendents sprinkler heads. Current use: Office | Permit id: #201108222944 | |||||
SCORE 100 Unit #41-general interior remodel-move electrical sub panel new light fixtures remove & replace cabinets. Not adding or moving any walls Current use: Apartments | Permit id: #201109013766 | |||||
16th floor. T. I includes building new 2 door set of doors. Revised electrical and life safety work will be design build and submitted for permit separately. Bldg is fully sprinkled. ![]() Current use: Office | Permit id: #201212115906 | |||||
SCORE 100 16th floor. T. I includes building new 2 door set of doors. Revised electrical and life safety work will be design build and submitted for permit separately. Bldg is fully sprinkled. Current use: Office | Permit id: #201212115906 | |||||
SCORE 100 Mechanical only for app#201212115906 Current use: Office | Permit id: #201301158052 | |||||
SCORE 98 Bldg c- demolition and construction of interior non-load bearing partition doors and finsihes. Mep life safety and fire sprinkler under seperate permit. Current use: Office | Permit id: #201312113892 | |||||
SCORE 100 Fire sprinkler system upgrade; relocate 8 pendent sprinkler on the 2nd floors. Current use: Office | Permit id: #201302120040 | |||||
2nd floor: t. I. Include bldg new non structural partition and new break room millwork. All new or revised hvac electrical plumbing & life safety work will be designed build & submitted seperately. Bldg fully sprinklered. ![]() ![]() Current use: Office | Permit id: #201303202624 | |||||
SCORE 99 Preparing the existing fireplace for gas insert. Opening wall where needed for extention of gas lines. Break out the existing harth and fireplace surround Current use: Apartments | Permit id: #201306119189 | |||||
SCORE 100 Addition of 4 speaker strobes for the esurance remodel on floor 2. All new devices connect onto fire alarm system Current use: Office | Permit id: #201401065566 | |||||
SCORE 96 Bldg 3 1st flr: tenant improvements new lighting new elec tele data new finishes; maher n a. Current use: Office | Permit id: #201410108595 | |||||
SCORE 100 2nd flr: relocate 57 pendants ti 201406118090; maher n a Current use: Office | Permit id: #201410219481 | |||||
SCORE 98 T. I. On 2nd floor. Work include construcito of non-load bearing partitions doors and finishes. Mep under separate permit. Maher n a. Current use: Office | Permit id: #201406118090 | |||||
SCORE 100 New ductwork air outlets thermostats for tenant improvement. Reuse existing heat pumps. Provide new supplemental cooling units. New fsd and 16 new dsds. Ref #201406118090. Compliance with ord 155-13 not required Current use: Office | Permit id: #201409116093 | |||||
SCORE 95 Permit fee to reopen existing permit #ew20140630061 that was closed by accident ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150810181 | |||||
SCORE 95 The goldman foundation 2nd floor - tenant build-out - job 33270 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130103942 | |||||
SCORE 95 3 lights and 6 plugs- job #33980 ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20141209501 | |||||
SCORE 93 Installation of 169 modular workstation ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20141218681 | |||||
SCORE 100 Install modular electrical into modular office partitions. Small reconfigure not original installation. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130221941 | |||||
SCORE 93 Installation of 69 modular workstations ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140114221 | |||||
SCORE 98 Revision to pa#2014-06-11-80 to request equivalent facilitation addition to two single occupant accessible restrooms. Permit type: Building permit | Current use: Office | Permit id: #201412173922 | |||||
SCORE 100 As built for 201409116093 new locations for dsds. Indentification of parking garage closed location of fsd for bathroom exhaust identificaion of existing heat pumps. Maher not req Permit type: Building permit | Current use: Office | Permit id: #201501165979 | |||||
SCORE 59 Install 99 cat 5 cables terminate test ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201411074238 | |||||
SCORE 100 Interior tenant improvement: combine 2(e) office suites demolition & construction of non-structural partitions ceilings & finishes. Mep work required due to project scope shall be under separate permit. Sprinkler work under separate permit (no change in occupancy). Permit type: Building permit | Expiration date: April 15, 2012 | Current use: Office | Permit id: #201104144051 | |||||
SCORE 100 Partial floor tenant impr. For single tenant including selective demoltion new partitions new ceiling finishes. Sprink life safty mech lighting under seperate permit. Permit type: Building permit | Expiration date: August 3, 2012 | Current use: Office | Permit id: #201107069565 | |||||
SCORE 100 Work category: 4pb; relocate 13 sprinkler heads for new 1st floor tenant phoenix editorial ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110823225 | |||||
SCORE 100 Grnd flr: remodel of extg restrooms including finishes and fixtures to meet ada code compliance. Permit type: Building permit | Expiration date: April 11, 2012 | Current use: Office | Permit id: #201104073652 | |||||
SCORE 100 1st floor - fire sprinkler system upgrade. Relocate 19 pendents sprinkler heads. Permit type: Building permit | Expiration date: February 22, 2012 | Current use: Office | Permit id: #201108222944 | |||||
SCORE 100 Revision to pa 2016-0609-95 - addition of structural detail for a suspended soffit. Maher na Permit type: Building permit | Expiration date: December 12, 2016 | Current use: Office | Permit id: #201608124869 | |||||
SCORE 98 Suite 2003 relocate 19 fire sprinklers and plug 11 outlets to conform with new wall ceiling layout. Reference 2016. 0610. 9650 Permit type: Building permit | Expiration date: February 28, 2017 | Current use: Office | Permit id: #201608296195 | |||||
SCORE 100 Provided new lighting & branch circuiting to existing panel. Maintained some of the (e) power and signal outlets and provided additional new power branch circuiting and raceway systems as req to new power and signal outlets; provided title 24 compliance forms. Ref pa 2016-0609-9520 Permit type: Building permit | Expiration date: September 1, 2017 | Current use: Office | Permit id: #201608306326 | |||||
SCORE 100 1st floor: revision to ref pa 2016060995 expansion at break room area Permit type: Building permit | Expiration date: February 28, 2017 | Current use: Office | Permit id: #201608316446 | |||||
SCORE 98 Bldg c- demolition and construction of interior non-load bearing partition doors and finsihes. Mep life safety and fire sprinkler under seperate permit. Permit type: Building permit | Expiration date: June 11, 2014 | Current use: Office | Permit id: #201312113892 | |||||
16th floor. T. I includes building new 2 door set of doors. Revised electrical and life safety work will be design build and submitted for permit separately. Bldg is fully sprinkled. ![]() Permit type: Building permit | Current use: Office | Permit id: #201212115906 | |||||
SCORE 100 Fire sprinkler system upgrade; relocate 8 pendent sprinkler on the 2nd floors. Permit type: Building permit | Expiration date: June 12, 2013 | Current use: Office | Permit id: #201302120040 | |||||
SCORE 100 Work category: 4pb; relocate sprinklers on the 2nd floor ggfp# 12-339 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130208586 | |||||
SCORE 93 Work category: 5p; installing a tiled shower pan. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150210907 | |||||
SCORE 100 16th floor. T. I includes building new 2 door set of doors. Revised electrical and life safety work will be design build and submitted for permit separately. Bldg is fully sprinkled. Permit type: Building permit | Expiration date: January 15, 2014 | Current use: Office | Permit id: #201212115906 | |||||
SCORE 100 Mechanical only for app#201212115906 Permit type: Building permit | Expiration date: May 16, 2013 | Current use: Office | Permit id: #201301158052 | |||||
SCORE 100 Work category: 5p; remodel 2 mens and womens restrooms ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110622146 | |||||
SCORE 91 Unit #15-interior remodeling-relocate coat closet in the foyer expand kitchen new cabinets appliances & new configuration. Patch & repair adjacent surfaces paint refinish floors. No structural work- sprinklers separate permit. Permit type: Building permit | Expiration date: March 10, 2011 | Current use: Apartments | Permit id: #201003087745 | |||||
2nd floor: t. I. Include bldg new non structural partition and new break room millwork. All new or revised hvac electrical plumbing & life safety work will be designed build & submitted seperately. Bldg fully sprinklered. ![]() ![]() Permit type: Building permit | Expiration date: March 26, 2014 | Current use: Office | Permit id: #201303202624 | |||||
SCORE 100 Work category: 5p; new tenant sink in suite 204 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20130318390 | |||||
SCORE 100 Tenant improvements existing fire sprinkler system removed. 2 added 4 relocates Permit type: Building permit | Expiration date: September 11, 2011 | Current use: Office | Permit id: #201105115785 | |||||
SCORE 100 Work category: 4pb; provide fire sprinkler tenant improvement at 1st floor partners for growth space ar&b # 11-073 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20110512486 | |||||
SCORE 100 Creation of common corridor on 2nd floor. New ada compliant stair hand and guard rails Permit type: Building permit | Expiration date: November 9, 2011 | Current use: Office | Permit id: #201009201178 | |||||
SCORE 100 Mechanical & electrical work associated with approved permit #201009160999 Permit type: Building permit | Expiration date: October 6, 2012 | Current use: Office | Permit id: #201010062425 | |||||
SCORE 100 Remodel existing restrooms to comply with ada new finishes in 2nd fl office Permit type: Building permit | Expiration date: October 8, 2011 | Current use: Office | Permit id: #201010082595 | |||||
SCORE 100 2nd floor - 95 removed sprinklers 84 added sprinklers Permit type: Building permit | Expiration date: April 19, 2011 | Current use: Office | Permit id: #201010193342 | |||||
SCORE 100 2nd floor-tenant improvements to (e) fire sprinkler system-14 removed sprinklers & 11 new pendent sprinklers Permit type: Building permit | Expiration date: February 26, 2011 | Current use: Office | Permit id: #201010263746 | |||||
SCORE 100 Work category: 5p; provide rough and finish plumbing for tenant sinks shower rooms and restrooms 2nd floor. Ar&b job number 14-159 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141010894 | |||||
SCORE 100 Work category: 4pb; esurance - relocated 57 pendents ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20141021201 | |||||
Bldg 3 1st flr: tenant improvements new lighting new elec/tele/data new finishes; maher n/a. ![]() ![]() Permit type: Building permit | Expiration date: October 24, 2015 | Current use: Office | Permit id: #201410108595 | |||||
SCORE 100 2nd floor-demo of non structural partitions build back of non structural partitions. All new or revised hvac electrical plumbing sprinkler & life safety will be design build & submitted under seperate permit. Building is fully sprinklered Permit type: Building permit | Expiration date: September 29, 2012 | Current use: Office | Permit id: #201009160999 | |||||
SCORE 100 Creation of common corridor on 2nd floor. New ada compiant stair hand and guard rails ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201009201178 | |||||
SCORE 100 Work category: 5p; restroom remodel ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110922736 | |||||
SCORE 99 New ductwork air outlets & thermostats for ti; re-use existing heat pumps; provide new supplemental cooling units; 16 new dsds & new fsd ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20140917163 | |||||
SCORE 96 Bldg 3 1st flr: tenant improvements new lighting new elec tele data new finishes; maher n a. Permit type: Building permit | Expiration date: October 24, 2015 | Current use: Office | Permit id: #201410108595 | |||||
Unit #2 2nd floor: 8 lights 2 switches 8 receptacles; upgrade electrical in kitchen adn master bath Permit status: Complete | Permit id: E20090616367 | |||||
Installation of 69 modular workstations Permit status: Complete | Permit id: Ew20140114221 | |||||
Permit fee to reopen existing permit #ew20140630061 that was closed by accident Permit status: Complete | Permit id: Ew20150810181 | |||||
Installation of 169 modular workstation Permit status: Complete | Permit id: Ew20141218681 | |||||
Elec and tel data work - jobs 33384 & t333 - 2nd floor keyser marston Permit status: Complete | Permit id: Ew20130322281 | |||||
Tel data - t22685 - 2nd floor goldman Permit status: Complete | Permit id: Ew20130117821 | |||||
T i lights plugs switches Permit status: Complete | Permit id: Ew20110803563 | |||||
Golden gateway commons plaza level. 15 lights switches 16 receptacles circuits. Permit status: Complete | Permit id: E200505025978 | |||||
Remodel unit # 2 5 lights 3 switches receptacles 2 circuits 1 fan Permit status: Complete | Permit id: E200308292216 | |||||
Restroom remodel- new light and ceiling sensor Permit status: Complete | Permit id: Ew20110920493 | |||||
Lights 13 switches 108 receptacles 42 circuits. 1-225 amp panel & transformer. Phoenix editorial. Permit status: Complete | Permit id: E200502233541 | |||||
Remodeling of existing space providing new furniture feeds and light fixtures with switching. Scope of work includes extending life safety system. Permit status: Complete | Permit id: Ew20140630061 | |||||
The goldman foundation 2nd floor - tenant build-out - job 33270 Permit status: Complete | Permit id: Ew20130103942 | |||||
3 lights and 6 plugs- job #33980 Permit status: Complete | Permit id: Ew20141209501 | |||||
Install 99 cat 5 cables terminate test Permit status: Complete | Permit id: E201411074238 | |||||
8 lights 2 switches 7 receptacles 2 circuits. Tenant: bay city. Permit status: Complete | Permit id: E200809091032 | |||||
2nd floor: installing cubical whips to existing electrical elastra 1 pacifc. Sf.; (13) basefeeds cubical whips floor monuments Permit status: Complete | Permit id: E200809221472 | |||||
Install category 6 data voicecable for 2nd floor relocation to workstations office locations. Permit status: Complete | Permit id: E201401086447 | |||||
Electrical demo inspection only - 1 pacific ave. 2nd floor. # Permit status: Complete | Permit id: Ew20090824783 | |||||
Install modular electrical into modular office partitions. Small reconfigure not original installation. Permit status: Complete | Permit id: Ew20130221941 | |||||
Restroom upgrade - job #32621 Permit status: Complete | Permit id: Ew20101029623 | |||||
2 lights 6 swithches 4 receptacles partners for growth Permit status: Complete | Permit id: E20041202693 | |||||
Goldman fund (92)lights (25)switches (44)receptacles (42)circuits new speaker strobes Permit status: Complete | Permit id: Ew20101025381 | |||||
Kitchen & bathroom remodel 18 lights switches 14 receptacles 8 circuits Permit status: Complete | Permit id: E200407265589 | |||||
2 lights 8 switches receptacles. Life safety - 5 strobes 5 speakers. Permit status: Complete | Permit id: E20080903794 | |||||
Change two lights and change the outlets to g. F. I. Outlets for the kitchen. (unit no 24) Permit status: Complete | Permit id: E200512213671 | |||||
Modular office furniture: workstations Permit status: Complete | Permit id: Ew20101222061 | |||||
Corridor upgrade (9)lights (2)switches (2)receptacles Permit status: Complete | Permit id: Ew20101030841 | |||||
T i lights plugs switches Permit status: Complete | Permit id: Ew20110421821 | |||||
2nd floor: 1 receptacles; installation of electrical components of a modular partition system. Permit status: Complete | Permit id: E200810032011 | |||||
Electrical demo inspection only - 1 pacific ave 2nd flr. Cbf job#32445. With #ew20090824783. Permit status: Complete | Permit id: Ew20090828481 | |||||
Tenant safe off buildout ec1306 Permit status: Filed | Permit id: Ew201608099840 | |||||
Electrical demo inspection only - 1 pacific ave 2nd flr. Cbf job#32445. With #ew20090824783. Permit status: Complete | Permit id: Ew20090828481 | |||||
Corridor upgrade (9)lights (2)switches (2)receptacles Permit status: Complete | Permit id: Ew20101030841 | |||||
Change two lights and change the outlets to g. F. I. Outlets for the kitchen. (unit no 24) Permit status: Complete | Permit id: E200512213671 | |||||
2 lights 8 switches receptacles. Life safety - 5 strobes 5 speakers. Permit status: Complete | Permit id: E20080903794 | |||||
Kitchen & bathroom remodel 18 lights switches 14 receptacles 8 circuits Permit status: Complete | Permit id: E200407265589 | |||||
2nd floor: 1 receptacles; installation of electrical components of a modular partition system. Permit status: Complete | Permit id: E200810032011 | |||||
Goldman fund (92)lights (25)switches (44)receptacles (42)circuits new speaker strobes Permit status: Complete | Permit id: Ew20101025381 | |||||
2 lights 6 swithches 4 receptacles partners for growth Permit status: Complete | Permit id: E20041202693 | |||||
Restroom upgrade - job #32621 Permit status: Complete | Permit id: Ew20101029623 | |||||
Install modular electrical into modular office partitions. Small reconfigure not original installation. Permit status: Complete | Permit id: Ew20130221941 | |||||
Electrical demo inspection only - 1 pacific ave. 2nd floor. # Permit status: Complete | Permit id: Ew20090824783 | |||||
2nd floor: installing cubical whips to existing electrical elastra 1 pacifc. Sf.; (13) basefeeds cubical whips floor monuments Permit status: Complete | Permit id: E200809221472 | |||||
Install 99 cat 5 cables terminate test Permit status: Complete | Permit id: E201411074238 | |||||
3 lights and 6 plugs- job #33980 Permit status: Complete | Permit id: Ew20141209501 | |||||
The goldman foundation 2nd floor - tenant build-out - job 33270 Permit status: Complete | Permit id: Ew20130103942 | |||||
Remodeling of existing space providing new furniture feeds and light fixtures with switching. Scope of work includes extending life safety system. Permit status: Complete | Permit id: Ew20140630061 | |||||
Install category 6 data voicecable for 2nd floor relocation to workstations office locations. Permit status: Complete | Permit id: E201401086447 | |||||
Lights 13 switches 108 receptacles 42 circuits. 1-225 amp panel & transformer. Phoenix editorial. Permit status: Complete | Permit id: E200502233541 | |||||
Restroom remodel- new light and ceiling sensor Permit status: Complete | Permit id: Ew20110920493 | |||||
Remodel unit # 2 5 lights 3 switches receptacles 2 circuits 1 fan Permit status: Complete | Permit id: E200308292216 | |||||
Golden gateway commons plaza level. 15 lights switches 16 receptacles circuits. Permit status: Complete | Permit id: E200505025978 | |||||
T i lights plugs switches Permit status: Complete | Permit id: Ew20110803563 | |||||
Tel data - t22685 - 2nd floor goldman Permit status: Complete | Permit id: Ew20130117821 | |||||
Elec and tel data work - jobs 33384 & t333 - 2nd floor keyser marston Permit status: Complete | Permit id: Ew20130322281 | |||||
Installation of 169 modular workstation Permit status: Complete | Permit id: Ew20141218681 | |||||
Permit fee to reopen existing permit #ew20140630061 that was closed by accident Permit status: Complete | Permit id: Ew20150810181 | |||||
Installation of 69 modular workstations Permit status: Complete | Permit id: Ew20140114221 | |||||
Unit #2 2nd floor: 8 lights 2 switches 8 receptacles; upgrade electrical in kitchen adn master bath Permit status: Complete | Permit id: E20090616367 | |||||
Modular office furniture: workstations Permit status: Complete | Permit id: Ew20101222061 | |||||
T i lights plugs switches Permit status: Complete | Permit id: Ew20110421821 | |||||
8 lights 2 switches 7 receptacles 2 circuits. Tenant: bay city. Permit status: Complete | Permit id: E200809091032 | |||||
Tenant safe off buildout ec1306 Permit status: Filed | Permit id: Ew201608099840 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 23, 1996 | Permit id: 10541 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 28, 1997 | Permit id: 11071 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 10, 1998 | Permit id: 11756 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: January 20, 1999 | Permit id: 12463 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 11, 2000 | Permit id: 13259 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: February 1, 2001 | Permit id: 14200 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: January 8, 2002 | Permit id: 16829 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: January 6, 2003 | Permit id: 19549 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: December 15, 2004 | Permit id: 26699 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: December 27, 2005 | Permit id: 30880 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: January 7, 2007 | Permit id: 35141 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: May 20, 2008 | Permit id: 40612 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: April 2, 2009 | Permit id: 44889 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: April 22, 2010 | Permit id: 49675 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: March 31, 2011 | Permit id: 55855 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: May 23, 2012 | Permit id: 62009 | |||||
Permit to operate boiler ![]() Permit status: Issued | Expiration date: April 16, 2013 | Permit id: 67139 | |||||
Revision to prev 200411169298 see sheet a-1. ![]() ![]() Permit type: Otc alterations permit | Completion date: January 5, 2005 | Expiration date: November 30, 2004 | Current use: Office | Permit id: 200411300312 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: December 29, 2004 | Permit id: M30642 | |||||
Demo of interior partitions,ceiling grid & finishes. Area to remain unoccupied per sfab 017 ![]() ![]() Permit type: Otc alterations permit | Expiration date: February 4, 2005 | Current use: Office | Permit id: 200502044838 | |||||
Interior alt to existing space (minor) demo & const. Of non structural partitions, ceilings & finish ![]() ![]() Permit type: Otc alterations permit | Completion date: June 29, 2005 | Expiration date: February 8, 2005 | Current use: Office | Permit id: 200502085063 | |||||
Mechanical & sprinklers @ 1st floor only. ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 29, 2005 | Expiration date: March 10, 2005 | Current use: Office | Permit id: 200503107253 | |||||
Replace kitchen cabinets, appliances, lights, with new, no structural work ![]() ![]() Permit type: Otc alterations permit | Completion date: November 30, 2005 | Expiration date: May 2, 2005 | Current use: Apartments | Permit id: 200505021282 | |||||
(e)kitchen & bathroom replacement. No structural work,provide fluorcesant light fixture. ![]() ![]() Permit type: Otc alterations permit | Completion date: March 29, 2006 | Expiration date: August 22, 2005 | Current use: Apartments | Permit id: 200508220832 | |||||
Add shower area in gr fl parking garage bldg 3. Work includes new walls, doors, frame. Finishes, plumbing, elec. No structural work ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 5, 2016 | Current use: Office | Permit id: 201612054140 | |||||
Install 16 of bookcases in library den in apt. #31 ![]() ![]() Permit type: Otc alterations permit | Completion date: January 20, 1989 | Expiration date: July 14, 1988 | Current use: Office | Permit id: 8809714 | |||||
Reroofing ![]() ![]() Permit type: Otc alterations permit | Completion date: March 15, 1996 | Expiration date: August 17, 1995 | Current use: Apartments | Permit id: 9513189 | |||||
Infill hall foyer on 2nd level type 5 detached bldg on top ![]() ![]() Permit type: Otc alterations permit | Completion date: May 29, 1996 | Expiration date: January 30, 1996 | Current use: Apartments | Permit id: 9601503 | |||||
Change glass sliding door to window at breakfast room ![]() ![]() Permit type: Otc alterations permit | Completion date: November 6, 1996 | Expiration date: May 22, 1996 | Current use: Apartments | Permit id: 9608925 | |||||
Repairs to build in planters, structural slab membrane ![]() ![]() Permit type: Otc alterations permit | Expiration date: July 15, 1996 | Current use: Apartments | Permit id: 9612689 | |||||
Fill in 67. 5sf anove the entry ![]() ![]() Permit type: Otc alterations permit | Completion date: January 14, 1997 | Expiration date: November 13, 1996 | Current use: 1 family dwelling | Permit id: 9622094 | |||||
Install new kitchen cabinets,new tile @ master bath shower ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 7, 1997 | Current use: Apartments | Permit id: 9704183 | |||||
Oti 3 ground floor, sp only ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 29, 2000 | Expiration date: January 7, 2000 | Current use: Office | Permit id: 20000107466 | |||||
Cti 1 2nd flr el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: August 2, 1994 | Current use: Office | Permit id: 9412224 | |||||
Cti-1 2nd flr ![]() ![]() Permit type: Otc alterations permit | Completion date: May 8, 1995 | Expiration date: August 29, 1994 | Current use: Office | Permit id: 9413807 | |||||
Cti 1 2nd fl el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: January 31, 1995 | Current use: Office | Permit id: 9501269 | |||||
Cti 2 2nd fl el me ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: January 31, 1995 | Current use: Office | Permit id: 9501270 | |||||
Cto-1 1st fl el sp (1 pacific ave mall ground) ![]() ![]() Permit type: Additions alterations or repairs | Completion date: April 11, 1995 | Expiration date: February 16, 1995 | Current use: Office | Permit id: 9502257 | |||||
Cti-1 1st fl no cti-2 (1 pacific avenue mall ground) ![]() ![]() Permit type: Additions alterations or repairs | Completion date: April 11, 1995 | Expiration date: February 16, 1995 | Current use: Office | Permit id: 9502258 | |||||
Cti-2 1 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: April 11, 1995 | Expiration date: March 3, 1995 | Current use: Office | Permit id: 9503087 | |||||
Cti 3 2nd flr sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: April 3, 1995 | Current use: Office | Permit id: 9504692 | |||||
Cti-1 floor 1st el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 6, 1995 | Expiration date: April 6, 1995 | Current use: Office | Permit id: 9504924 | |||||
Cti-1 floor 2nd el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: April 21, 1995 | Current use: Office | Permit id: 9505796 | |||||
Cti-2 floor 2nd el me sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 3, 1995 | Expiration date: April 21, 1995 | Current use: Office | Permit id: 9505797 | |||||
Cti-1 1stfl,el ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: April 26, 1995 | Current use: Office | Permit id: 9506035 | |||||
Cti-2 1stfl,el,me ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: May 1, 1995 | Current use: Office | Permit id: 9506266 | |||||
Cti ii g flr el me sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: May 5, 1995 | Current use: Office | Permit id: 9506590 | |||||
Cti-1 g f none ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: May 29, 1997 | Current use: Office | Permit id: 9709708 | |||||
Cti 1 first floor (el me sp) ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: June 13, 1997 | Current use: Office | Permit id: 9710813 | |||||
Cti-1 1st floor revision to app #9710813 ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: July 3, 1997 | Current use: Office | Permit id: 9712344 | |||||
Cti-2 1st floor el me sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: July 3, 1997 | Current use: Office | Permit id: 9712347 | |||||
Cti-1 2nd floor no cti-2 ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: July 14, 1997 | Current use: Office | Permit id: 9712962 | |||||
Revision to appl #9710813, fully compliant restroom stalls ![]() ![]() Permit type: Otc alterations permit | Expiration date: July 25, 1997 | Current use: Office | Permit id: 9713933 | |||||
Cti 1-1st floor no cti 2 ![]() ![]() Permit type: Additions alterations or repairs | Completion date: May 12, 1998 | Expiration date: November 20, 1997 | Current use: Office | Permit id: 9723455 | |||||
Cti-1 2 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: November 21, 1997 | Current use: Office | Permit id: 9723582 | |||||
Oti-2 1 f el me sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: March 5, 1998 | Current use: Office | Permit id: 9803709 | |||||
Oti-2 el me sp 2 f ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: March 5, 1998 | Current use: Office | Permit id: 9803710 | |||||
Revision to app #9723455 ![]() ![]() Permit type: Otc alterations permit | Completion date: May 12, 1998 | Expiration date: May 5, 1998 | Current use: Office | Permit id: 9808006 | |||||
Barrier removal work to restrms on 2nd flr of bldg ![]() ![]() Permit type: Otc alterations permit | Completion date: May 11, 1999 | Expiration date: November 9, 1998 | Current use: Office | Permit id: 9822977 | |||||
Ot-1-i tenant space alterations ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 4, 1999 | Expiration date: January 19, 1999 | Current use: Office | Permit id: 9901063 | |||||
Oti-3 2nd fl sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 4, 1999 | Expiration date: April 6, 1999 | Current use: Office | Permit id: 9906536 | |||||
Cti-1 el sp ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: July 29, 1993 | Current use: Office | Permit id: 9312827 | |||||
Renew appln #9312827 ![]() ![]() Permit type: Otc alterations permit | Expiration date: April 20, 1998 | Current use: Office | Permit id: 9806839 | |||||
Oti 1 ground floor, el, me & sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: June 29, 2000 | Expiration date: December 6, 1999 | Current use: Office | Permit id: 9925654 | |||||
Office space ![]() ![]() Permit type: Additions alterations or repairs | Completion date: November 18, 1983 | Expiration date: August 22, 1983 | Current use: Office | Permit id: 8308215 | |||||
Barrier removal work to restrms on 1st fl of bldng, lighting, mech & fire under sep permit ![]() ![]() Permit type: Otc alterations permit | Completion date: October 23, 2001 | Expiration date: April 9, 2001 | Current use: Office | Permit id: 200104096326 | |||||
Remodel ceilings, for our walls, replace ceilings ![]() ![]() Permit type: Additions alterations or repairs | Completion date: September 5, 2001 | Expiration date: May 15, 2001 | Current use: Retail sales | Permit id: 200105159247 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: May 24, 2001 | Permit id: M16275 | |||||
Oti-1, 1st flr, el,me,sp ![]() ![]() Permit type: Additions alterations or repairs | Completion date: October 23, 2001 | Expiration date: June 5, 2001 | Current use: Office | Permit id: 200106050735 | |||||
Pulling out kitchen cabinets & replacing w new ![]() ![]() Permit type: Otc alterations permit | Completion date: April 8, 2002 | Expiration date: December 7, 2001 | Current use: Apartments | Permit id: 200112074827 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: January 7, 2002 | Permit id: M18431 | |||||
Streetspace ![]() Permit type: Otc alterations permit | Expiration date: August 27, 2002 | Permit id: M21579 | |||||
Install handrails & striping at (e) exterior stairs, install railing for visually impaired persons ![]() ![]() Permit type: Additions alterations or repairs | Completion date: April 11, 2003 | Expiration date: December 24, 2002 | Current use: Office | Permit id: 200212244145 | |||||
Interior doorway revisionms, built in cabinets, trim, floor covering, electrical, plumbing ![]() ![]() Permit type: Otc alterations permit | Completion date: November 25, 2003 | Expiration date: August 22, 2003 | Current use: Apartments | Permit id: 200308222866 | |||||
Address assignment ![]() Permit type: Otc alterations permit | Expiration date: December 4, 2003 | Permit id: M25754 | |||||
Remove partitions and half height partition, relocate light fixtures, outlet hvac register & other r ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 8, 2003 | Current use: Office | Permit id: 200312081860 | |||||
Tapping for loose brick veneer & replace on the street sides of the bldng. ![]() ![]() Permit type: Otc alterations permit | Expiration date: April 14, 2004 | Current use: Apartments | Permit id: 200404141271 | |||||
Remodel unit 12 kitchen&bath. R r cabinets,appliance. Install plumb fix. Repl light,drywall,floorin ![]() ![]() Permit type: Otc alterations permit | Completion date: March 1, 2005 | Expiration date: June 11, 2004 | Current use: Apartments | Permit id: 200406116260 | |||||
Minor alterations to (e) tenant space ![]() ![]() Permit type: Otc alterations permit | Expiration date: July 13, 2004 | Current use: Office | Permit id: 200407138702 | |||||
House number permit ![]() Permit type: Otc alterations permit | Expiration date: November 13, 2004 | Permit id: M30179 | |||||
Demolition & construction of non-structural partitions & finishes,relocate light fixtures,no increas ![]() ![]() Permit type: Otc alterations permit | Completion date: January 5, 2005 | Expiration date: November 16, 2004 | Current use: Office | Permit id: 200411169298 | |||||
1st flr suite 3008: commerical ti for office space about 19 sq ft - new partitions, finishes, casework, electrical & plumbing. 1 hr corridor with min door. Mech elec, fire under separate permit. Maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: October 25, 2017 | Expiration date: March 10, 2017 | Current use: Office | Permit id: 201703101189 | |||||
Suite 3008 - demo (e) branch lines & (e) sr uprights due to new wall & ceiling layout. Install (n) branch lines & (n) qr upright & pendent sprinklers due to new wall & ceiling layout. Ref pa #201703101189. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 19, 2017 | Expiration date: June 1, 2017 | Current use: Office | Permit id: 201706018078 | |||||
Suite #3008: provide new lighting & branch circuits to existing panel. Maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power and signal outlets. Provide t-24 compliance forms. Ref. Arch #201703101189. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 25, 2017 | Expiration date: June 21, 2017 | Current use: Office | Permit id: 201706219912 | |||||
Fire alarm work for the "suite 3008" remodel on floor 1; additions are 5 speaker strobes. Ref pa 2017-0310-1189. Maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: October 25, 2017 | Expiration date: June 23, 2017 | Current use: Office | Permit id: 201706230160 | |||||
Demo existing walls, door, carpet on 1st floor (per ab-17), tenant improvement under separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: May 16, 2008 | Expiration date: April 23, 2008 | Current use: Office | Permit id: 200804230436 | |||||
2nd floor-tenant improvements to include minor demolition, new walls and upgrades to meet ada requirements. Mep, fire safety & sprinkler under seperate permit. No increase in office space. Interior work only. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 3, 2009 | Expiration date: August 12, 2008 | Current use: Office | Permit id: 200808128997 | |||||
1st floor-interior improvements on the 1st floor including the addition of partial height walls. M. E. P and life safety unders seperate permit ![]() ![]() Permit type: Otc alterations permit | Completion date: September 29, 2008 | Expiration date: August 19, 2008 | Current use: Office | Permit id: 200808199550 | |||||
2nd floor revision to appl #200808128997 to remove automatic door opener o stall door in disabled access bathroom. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 3, 2009 | Expiration date: September 4, 2008 | Current use: Office | Permit id: 200809040749 | |||||
2nd floor-addition of new fire alarm devices to (e) fire alarm panel. 3 smoke detectors, 1 control module, 1 power supply, 7 strobes, 14 speaker strobes ![]() ![]() Permit type: Otc alterations permit | Completion date: February 3, 2009 | Expiration date: September 10, 2008 | Current use: Office | Permit id: 200809101234 | |||||
Fire alarm life safety installation of 2 speaker strobes on 1st floor. ![]() ![]() Permit type: Otc alterations permit | Expiration date: September 25, 2008 | Current use: Office | Permit id: 200809252653 | |||||
2nd floor-as built revision to pa# 2008-0910-1234-added to scope: 4 speaker strobes, 1 smoke detector ![]() ![]() Permit type: Otc alterations permit | Completion date: February 3, 2009 | Expiration date: September 29, 2008 | Current use: Office | Permit id: 200809292914 | |||||
Street space permit only. ![]() Permit type: Otc alterations permit | Expiration date: April 23, 2009 | Permit id: M162004 | |||||
Work @ unit# 2 only. Replace kitchen cabinets. Replace tub in master bath. Replace tiles in master bath. Min 50% of kitchen light wattage shall be of fluorescent. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 27, 2009 | Expiration date: June 16, 2009 | Current use: Apartments | Permit id: 200906160512 | |||||
Street space permit. ![]() Permit type: Otc alterations permit | Expiration date: July 2, 2009 | Permit id: M170965 | |||||
Pre-construction demolition under ab017. Demo interior partitions only. Fire sprinklers & life safety to remain operational. No fire rated construction to be removed. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: August 7, 2009 | Current use: Office | Permit id: 200908074348 | |||||
Unit #15-interior remodeling-relocate coat closet in the foyer, expand kitchen, new cabinets, appliances & new configuration. Patch & repair adjacent surfaces, paint, refinish floors. No structural work- sprinklers separate permit. ![]() ![]() Permit type: Otc alterations permit | Expiration date: March 8, 2010 | Current use: Apartments | Permit id: 201003087745 | |||||
2nd floor-demo of non structural partitions, build back of non structural partitions. All new or revised hvac, electrical, plumbing, sprinkler & life safety will be design build & submitted under seperate permit. Building is fully sprinklered ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: September 16, 2010 | Current use: Office | Permit id: 201009160999 | |||||
Creation of common corridor on 2nd floor. New ada compliant stair hand and guard rails ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: September 20, 2010 | Current use: Office | Permit id: 201009201178 | |||||
Addition of 2 smoke detectors,12 speakers strobes,3 strobes, & a strobe power supply for the goldman fund tenant remodel on floor 2. All new devices connect onto the extg fire alarm system. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: October 1, 2010 | Current use: Office | Permit id: 201010012040 | |||||
Mechanical & electrical work associated with approved permit #201009160999 ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: October 6, 2010 | Current use: Office | Permit id: 201010062425 | |||||
Remodel existing restrooms to comply with ada new finishes in 2nd fl office ![]() ![]() Permit type: Otc alterations permit | Completion date: March 4, 2011 | Expiration date: October 8, 2010 | Current use: Office | Permit id: 201010082595 | |||||
2nd floor - 95 removed sprinklers, 84 added sprinklers ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: October 19, 2010 | Current use: Office | Permit id: 201010193342 | |||||
2nd floor-tenant improvements to (e) fire sprinkler system-14 removed sprinklers & 11 new pendent sprinklers ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: October 26, 2010 | Current use: Office | Permit id: 201010263746 | |||||
Floor 2nd - addition of 6 speaker strobes for the "corridor" remodel. All new devices connect onto the existing fire alarm system. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 8, 2011 | Expiration date: December 1, 2010 | Current use: Office | Permit id: 201012015841 | |||||
Grnd flr: remodel of extg restrooms, including finishes, and fixtures to meet ada code compliance. ![]() ![]() Permit type: Otc alterations permit | Expiration date: April 7, 2011 | Current use: Office | Permit id: 201104073652 | |||||
Interior tenant improvement: combine 2(e) office suites demolition & construction of non-structural partitions, ceilings & finishes. Mep work required due to project scope shall be under separate permit. Sprinkler work under separate permit (no change in occupancy). ![]() ![]() Permit type: Otc alterations permit | Completion date: May 23, 2011 | Expiration date: April 14, 2011 | Current use: Office | Permit id: 201104144051 | |||||
Tenant improvements existing fire sprinkler system removed. 2 added, 4 relocates ![]() ![]() Permit type: Otc alterations permit | Completion date: August 26, 2011 | Expiration date: May 11, 2011 | Current use: Office | Permit id: 201105115785 | |||||
Partial floor tenant impr. For single tenant including selective demoltion, new partitions, new ceiling, finishes. Sprink,life safty, mech, lighting under seperate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 12, 2011 | Expiration date: July 6, 2011 | Current use: Office | Permit id: 201107069565 | |||||
1st floor - fire sprinkler system upgrade. Relocate 19 pendents sprinkler heads. ![]() ![]() Permit type: Otc alterations permit | Completion date: October 20, 2011 | Expiration date: August 22, 2011 | Current use: Office | Permit id: 201108222944 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: September 27, 2011 | Permit id: M281487 | |||||
16th floor. T. I includes building new 2 door set of doors. Revised electrical and life safety work will be design build and submitted for permit separately. Bldg is fully sprinkled. ![]() ![]() Permit type: Otc alterations permit | Completion date: March 4, 2013 | Expiration date: December 11, 2012 | Current use: Office | Permit id: 201212115906 | |||||
Mechanical only for app#201212115906 ![]() ![]() Permit type: Otc alterations permit | Expiration date: January 15, 2013 | Current use: Office | Permit id: 201301158052 | |||||
Fire sprinkler system upgrade; relocate 8 pendent sprinkler on the 2nd floors. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 19, 2013 | Expiration date: February 12, 2013 | Current use: Office | Permit id: 201302120040 | |||||
2nd floor: t. I. Include bldg new non structural partition and new break room millwork. All new or revised hvac, electrical, plumbing, & life safety work will be designed build & submitted seperately. Bldg fully sprinklered. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 18, 2013 | Expiration date: March 20, 2013 | Current use: Office | Permit id: 201303202624 | |||||
Bldg c- demolition and construction of interior non-load bearing partition, doors and finsihes. Mep, life safety and fire sprinkler under seperate permit. ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 11, 2013 | Current use: Office | Permit id: 201312113892 | |||||
Addition of 4 speaker strobes for the esurance remodel on floor 2. All new devices connect onto fire alarm system ![]() ![]() Permit type: Otc alterations permit | Completion date: January 15, 2014 | Expiration date: January 6, 2014 | Current use: Office | Permit id: 201401065566 | |||||
T. I. On 2nd floor. Work include construcito of non-load bearing partitions, doors and finishes. Mep under separate permit. Maher n a. ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 11, 2014 | Current use: Office | Permit id: 201406118090 | |||||
New ductwork, air outlets, thermostats for tenant improvement. Reuse existing heat pumps. Provide new supplemental cooling units. New fsd and 16 new dsds. Ref #201406118090. Compliance with ord 155-13 not required ![]() ![]() Permit type: Otc alterations permit | Completion date: February 19, 2015 | Expiration date: September 11, 2014 | Current use: Office | Permit id: 201409116093 | |||||
Bldg 3, 1st flr: tenant improvements, new lighting, new elec tele data, new finishes; maher n a. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 16, 2015 | Expiration date: October 10, 2014 | Current use: Office | Permit id: 201410108595 | |||||
2nd flr: relocate 57 pendants ti 201406118090; maher n a ![]() ![]() Permit type: Otc alterations permit | Completion date: October 5, 2015 | Expiration date: October 21, 2014 | Current use: Office | Permit id: 201410219481 | |||||
2nd floor: fire alarm work for esurance t. I. Additions are 1 smoke detector, 4 duct detectors, 5 modules, 2 strobe power supplies, 15 speakers, 48 speaker strobes, and 6 strobes. Ref app#201406118090. Mechanical 2014. 0911. 6093 n a for the maher. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 13, 2015 | Expiration date: December 5, 2014 | Current use: Office | Permit id: 201412053087 | |||||
Revision to pa#2014-06-11-80 to request equivalent facilitation addition to two single occupant accessible restrooms. ![]() ![]() Permit type: Otc alterations permit | Expiration date: December 17, 2014 | Current use: Office | Permit id: 201412173922 | |||||
As built for 201409116093, new locations for dsds. Indentification of parking garage, closed, location of fsd for bathroom exhaust, identificaion of existing heat pumps. Maher not req ![]() ![]() Permit type: Otc alterations permit | Completion date: February 19, 2015 | Expiration date: January 16, 2015 | Current use: Office | Permit id: 201501165979 | |||||
1st floor: title 24 electrical for work done under appl. #2014. 1010. 8595. Maher n a. ![]() ![]() Permit type: Otc alterations permit | Completion date: June 16, 2015 | Expiration date: May 20, 2015 | Current use: Office | Permit id: 201505206819 | |||||
Revision to pa 2014 0611 8090: (e) breakroom to remain the same. Remove (e) suite entry door construction of non load bearing partitions, door & finishes maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: October 2, 2015 | Expiration date: August 10, 2015 | Current use: Office | Permit id: 201508103734 | |||||
Suite #3015 - commercial tenant improvement work includes new partitions, finishes, casework, electrical & plumbing. This is not a medicla office space. N a maher ordinance ![]() ![]() Permit type: Otc alterations permit | Completion date: September 9, 2016 | Expiration date: June 9, 2016 | Current use: Office | Permit id: 201606099520 | |||||
Revision to pa 2016-0609-95 - addition of structural detail for a suspended soffit. Maher na ![]() ![]() Permit type: Otc alterations permit | Completion date: September 9, 2016 | Expiration date: August 12, 2016 | Current use: Office | Permit id: 201608124869 | |||||
Suite 2003, relocate 19 fire sprinklers and plug 11 outlets to conform with new wall ceiling layout. Reference 2016. 0610. 9650 ![]() ![]() Permit type: Otc alterations permit | Completion date: October 3, 2016 | Expiration date: August 29, 2016 | Current use: Office | Permit id: 201608296195 | |||||
Provided new lighting & branch circuiting to existing panel. Maintained some of the (e) power and signal outlets and provided additional new power branch circuiting and raceway systems as req to new power and signal outlets; provided title 24 compliance forms. Ref pa 2016-0609-9520 ![]() ![]() Permit type: Otc alterations permit | Completion date: September 9, 2016 | Expiration date: August 30, 2016 | Current use: Office | Permit id: 201608306326 | |||||
1st floor: revision to ref pa 2016060995 expansion at break room area ![]() ![]() Permit type: Otc alterations permit | Completion date: September 9, 2016 | Expiration date: August 31, 2016 | Current use: Office | Permit id: 201608316446 | |||||
2nd floor: installing cubical whips to existing electrical elastra, 1 pacifc. Sf.; (13) basefeeds cubical whips, floor monuments ![]() Permit status: Complete | Completion date: October 23, 2008 | Permit id: E200809221472 | |||||
Install modular electrical into modular office partitions. Small reconfigure, not original installation. ![]() Permit status: Complete | Completion date: October 9, 2013 | Permit id: Ew20130221941 | |||||
8 lights, 2 switches, 7 receptacles, 2 circuits. Tenant: bay city. ![]() Permit status: Complete | Completion date: September 26, 2008 | Permit id: E200809091032 | |||||
Electrical demo inspection only - 1 pacific ave., 2nd floor. # ![]() Permit status: Complete | Completion date: August 28, 2009 | Permit id: Ew20090824783 | |||||
Install 99 cat 5 cables, terminate, test ![]() Permit status: Complete | Completion date: February 5, 2015 | Permit id: E201411074238 | |||||
Remodeling of existing space, providing new furniture feeds and light fixtures with switching. Scope of work includes extending life safety system. ![]() Permit status: Complete | Completion date: February 20, 2015 | Permit id: Ew20140630061 | |||||
T i lights, plugs, switches ![]() Permit status: Complete | Completion date: October 6, 2011 | Permit id: Ew20110803563 | |||||
Tel data - t22685 - 2nd floor goldman ![]() Permit status: Complete | Completion date: November 21, 2013 | Permit id: Ew20130117821 | |||||
The goldman foundation 2nd floor - tenant build-out - job 33270 ![]() Permit status: Complete | Completion date: February 20, 2013 | Permit id: Ew20130103942 | |||||
Electrical demo inspection only - 1 pacific ave, 2nd flr. Cbf job#32445. With #ew20090824783. ![]() Permit status: Complete | Completion date: October 8, 2009 | Permit id: Ew20090828481 | |||||
Kitchen & bathroom remodel,18 lights, switches, 14 receptacles, 8 circuits ![]() Permit status: Complete | Completion date: March 11, 2005 | Permit id: E200407265589 | |||||
Remodel unit # 2, 5 lights, 3 switches, receptacles, 2 circuits, 1 fan ![]() Permit status: Complete | Completion date: November 21, 2003 | Permit id: E200308292216 | |||||
Restroom upgrade - job #32621 ![]() Permit status: Complete | Completion date: February 15, 2011 | Permit id: Ew20101029623 | |||||
Installation of 169 modular workstation ![]() Permit status: Complete | Completion date: February 5, 2015 | Permit id: Ew20141218681 | |||||
2 lights, 8 switches, receptacles. Life safety - 5 strobes, 5 speakers. ![]() Permit status: Complete | Completion date: October 23, 2008 | Permit id: E20080903794 | |||||
Install category 6 data voicecable for 2nd floor relocation to workstations office locations. ![]() Permit status: Complete | Completion date: February 11, 2014 | Permit id: E201401086447 | |||||
Golden gateway commons plaza level. 15 lights, switches, 16 receptacles, circuits. ![]() Permit status: Complete | Completion date: November 28, 2005 | Permit id: E200505025978 | |||||
Restroom remodel- new light and ceiling sensor ![]() Permit status: Complete | Completion date: November 2, 2011 | Permit id: Ew20110920493 | |||||
Ec1565. Furnish and install new electrical ![]() Permit status: Complete | Completion date: October 25, 2017 | Permit id: Ew201706025809 | |||||
3 lights and 6 plugs- job #33980 ![]() Permit status: Complete | Completion date: June 16, 2015 | Permit id: Ew20141209501 | |||||
Lights, 13 switches, 108 receptacles, 42 circuits. 1-225 amp panel & transformer. Phoenix editorial. ![]() Permit status: Complete | Completion date: June 28, 2005 | Permit id: E200502233541 | |||||
2 lights, 6 swithches, 4 receptacles, partners for growth ![]() Permit status: Complete | Completion date: January 3, 2005 | Permit id: E20041202693 | |||||
Permit fee to reopen existing permit #ew20140630061 that was closed by accident ![]() Permit status: Complete | Completion date: September 30, 2015 | Permit id: Ew20150810181 | |||||
Corridor upgrade (9)lights (2)switches (2)receptacles ![]() Permit status: Complete | Completion date: December 22, 2010 | Permit id: Ew20101030841 | |||||
Goldman fund (92)lights (25)switches (44)receptacles (42)circuits new speaker strobes ![]() Permit status: Complete | Completion date: May 4, 2012 | Permit id: Ew20101025381 | |||||
2nd floor: 1 receptacles; installation of electrical components of a modular partition system. ![]() Permit status: Complete | Completion date: October 21, 2008 | Permit id: E200810032011 | |||||
Installation of 69 modular workstations ![]() Permit status: Complete | Completion date: February 12, 2014 | Permit id: Ew20140114221 | |||||
Modular office furniture: workstations ![]() Permit status: Complete | Completion date: May 4, 2012 | Permit id: Ew20101222061 | |||||
Change two lights and change the outlets to g. F. I. Outlets for the kitchen. (unit no 24) ![]() Permit status: Complete | Completion date: January 4, 2006 | Permit id: E200512213671 | |||||
Elec and tel data work - jobs 33384 & t333 - 2nd floor keyser marston ![]() Permit status: Complete | Completion date: March 26, 2013 | Permit id: Ew20130322281 | |||||
Tenant safe off buildout ec1306 ![]() Permit status: Complete | Completion date: September 9, 2016 | Permit id: Ew201608099840 | |||||
Unit #2, 2nd floor: 8 lights, 2 switches, 8 receptacles; upgrade electrical in kitchen adn master bath ![]() Permit status: Complete | Completion date: September 21, 2009 | Permit id: E20090616367 | |||||
Work category: 5p; provide rough and finish plumbing for tenant sinks, shower rooms and restrooms, 2nd floor. Ar&b job number 14-159 ![]() Permit status: Complete | Completion date: January 27, 2015 | Expiration date: October 10, 2014 | Permit id: Pw20141010894 | |||||
Work category: 4pb; provide fire sprinkler tenent improvement at 2nd floor goldman fund space ar&b # 10-146 ![]() Permit status: Complete | Completion date: November 23, 2010 | Expiration date: November 18, 2010 | Permit id: Pw20101118666 | |||||
Work category: 5p; installing a tiled shower pan. ![]() Permit status: Complete | Completion date: February 17, 2015 | Expiration date: February 10, 2015 | Permit id: Pw20150210907 | |||||
Work category: 5p; provide rough and finish plumbing for tenant sink and condensate, 2nd floor. Ar&b job # 10-146 ![]() Permit status: Complete | Completion date: December 21, 2010 | Expiration date: October 27, 2010 | Permit id: Pw20101027276 | |||||
Work category: 5p; new tenant sink in suite 204 ![]() Permit status: Expired | Expiration date: March 18, 2013 | Permit id: Pw20130318390 | |||||
Work category: 4pb; relocate sprinklers on the 2nd floor ggfp# 12-339 ![]() Permit status: Complete | Completion date: February 13, 2013 | Expiration date: February 8, 2013 | Permit id: Pw20130208586 | |||||
Work category: 5p; rough in and trim break room sink and faucet. Job #16-101 ![]() Permit status: Complete | Completion date: September 14, 2016 | Expiration date: July 26, 2016 | Permit id: Pw20160726295 | |||||
Unit # 2, 2nd floor: (1) replace kitchen sink and appliances (2) replace bath tub and faucets ![]() Permit status: Complete | Completion date: September 16, 2009 | Expiration date: June 16, 2009 | Permit id: Pp20090616039 | |||||
Work category: 5p; remodel 2 mens and womens restrooms ![]() Permit status: Expired | Expiration date: June 22, 2011 | Permit id: Pw20110622146 | |||||
Work category: 5p; restroom remodel ![]() Permit status: Expired | Expiration date: September 22, 2011 | Permit id: Pw20110922736 | |||||
Work category: 4pb; esurance - relocated 57 pendents ![]() Permit status: Complete | Completion date: December 11, 2014 | Expiration date: October 21, 2014 | Permit id: Pw20141021201 | |||||
Unit 44: repair furnance flue ![]() Permit status: Complete | Completion date: January 16, 2009 | Expiration date: January 14, 2009 | Permit id: Pm20090114399 | |||||
Install new kitchen skin, urinals & lavatories. (2nd floor) ![]() Permit status: Complete | Completion date: September 25, 2008 | Expiration date: September 11, 2008 | Permit id: Pp20080911589 | |||||
Work category: 4pb; provide fire sprinkler tenent improvement at 2nd floor corridor ar&b # 10-178 ![]() Permit status: Complete | Completion date: December 8, 2010 | Expiration date: December 6, 2010 | Permit id: Pw20101206881 | |||||
Demo (e) branch lines and (e) new sr upright sprinklers due to new wall and ceiling layout. Install new branch lines and (n) qr upright & pendant sprinkler due to new wall and ceiling layout. Demo = heads, install = 17 heads ![]() Permit status: Complete | Completion date: July 10, 2017 | Expiration date: June 1, 2017 | Permit id: Pp20170601823 | |||||
Work category: 4pb; relocate 13 sprinkler heads for new 1st floor tenant phoenix editorial ![]() Permit status: Complete | Completion date: October 11, 2011 | Expiration date: August 23, 2011 | Permit id: Pw20110823225 | |||||
Work category: 4pb; provide fire sprinkler tenant improvement at 1st floor partners for growth space ar&b # 11-073 ![]() Permit status: Complete | Completion date: May 16, 2011 | Expiration date: May 12, 2011 | Permit id: Pw20110512486 | |||||
Work category: 5p; per tenant improvement: rough-in & trim break room sink.#17-030 ![]() Permit status: Complete | Completion date: June 30, 2017 | Expiration date: May 22, 2017 | Permit id: Pw20170522274 | |||||
Unit #2. Replace shower pan in master bath. ![]() Permit status: Issued | Expiration date: July 22, 2009 | Permit id: Pp20090722831 | |||||
New ductwork, air outlets & thermostats for ti; re-use existing heat pumps; provide new supplemental cooling units; 16 new dsds & new fsd ![]() Permit status: Expired | Expiration date: September 17, 2014 | Permit id: Pm20140917163 | |||||
Work category: 4pb; per tenant improvement: relocate 19 fire sprinklers and plug 11 outlets to conform to the new wall ceiling layout of the tenant improvement. 16-709 ![]() Permit status: Complete | Completion date: August 30, 2016 | Expiration date: August 26, 2016 | Permit id: Pw20160826075 | |||||
Work category: 1p; water heater replacement in unit #16 ![]() Permit status: Expired | Expiration date: June 29, 2009 | Permit id: Pw20090629370 | |||||
Work category: 2pa; install new dishwasher and new water closset. Install new sink and faucet. ![]() Permit status: Expired | Expiration date: March 22, 2010 | Permit id: Pw20100322307 | |||||
SCORE 100 1st flr suite 3008: commerical ti for office space about 19 sq ft - new partitions finishes casework electrical & plumbing. 1 hr corridor with min door. Mech elec fire under separate permit. Maher na Permit type: Building permit | Expiration date: April 5, 2018 | Current use: Office | Permit id: #201703101189 | |||||
SCORE 98 Revision to pa 2014 0611 8090: (e) breakroom to remain the same. Remove (e) suite entry door construction of non load bearing partitions door & finishes/ maher na Permit type: Building permit | Expiration date: December 10, 2015 | Current use: Office | Permit id: #201508103734 | |||||
SCORE 95 Tenant safe off/buildout ec1306 ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew201608099840 | |||||
SCORE 100 Work category: 4pb; per tenant improvement: relocate 19 fire sprinklers and plug 11 outlets to conform to the new wall / ceiling layout of the tenant improvement. 16-709 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160826075 | |||||
SCORE 100 Floor 2nd - addition of 6 speaker/strobes for the "corridor" remodel. All new devices connect onto the existing fire alarm system. Permit type: Building permit | Expiration date: April 2, 2011 | Current use: Office | Permit id: #201012015841 | |||||
SCORE 100 2nd floor: fire alarm work for esurance t. I. Additions are 1 smoke detector 4 duct detectors 5 modules 2 strobe power supplies 15 speakers 48 speaker/strobes and 6 strobes. Ref app#201406118090. Mechanical 2014. 0911. 6093 n/a for the maher. Permit type: Building permit | Expiration date: December 5, 2015 | Current use: Office | Permit id: #201412053087 | |||||
SCORE 100 Add shower area in gr fl parking garage bldg 3. Work includes new walls doors frame. Finishes plumbing elec. No structural work ![]() ![]() Permit type: Building permit | Current use: Office | Permit id: #201612054140 | |||||
SCORE 95 Tel/data - t22685 - 2nd floor goldman ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20130117821 | |||||
SCORE 79 Install category 6 data/voicecable for 2nd floor relocation to workstations/office locations. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201401086447 | |||||
SCORE 100 Addition of 4 speaker/strobes for the esurance remodel on floor 2. All new devices connect onto fire alarm system Permit type: Building permit | Expiration date: May 6, 2014 | Current use: Office | Permit id: #201401065566 | |||||
SCORE 98 T. I. On 2nd floor. Work include construcito of non-load bearing partitions doors and finishes. Mep under separate permit. Maher n/a. Permit type: Building permit | Expiration date: June 16, 2017 | Current use: Office | Permit id: #201406118090 | |||||
SCORE 100 Suite #3015 - commercial tenant improvement work includes new partitions finishes casework electrical & plumbing. This is not a medicla office space. N/a maher ordinance Permit type: Building permit | Expiration date: June 15, 2017 | Current use: Office | Permit id: #201606099520 | |||||
SCORE 100 Suite 3008 - demo (e) branch lines & (e) sr uprights due to new wall & ceiling layout. Install (n) branch lines & (n) qr upright & pendent sprinklers due to new wall & ceiling layout. Ref pa #201703101189. Permit type: Building permit | Expiration date: December 1, 2017 | Current use: Office | Permit id: #201706018078 | |||||
SCORE 100 Suite #3008: provide new lighting & branch circuits to existing panel. Maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as required to new power and signal outlets. Provide t-24 compliance forms. Ref. Arch #201703101189. Permit type: Building permit | Expiration date: June 21, 2018 | Current use: Office | Permit id: #201706219912 | |||||
SCORE 100 Fire alarm work for the "suite 3008" remodel on floor 1; additions are 5 speaker strobes. Ref pa 2017-0310-1189. Maher na Permit type: Building permit | Expiration date: October 26, 2017 | Current use: Office | Permit id: #201706230160 | |||||
SCORE 82 Demo (e) branch lines and (e) new sr upright sprinklers due to new wall and ceiling layout. Install new branch lines and (n) qr upright & pendant sprinkler due to new wall and ceiling layout. Demo = heads install = 17 heads ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20170601823 | |||||
SCORE 95 Elec and tel/data work - jobs 33384 & t333 - 2nd floor keyser marston ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: Ew20130322281 | |||||
SCORE 96 1st floor: title 24 electrical for work done under appl. #2014. 1010. 8595. Maher n/a. Permit type: Building permit | Expiration date: May 16, 2016 | Current use: Office | Permit id: #201505206819 | |||||
SCORE 100 Work category: 5p; per tenant improvement: rough-in & trim break room sink.#17-030 ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20170522274 | |||||
SCORE 100 Addition of 2 smoke detectors 12 speakers/strobes 3 strobes & a strobe power supply for the goldman fund tenant remodel on floor 2. All new devices connect onto the extg fire alarm system. Permit type: Building permit | Expiration date: April 5, 2011 | Current use: Office | Permit id: #201010012040 | |||||
SCORE 100 2nd flr: relocate 57 pendants/ ti 201406118090; maher n/a Permit type: Building permit | Expiration date: October 16, 2015 | Current use: Office | Permit id: #201410219481 | |||||
SCORE 92 3rd floor: residential condo ti - offset 8 of 25 head locations. Upgrade all 25 heads from semi-recessed to concealed. Mahr na Permit type: Building permit | Current use: Apartments | Permit id: #201510230653 | |||||
SCORE 86 #27: new kitchen and bath surfaces new lighting painting and flooring. New structural opening between kitchen and living room. Permit type: Building permit | Current use: Apartments | Permit id: #201506098446 | |||||
SCORE 100 Extensive remodel throughout. Includes relocated and upgraded load center and new lighting. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20151110081 | |||||
SCORE 100 Work category: 1p; two shower pan inspections ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160105044 | |||||
SCORE 100 Upgrading 25 fire sprinkler heads total and relocating 8 ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20151103270 | |||||
SCORE 89 Work category: 1m; install direct vent gas fireplace per manual specs; gas line work by others ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pmw20151120143 | |||||
SCORE 100 Work category: 2pa; 3 bathroom kitchen laundry remodel. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151020244 | |||||
Extensive remodel throughout. Includes relocated and upgraded load center and new lighting. Permit status: Filed | Permit id: Ew20151110081 | |||||
Extensive remodel throughout. Includes relocated and upgraded load center and new lighting. Permit status: Filed | Permit id: Ew20151110081 | |||||
#27: new kitchen and bath surfaces, new lighting, painting and flooring. New structural opening between kitchen and living room. ![]() ![]() Permit type: Otc alterations permit | Completion date: August 11, 2016 | Expiration date: June 9, 2015 | Current use: Apartments | Permit id: 201506098446 | |||||
3rd floor: residential condo ti - offset 8 of 25 head locations. Upgrade all 25 heads from semi-recessed to concealed. Mahr na ![]() ![]() Permit type: Otc alterations permit | Completion date: August 9, 2016 | Expiration date: October 23, 2015 | Current use: Apartments | Permit id: 201510230653 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: December 2, 2015 | Permit id: M642567 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: March 11, 2016 | Permit id: M671867 | |||||
Street space & mta ![]() Permit type: Otc alterations permit | Expiration date: April 12, 2016 | Permit id: M680830 | |||||
Extensive remodel throughout. Includes relocated and upgraded load center and new lighting. ![]() Permit status: Complete | Completion date: August 8, 2016 | Permit id: Ew20151110081 | |||||
Upgrading 25 fire sprinkler heads total, and relocating 8 ![]() Permit status: Complete | Completion date: November 19, 2015 | Expiration date: November 3, 2015 | Permit id: Pp20151103270 | |||||
Work category: 1m; install direct vent gas fireplace per manual specs; gas line work by others ![]() Permit status: Expired | Expiration date: November 20, 2015 | Permit id: Pmw20151120143 | |||||
Work category: 1p; two shower pan inspections ![]() Permit status: Complete | Completion date: January 11, 2016 | Expiration date: January 5, 2016 | Permit id: Pw20160105044 | |||||
Work category: 2pa; 3 bathroom, kitchen laundry remodel. ![]() Permit status: Complete | Completion date: June 9, 2016 | Expiration date: October 20, 2015 | Permit id: Pw20151020244 | |||||
SCORE 99 Two leaking saddle flashings at the parapet wall above. Remove brick veneer and stucco at both locations and remove the metal wall cap counter flashing and insall new metal saddle flashings and tie into (e) paper and replace stucco and brick veneer. Permit type: Building permit | Current use: Apartments | Permit id: #201509046163 | |||||
SCORE 99 Demolition of e wall at lower level. Relocate e electrical panel upgrade e baths refinishe e kitchen cabinets Permit type: Building permit | Current use: Apartments | Permit id: #201503181253 | |||||
SCORE 95 Unit #7. Relocate the 150a sub-panel. Remodel 3 bathroom lower floor re-install ceiling cans. 23 plugs 67 lights 28 switches. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150507801 | |||||
SCORE 96 Work category: 1m; replace existing furnace and condenser. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pmw20150826799 | |||||
SCORE 93 Relocate three heads. Replace 21 existing with new. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20150602175 | |||||
SCORE 100 Work category: 2pa; unit 7: remodel 3 baths and 1 kitchen include a shower pan inspection ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20150615089 | |||||
SCORE 99 We will be waterproofing 2 leaking windows that are attached. We will be removing the brick veneer and stucco around the windows and installing new flashing and replacing the stucco and the brick veneer Permit type: Building permit | Expiration date: November 24, 2011 | Current use: Apartments | Permit id: #201105246667 | |||||
82 lights 37 switches 48 receptacles circuits 3 fans 1 dishwasher 1 garbage disposal 1 microwave 1 range & 3 smoke detectors (1) 150amp panelboard switchboard - relocate panel - rewire kitchen and lighting throughout. Permit status: Complete | Permit id: E200812014196 | |||||
Unit #7. Relocate the 150a sub-panel. Remodel 3 bathroom lower floor re-install ceiling cans. 23 plugs 67 lights 28 switches. Permit status: Complete | Permit id: Ew20150507801 | |||||
Unit #7. Relocate the 150a sub-panel. Remodel 3 bathroom lower floor re-install ceiling cans. 23 plugs 67 lights 28 switches. Permit status: Complete | Permit id: Ew20150507801 | |||||
82 lights 37 switches 48 receptacles circuits 3 fans 1 dishwasher 1 garbage disposal 1 microwave 1 range & 3 smoke detectors (1) 150amp panelboard switchboard - relocate panel - rewire kitchen and lighting throughout. Permit status: Complete | Permit id: E200812014196 | |||||
Unit #7-remodel kitchen & 3 bathrooms. New interior railing, water heater on 3rd floor. Remove load bearing wall at kitchen & wall at dining room. Replace bath finishes. 4th floor remove wall to enlarge closet & reconfigure bath. Change finishes in other bath. Elect plmb on separate permit. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 2, 2009 | Expiration date: July 11, 2008 | Current use: Apartments | Permit id: 200807116512 | |||||
Street space permit only. ![]() Permit type: Otc alterations permit | Expiration date: October 21, 2008 | Permit id: M138104 | |||||
#7- relocate 2 heads, add 1 upright head,t. I. Upgrade of existing sprinkler system. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 2, 2009 | Expiration date: December 11, 2008 | Current use: Apartments | Permit id: 200812118289 | |||||
Revision to pa# 2008-0711-6512-new moment frame & beam strengthing ![]() ![]() Permit type: Otc alterations permit | Completion date: July 2, 2009 | Expiration date: December 12, 2008 | Current use: Apartments | Permit id: 200812128419 | |||||
#7- remodel 3 existing bathrooms, new electric radiant heating at master bath floor, built in desk at office, new lighting. Revision to approved building permit application #200807116512. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 2, 2009 | Expiration date: December 23, 2008 | Current use: Apartments | Permit id: 200812239128 | |||||
Work @ unit# 7 only. Reflashing of 2 living room windows & 1 kitchen window. Remove brick vemeer & stucco about 6" to 12" wide at jambs & sills of windows. Install new flashing at jambs & sills of windows & reinstall lath & stucco & brick veneer. ![]() ![]() Permit type: Otc alterations permit | Completion date: July 17, 2009 | Expiration date: June 2, 2009 | Current use: Apartments | Permit id: 200906029509 | |||||
We will be waterproofing 2 leaking windows that are attached. We will be removing the brick veneer and stucco around the windows and installing new flashing and replacing the stucco and the brick veneer ![]() ![]() Permit type: Otc alterations permit | Completion date: November 8, 2011 | Expiration date: May 24, 2011 | Current use: Apartments | Permit id: 201105246667 | |||||
Demolition of e wall at lower level. Relocate e electrical panel, upgrade e baths, refinishe e kitchen cabinets ![]() ![]() Permit type: Otc alterations permit | Completion date: July 25, 2016 | Expiration date: March 18, 2015 | Current use: Apartments | Permit id: 201503181253 | |||||
#7: relocate five heads, replace extg with new. N a for maher. Ref app#201503181253 ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 2, 2015 | Current use: Apartments | Permit id: 201506027834 | |||||
Street space and mta parking ![]() Permit type: Otc alterations permit | Expiration date: July 6, 2015 | Permit id: M600207 | |||||
Two leaking saddle flashings at the parapet wall above. Remove brick veneer and stucco at both locations and remove the metal wall cap counter flashing and insall new metal saddle flashings and tie into (e) paper and replace stucco and brick veneer. ![]() ![]() Permit type: Otc alterations permit | Completion date: March 29, 2016 | Expiration date: September 4, 2015 | Current use: Apartments | Permit id: 201509046163 | |||||
Street space permit , renewal of permit # 1362288 ![]() Permit type: Otc alterations permit | Expiration date: September 21, 2015 | Permit id: M623830 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: November 19, 2015 | Permit id: M639368 | |||||
Streetspace ![]() Permit type: Otc alterations permit | Expiration date: December 18, 2015 | Permit id: M648008 | |||||
Street space permit (renewal of permit #m648008) ![]() Permit type: Otc alterations permit | Expiration date: January 21, 2016 | Permit id: M656847 | |||||
Street space permit - renewal of permit # m656847 ![]() Permit type: Otc alterations permit | Expiration date: February 26, 2016 | Permit id: M666629 | |||||
82 lights, 37 switches, 48 receptacles, circuits, 3 fans, 1 dishwasher, 1 garbage disposal, 1 microwave, 1 range & 3 smoke detectors, (1) 150amp panelboard switchboard - relocate panel - rewire kitchen and lighting throughout. ![]() Permit status: Complete | Completion date: June 26, 2009 | Permit id: E200812014196 | |||||
Unit #7. Relocate the 150a sub-panel. Remodel 3 bathroom, lower floor re-install ceiling cans. 23 plugs, 67 lights, 28 switches. ![]() Permit status: Complete | Completion date: June 13, 2016 | Permit id: Ew20150507801 | |||||
Alter existing bathrooms (3) & kitchen. ![]() Permit status: Complete | Completion date: June 10, 2009 | Expiration date: November 10, 2008 | Permit id: Pp20081110194 | |||||
Relocate three heads. Replace 21 existing with new. ![]() Permit status: Complete | Completion date: June 15, 2015 | Expiration date: June 2, 2015 | Permit id: Pp20150602175 | |||||
2 shower pans ![]() Permit status: Complete | Completion date: March 4, 2009 | Expiration date: February 27, 2009 | Permit id: Pp20090227538 | |||||
Work category: 2pa; unit 7: remodel 3 baths and 1 kitchen, include a shower pan inspection ![]() Permit status: Complete | Completion date: April 27, 2016 | Expiration date: June 15, 2015 | Permit id: Pw20150615089 | |||||
Work category: 1m; replace existing furnace and condenser. ![]() Permit status: Complete | Completion date: September 14, 2015 | Expiration date: August 26, 2015 | Permit id: Pmw20150826799 | |||||
Relocate 2 sprinkler heads and add 1 upright ![]() Permit status: Complete | Completion date: January 8, 2009 | Expiration date: December 11, 2008 | Permit id: Pp20081211492 | |||||
SCORE 100 #7: relocate five heads replace extg with new. N/a for maher. Ref app#201503181253 Permit type: Building permit | Expiration date: October 2, 2015 | Current use: Apartments | Permit id: #201506027834 | |||||
SCORE 100 Work category: 1m; to install a direct vent gas fireplace. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pmw20130709747 | |||||
SCORE 96 Work category: 1m; furnish and install new furnace and connect to existing utilities. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pmw20130722039 | |||||
SCORE 99 Preparing the existing fireplace for gas insert. Opening wall where needed for extention of gas lines. Break out the existing harth and fireplace surround Permit type: Building permit | Expiration date: October 11, 2013 | Current use: Apartments | Permit id: #201306119189 | |||||
SCORE 100 Work category: 1p; rough in gas line. Up grade gas main and supply new to fire place. ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20130618367 | |||||
Preparing the existing fireplace for gas insert. Opening wall where needed for extention of gas lines. Break out the existing harth and fireplace surround ![]() ![]() Permit type: Otc alterations permit | Completion date: July 1, 2013 | Expiration date: June 11, 2013 | Current use: Apartments | Permit id: 201306119189 | |||||
#33 - replace drywall & repaint due to overflow of toilet, approx 2 sq ft, 5 8" type "x" gyp bd. ![]() ![]() Permit type: Otc alterations permit | Completion date: May 18, 2015 | Expiration date: May 11, 2015 | Current use: Apartments | Permit id: 201505115959 | |||||
Work category: 1m; to install a direct vent gas fireplace. ![]() Permit status: Complete | Completion date: July 15, 2013 | Expiration date: July 9, 2013 | Permit id: Pmw20130709747 | |||||
Work category: 1p; rough in gas line. Up grade gas main and supply new to fire place. ![]() Permit status: Complete | Completion date: June 26, 2013 | Expiration date: June 18, 2013 | Permit id: Pw20130618367 | |||||
Work category: 1m; furnish and install new furnace and connect to existing utilities. ![]() Permit status: Complete | Completion date: July 23, 2013 | Expiration date: July 22, 2013 | Permit id: Pmw20130722039 | |||||
SCORE 100 #33 - replace drywall & repaint due to overflow of toilet approx 2 sq ft 5/8" type "x" gyp bd. Permit type: Building permit | Expiration date: May 5, 2016 | Current use: Apartments | Permit id: #201505115959 | |||||
SCORE 89 Remodel 2nd floor bathroom and replace tub with shower. Replace closet doors at 2nd floor hall. Replace double sink vanity at master bathroom and replace vanity lights. Replace flooring throughout unit Permit type: Building permit | Current use: Apartments | Permit id: #201509096524 | |||||
2 shower pans Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20151216389 | |||||
SCORE 99 Unit 9: 1st floor: remove brick veneer & stucco around 2 leaking windows and install new flashing and install new stucco and brick. Veneer to match existing. Not facing street. Permit type: Building permit | Current use: Apartments | Permit id: #201605177677 | |||||
SCORE 96 2 shower pans ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20151216389 | |||||
SCORE 86 Furnace changeout in closet 80k btus 80%. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20151019836 | |||||
SCORE 100 Work category: 2pa; kitchen (3) bathroom and laundry remodel ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151020245 | |||||
SCORE 95 Re-wire unit ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150905061 | |||||
Re-wire unit Permit status: Complete | Permit id: Ew20150905061 | |||||
Re-wire unit Permit status: Complete | Permit id: Ew20150905061 | |||||
Remodel 2nd floor bathroom and replace tub with shower. Replace closet doors at 2nd floor hall. Replace double sink vanity at master bathroom and replace vanity lights. Replace flooring throughout unit ![]() ![]() Permit type: Otc alterations permit | Completion date: May 23, 2016 | Expiration date: September 9, 2015 | Current use: Apartments | Permit id: 201509096524 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: January 25, 2016 | Permit id: M657767 | |||||
Unit 9: 1st floor: remove brick veneer & stucco around 2 leaking windows and install new flashing and install new stucco and brick. Veneer to match existing. Not facing street. ![]() ![]() Permit type: Otc alterations permit | Completion date: May 5, 2017 | Expiration date: May 17, 2016 | Current use: Apartments | Permit id: 201605177677 | |||||
Re-wire unit ![]() Permit status: Complete | Completion date: May 19, 2016 | Permit id: Ew20150905061 | |||||
2 shower pans ![]() Permit status: Complete | Completion date: December 22, 2015 | Expiration date: December 16, 2015 | Permit id: Pp20151216389 | |||||
Furnace changeout in closet, 80k btus 80%. ![]() Permit status: Complete | Completion date: May 17, 2016 | Expiration date: October 19, 2015 | Permit id: Pm20151019836 | |||||
Work category: 2pa; kitchen, (3) bathroom and laundry remodel ![]() Permit status: Complete | Completion date: May 20, 2016 | Expiration date: October 20, 2015 | Permit id: Pw20151020245 | |||||
Work category: 1p; replace corroded gas piping from meter to building supply connection.. ![]() Permit status: Complete | Completion date: December 1, 2015 | Expiration date: November 30, 2015 | Permit id: Pw20151130279 | |||||
SCORE 89 Remodel 2nd floor bathroom and replace tub with shower. Replace closet doors at 2nd floor hall. Replace double sink vanity at master bathroom and replace vanity lights. Replace flooring throughout unit Permit type: Building permit | Current use: Apartments | Permit id: #201509096526 | |||||
SCORE 99 Unit 10: at entry door install new door pan and new base flashing between entry door and garbage room door and install a new door pan at the garbage room door. Permit type: Building permit | Current use: Apartments | Permit id: #201605177674 | |||||
SCORE 86 Furnace changeout in closet 80k btus 80%. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20151019838 | |||||
SCORE 100 Work category: 2pa; kitchen and bath remodel ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20151020246 | |||||
SCORE 95 Re-wire unit ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150905062 | |||||
Re-wire unit Permit status: Complete | Permit id: Ew20150905062 | |||||
Re-wire unit Permit status: Complete | Permit id: Ew20150905062 | |||||
Remodel 2nd floor bathroom and replace tub with shower. Replace closet doors at 2nd floor hall. Replace double sink vanity at master bathroom and replace vanity lights. Replace flooring throughout unit ![]() ![]() Permit type: Otc alterations permit | Completion date: May 23, 2016 | Expiration date: September 9, 2015 | Current use: Apartments | Permit id: 201509096526 | |||||
Street space ![]() Permit type: Otc alterations permit | Expiration date: January 25, 2016 | Permit id: M657767 | |||||
Unit 10: at entry door, install new door pan and new base flashing between entry door and garbage room door and install a new door pan at the garbage room door. ![]() ![]() Permit type: Otc alterations permit | Completion date: May 5, 2017 | Expiration date: May 17, 2016 | Current use: Apartments | Permit id: 201605177674 | |||||
Re-wire unit ![]() Permit status: Complete | Completion date: May 19, 2016 | Permit id: Ew20150905062 | |||||
Work category: 2pa; kitchen and bath remodel ![]() Permit status: Complete | Completion date: May 20, 2016 | Expiration date: October 20, 2015 | Permit id: Pw20151020246 | |||||
Furnace changeout in closet, 80k btus 80%. ![]() Permit status: Complete | Completion date: May 17, 2016 | Expiration date: October 19, 2015 | Permit id: Pm20151019838 | |||||
Work category: 1p; replace corroded gas piping from meter to building supply connection unit #10 ![]() Permit status: Complete | Completion date: December 1, 2015 | Expiration date: November 30, 2015 | Permit id: Pw20151130281 | |||||
Work category: 2pa; replace kitchen and bathroom sinks only in kind. Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111201047 | |||||
SCORE 82 Work category: 2pa; replace kitchen and bathroom sinks only in kind. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20111201047 | |||||
New recess lighting new wiring relocation switches. 15 lights switches (max). Permit status: Complete | Permit id: E201108307336 | |||||
New recess lighting new wiring relocation switches. 15 lights switches (max). Permit status: Complete | Permit id: E201108307336 | |||||
Remodel master bathroom in kind, repaint. Replace hardwood floor, change light fixtures, install new carpet upstairs, lighting to comply with cec 150(k). No change to wall, window & door. ![]() ![]() Permit type: Otc alterations permit | Completion date: February 27, 2012 | Expiration date: August 24, 2011 | Current use: Apartments | Permit id: 201108243183 | |||||
New recess lighting, new wiring, relocation switches. 15 lights switches (max). ![]() Permit status: Complete | Completion date: February 23, 2012 | Permit id: E201108307336 | |||||
Work category: 2pa; replace kitchen and bathroom sinks only in kind. ![]() Permit status: Complete | Completion date: February 21, 2012 | Expiration date: December 1, 2011 | Permit id: Pw20111201047 | |||||
New plumbing through out bathroom ![]() Permit status: Complete | Completion date: February 21, 2012 | Expiration date: August 30, 2011 | Permit id: Pp20110830638 | |||||
SCORE 95 Rewire entire unit ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20110526061 | |||||
Interior condo residence remodel. New skylights new finishes remodel kitchen remodel baths new hvac new electrical outlet and lighting layout. ![]() ![]() Permit type: Building permit | Current use: Apartments | Permit id: #201012237332 | |||||
SCORE 100 1 shower pan installation ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20111228354 | |||||
SCORE 100 Work category: 8p; hydronic heating system with a new boiler including a backflow preventer for the wtr to boiler ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20110725710 | |||||
SCORE 92 Unit #8-nfpa-b fire sprinkler t. I. For condo remodel Permit type: Building permit | Expiration date: December 24, 2011 | Current use: Apartments | Permit id: #201106248833 | |||||
SCORE 100 Residential condo fire sprinkler t. I. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20110624122 | |||||
Interior condo residence remodel. New skylights new finishes remodel kitchen remodel baths new hvac new electrical outlet and lighting layout. ![]() ![]() Permit type: Building permit | Expiration date: March 18, 2012 | Current use: Apartments | Permit id: #201012237332 | |||||
SCORE 96 Work category: 1m; install one direct vent fireplace ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pmw20111005976 | |||||
Rewire entire unit Permit status: Complete | Permit id: Ew20110526061 | |||||
Rewire entire unit Permit status: Complete | Permit id: Ew20110526061 | |||||
Interior condo residence remodel. New skylights, new finishes, remodel kitchen, remodel baths,new hvac, new electrical outlet and lighting layout. ![]() ![]() Permit type: Additions alterations or repairs | Completion date: September 13, 2012 | Expiration date: December 23, 2010 | Current use: Apartments | Permit id: 201012237332 | |||||
Street space and mta parking ![]() Permit type: Otc alterations permit | Expiration date: April 18, 2011 | Permit id: M254786 | |||||
Unit #8-nfpa-b fire sprinkler t. I. For condo remodel ![]() ![]() Permit type: Otc alterations permit | Expiration date: June 24, 2011 | Current use: Apartments | Permit id: 201106248833 | |||||
Street space & mta ![]() Permit type: Otc alterations permit | Expiration date: October 21, 2011 | Permit id: M285508 | |||||
Street space and mta parking ![]() Permit type: Otc alterations permit | Expiration date: March 23, 2012 | Permit id: M309907 | |||||
Street space with meters. ![]() Permit type: Otc alterations permit | Expiration date: May 11, 2012 | Permit id: M320667 | |||||
Rewire entire unit ![]() Permit status: Complete | Completion date: June 4, 2012 | Permit id: Ew20110526061 | |||||
Work category: 1p; stub 3" waste pipe from ceiling of commercial space into bar closet of unit #8 ![]() Permit status: Expired | Expiration date: December 7, 2010 | Permit id: Pw20101207917 | |||||
Residential condo fire sprinkler t. I. ![]() Permit status: Complete | Completion date: August 9, 2011 | Expiration date: June 24, 2011 | Permit id: Pp20110624122 | |||||
1 shower pan installation ![]() Permit status: Expired | Expiration date: December 28, 2011 | Permit id: Pp20111228354 | |||||
Work category: 1m; install one direct vent fireplace ![]() Permit status: Complete | Completion date: November 2, 2011 | Expiration date: October 5, 2011 | Permit id: Pmw20111005976 | |||||
Work category: 8p; hydronic heating system with a new boiler, including a backflow preventer for the wtr to boiler ![]() Permit status: Complete | Completion date: June 7, 2012 | Expiration date: July 25, 2011 | Permit id: Pw20110725710 | |||||
SCORE 99 Work category: 1p; replace water heater ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20150605849 | |||||
Work in unit #2: bathroom remodel 4 lights 3 switches 2 receptacles 1 fan. Permit status: Complete | Permit id: E201106305997 | |||||
Work in unit #2: bathroom remodel 4 lights 3 switches 2 receptacles 1 fan. Permit status: Complete | Permit id: E201106305997 |