Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Quiet hollow llc new #33 Date: July 28, 2009 Permit status: Closed | Permit id: 09-02413 | |||||
Quiet hollow llc new #40 Date: July 28, 2009 Permit status: Closed | Permit id: 09-02414 | |||||
Quiet hollow new mobile Date: September 8, 2009 Permit status: Closed | Permit id: 09-01618 | |||||
Proair, inc mobile home setup Date: May 23, 2007 Permit status: Closed | Permit id: 06-05792 | |||||
Lot 2 maggard quiet hollow Date: October 17, 2005 Permit status: Closed | Permit id: 05-02457 | |||||
Date: November 13, 2002 Permit status: Closed | Permit id: 02-04747 | |||||
Date: September 17, 2001 Permit status: Closed | Permit id: 01-02683 | |||||
Date: February 21, 2000 Permit status: Closed | Permit id: 99-05598 | |||||
SCORE 98 Comment date: fri jun 29 00:00: edt 2001 - quiet hollow mhp lot 3; comment date: mon sep 17 00:00: edt 2001 - all permits final jsb; comment date: fri jun 29 00:00: edt 2001 - call maro slaughter at r Client: Quiet Hollow Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-02683 | Parcel: 10084 | |||||
Lot 2 maggard quiet hollow Value: $17,500 Client: Lot 2 Maggard Quiet Hollo | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 05-02457 | Parcel: 10084 | |||||
SCORE 100 Lot 2 maggard quiet hollow Client: Lot 2 Maggard Quiet Hollo | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 05-02457 | Parcel: 10084 | |||||
Proair, inc mobile home setup Value: $1,500 Client: Proair Mh Setup | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 06-05792 | Parcel: 10084 | |||||
SCORE 99 Quiet hollow new mobile Client: Quiet Hollow New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01618 | Parcel: 10084 | |||||
SCORE 99 Quiet hollow llc new #33 Client: Quiet Hollow Llc New #33 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02413 | Parcel: 10084 | |||||
SCORE 100 Quiet hollow llc new #33 Client: Quiet Hollow Llc New #33 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02413 | Parcel: 10084 | |||||
SCORE 100 Quiet hollow llc new #40 Client: Quiet Hollow Llc New #40 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02414 | Parcel: 10084 | |||||
SCORE 99 Proair, inc mobile home setup Client: Proair Mh Setup | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 06-05792 | Parcel: 10084 | |||||
SCORE 99 Quiet hollow new mobile Client: Quiet Hollow New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01618 | Parcel: 10084 | |||||
SCORE 100 Quiet hollow new mobile Client: Quiet Hollow New Mobile | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-01618 | Parcel: 10084 | |||||
SCORE 99 Quiet hollow llc new #40 Client: Quiet Hollow Llc New #40 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02414 | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 00-00556s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 01-00523s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 01-00632s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 01-01045s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 05-00636s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 05-00961s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 07-02721s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Permit id: 01-01045s | Parcel: 10084 | |||||
Replace mobile home. In existing park. Lot 13 wheelhome mhp.; all permits final/jsb; building safety comments manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water/waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Assure electrical permit is activated. C Permit type: Permits - historical | Permit status: Closed | Permit id: 01-02512 | Parcel: 10084 | |||||
Quiet hollow mhp lot 3; all permits final jsb; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water/waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do Permit type: Permits - historical | Permit status: Closed | Permit id: 01-02683 | Parcel: 10084 | |||||
Quiet hollow mobile home park lot 7; lot 7/quiet hollow mobile home park/jsb; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water/waste lines hook-ups. It is recommended that water lines Permit type: Permits - historical | Permit status: Closed | Permit id: 01-03993 | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Permit id: 01-00523s | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Permit id: 01-00632s | Parcel: 10084 | |||||
Mobile home lot 5; premise #redacted phone number7; per janis of ath, no mechanical permit needed at this site:; lot #5, issued by sb.; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water Permit type: Permits - historical | Permit status: Closed | Permit id: 02-04747 | Parcel: 10084 | |||||
Building enforcement Permit status: In compliance | Permit id: 00-00556s | Parcel: 10084 | |||||
Lot 14 wheel home mobile home park; call maro slaughter at redacted phone number to schedule inspection. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water/waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Assure electrical permit is activated. Can use same electrical permit for set-up Permit type: Permits - historical | Permit status: Closed | Permit id: 99-05598 | Parcel: 10084 | |||||
Mobile home set up on lot 2 quiet hollow mhp sfb manufactured home park appears to be a pre-existing park. Setbacks measured from perimeter boundary. Park located in rm-8 residential multi-family medium density district and manufactured housing community overlay (mhc-o ; july 28, 2005 9:46: am sbrank premise #redacted phone number7 lot 2; october 17, 2005 11:23:09 am sbrank lot 2, quiet hollow mhp.; manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exis Permit type: Permits - historical | Permit status: Closed | Permit id: 05-02457 | Parcel: 10084 | |||||
November 28, 2006 4:13:09 pm bdavis proair - mobile home setup.; zoning site plan permit application approved for replacement of manufactured home for space at 31 otis campbell rd. Space is located in existing manufactured home park named quiet hollow mhp owned by quiet hollow llc. Property located in rm-8 multi-family medium density district with manufactured housing overlay / manufactured housing community overlay setbacks measured from perimeter boundary. ; may 29, 2007 9:21:56 am bdavis premise #redacted phone number7; may 23, 2007 9:17:45 am bdavis manufactured home at 31 otis campbell rd. Space is located in existing manufactured home park named quiet hollow mhp; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc. This permit is issued based on in Permit type: Permits - historical | Permit status: Closed | Permit id: 06-05792 | Parcel: 10084 | |||||
April 9, 2009 10:10:49 am cbeavers. New double-wide on park site location: patton ave to right on lousiana, to right on emma then left on bingham then right on pearson bridge then left on otis campbell all the way to the top; april 13, 2009 9:04:57 am alisam. Rec amendment from applicant - contractor name should have been cmh instead of clayton homes ;aml; september 8, 2009 8:35:28 am alisam. New double-wide on park site;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are re Permit type: Permits - historical | Permit status: Closed | Permit id: 09-01618 | Parcel: 10084 | |||||
May 21, 2009 11:12: am cbeavers. Set up of new mobile home location: riverside to pearson bridge rd, then l on pearson bridge to otis campbell rd, on r lots are at the far end 33 otis campbell rd; july 28, 2009 10:19: am alisam. Set up of new mobile home-lot 33;aml; 1 for 1 replacement of existing mobile home with new mobile home in quiet hollow mobile home park. Approved - no additional conditions; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling st Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02413 | Parcel: 10084 | |||||
May 21, 2009 11:15:35 am cbeavers. Set up of new mobile home location: riverside to pearson bridge rd, then l on pearson bridge to otis campbell rd, on r lots are at the far end otis campbell rd; july 28, 2009 10:18:11 am alisam. Set up of new mobile home lot 40;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line ho Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02414 | Parcel: 10084 | |||||
SCORE 98 Comment date: tue sep 18 00:00: edt 2001 - quiet hollow mobile home park lot 7; comment date: wed jul 00:00: edt 2002 - lot 7/quiet hollow mobile home park/jsb; comment date: tue sep 18 00:00: edt 200 Client: Quiet Hollow Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-03993 | Parcel: 10084 | |||||
Proair, inc mobile home setup Date: May 23, 2007 Value: $1,500 Client: Proair Mh Setup | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 06-05792 | Parcel: 10084 | |||||
Lot 2 maggard quiet hollow Date: October 17, 2005 Value: $17,500 Client: Lot 2 Maggard Quiet Hollo | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 05-02457 | Parcel: 10084 | |||||
Building enforcement Date: June 13, 2000 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 00-00556s | Parcel: 10084 | |||||
Building enforcement Date: June 5, 2001 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 01-00523s | Parcel: 10084 | |||||
Building enforcement Date: February 5, 2002 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 02-00161s | Parcel: 10084 | |||||
Building enforcement Date: July 27, 2005 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 05-00636s | Parcel: 10084 | |||||
Building enforcement Date: March 12, 2007 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 07-02225s | Parcel: 10084 | |||||
Quiet hollow llc new #33 Date: July 28, 2009 Value: $2,100 Permit type: Historical | Permit status: Closed | Permit id: 09-02413 | |||||
Quiet hollow llc new #40 Date: July 28, 2009 Value: $2,100 Permit type: Historical | Permit status: Closed | Permit id: 09-02414 | |||||
Quiet hollow new mobile Date: September 8, 2009 Value: $70,000 Permit type: Historical | Permit status: Closed | Permit id: 09-01618 | |||||
Historical Date: November 13, 2002 Value: $23,000 Permit status: Closed | Permit id: 02-04747 | |||||
Historical Date: July 10, 2002 Value: $9,000 Permit status: Closed | Permit id: 01-03993 | |||||
Historical Date: September 17, 2001 Value: $8,500 Permit status: Closed | Permit id: 01-02683 | |||||
Historical Date: August 29, 2001 Value: $10,000 Permit status: Closed | Permit id: 01-02512 | |||||
Historical Date: February 21, 2000 Value: $4,500 Permit status: Closed | Permit id: 99-05598 | |||||
SCORE 98 Comment date: fri jun 29 00:00: edt 2001 - quiet hollow mhp lot 3; comment date: mon sep 17 00:00: edt 2001 - all permits final jsb; comment date: fri jun 29 00:00: edt 2001 - call maro slaughter at r Client: Quiet Hollow Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-02683 | Parcel: 10084 | |||||
SCORE 98 Comment date: tue jun 19 00:00: edt 2001 - replace mobile home. In existing park. Lot 13 wheelhome mhp.; comment date: wed aug 29 00:00: edt 2001 - all permits final/jsb; comment date: tue jun 19 00:0 Client: Lot #13 Wheelhome Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-02512 | Parcel: 10084 | |||||
Quiet hollow mhp lot 3; all permits final jsb; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do Date: September 17, 2001 Permit type: Permits - historical | Permit status: Closed | Permit id: 01-02683 | Parcel: 10084 | |||||
SCORE 97 Comment date: tue sep 18 00:00: edt 2001 - quiet hollow mobile home park lot 7; comment date: wed jul 00:00: edt 2002 - lot 7/quiet hollow mobile home park/jsb; comment date: tue sep 18 00:00: edt 200 Client: Quiet Hollow Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-03993 | Parcel: 10084 | |||||
SCORE 87 Comment date: mon oct 21 00:00: edt 2002 - mobile home lot 5; comment date: fri nov 08 00:00: est 2002 - premise #redacted phone number7; comment date: wed nov 13 00:00: est 2002 - per janis of ath, n Client: Quiet Hollow | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 02-04747 | Parcel: 10084 | |||||
SCORE 99 Comment date: tue nov 02 00:00: est 1999 - lot 14 wheel home mobile home park; comment date: tue nov 02 00:00: est 1999 - call maro slaughter at redacted phone number to schedule inspection. Manufactu Client: David Maggard | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05598 | Parcel: 10084 | |||||
Quiet hollow mobile home park lot 7; lot 7 quiet hollow mobile home park jsb; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water waste lines hook-ups. It is recommended that water lines Date: July 10, 2002 Permit type: Permits - historical | Permit status: Closed | Permit id: 01-03993 | Parcel: 10084 | |||||
SCORE 90 Comment date: mon oct 21 00:00: edt 2002 - mobile home lot 5; comment date: fri nov 08 00:00: est 2002 - premise #redacted phone number7; comment date: wed nov 13 00:00: est 2002 - per janis of ath, n Client: Quiet Hollow | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 02-04747 | Parcel: 10084 | |||||
SCORE 59 Comment date: tue jun 19 00:00: edt 2001 - replace mobile home. In existing park. Lot 13 wheelhome mhp.; comment date: wed aug 29 00:00: edt 2001 - all permits final/jsb; comment date: tue jun 19 00:0 Client: Lot #13 Wheelhome Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-02512 | Parcel: 10084 | |||||
SCORE 100 Quiet hollow llc new #33 Client: Quiet Hollow Llc New #33 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02413 | Parcel: 10084 | |||||
Replace mobile home. In existing park. Lot 13 wheelhome mhp.; all permits final jsb; building safety comments manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Assure electrical permit is activated. C Date: August 29, 2001 Permit type: Permits - historical | Permit status: Closed | Permit id: 01-02512 | Parcel: 10084 | |||||
Mobile home lot 5; premise #redacted phone number7; per janis of ath, no mechanical permit needed at this site:; lot #5, issued by sb.; call maro slaughter at redacted phone number to schedule inspection. All subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water Date: November 13, 2002 Permit type: Permits - historical | Permit status: Closed | Permit id: 02-04747 | Parcel: 10084 | |||||
SCORE 59 Comment date: tue sep 18 00:00: edt 2001 - quiet hollow mobile home park lot 7; comment date: wed jul 00:00: edt 2002 - lot 7/quiet hollow mobile home park/jsb; comment date: tue sep 18 00:00: edt 200 Client: Quiet Hollow Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 01-03993 | Parcel: 10084 | |||||
SCORE 97 Comment date: tue nov 02 00:00: est 1999 - lot 14 wheel home mobile home park; comment date: tue nov 02 00:00: est 1999 - call maro slaughter at redacted phone number to schedule inspection. Manufactu Client: David Maggard | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 99-05598 | Parcel: 10084 | |||||
SCORE 100 Quiet hollow llc new #40 Client: Quiet Hollow Llc New #40 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-02414 | Parcel: 10084 | |||||
Mobile home set up on lot 2 quiet hollow mhp sfb manufactured home park appears to be a pre-existing park. Setbacks measured from perimeter boundary. Park located in rm-8 residential multi-family medium density district and manufactured housing community overlay (mhc-o ; july 28, 2005 9:46: am sbrank premise #redacted phone number7 lot 2; october 17, 2005 11:23:09 am sbrank lot 2, quiet hollow mhp.; manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exis Date: October 17, 2005 Permit type: Permits - historical | Permit status: Closed | Permit id: 05-02457 | Parcel: 10084 | |||||
Lot 14 wheel home mobile home park; call maro slaughter at redacted phone number to schedule inspection. Manufacturers installation manual must be on site for inspection. Use their specs on pier and anchor strap spacing if manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. If more than 25% of unit is over 3 above grade then tie-downs & pier spacing to be designed by engineer. Stairs required at exists. Water and waste lines properly supported. Building "final" includes water waste lines hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. Assure electrical permit is activated. Can use same electrical permit for set-up Date: February 21, 2000 Permit type: Permits - historical | Permit status: Closed | Permit id: 99-05598 | Parcel: 10084 | |||||
November 28, 2006 4:13:09 pm bdavis proair - mobile home setup.; zoning site plan permit application approved for replacement of manufactured home for space at 31 otis campbell rd. Space is located in existing manufactured home park named quiet hollow mhp owned by quiet hollow llc. Property located in rm-8 multi-family medium density district with manufactured housing overlay manufactured housing community overlay setbacks measured from perimeter boundary. ; may 29, 2007 9:21:56 am bdavis premise #redacted phone number7; may 23, 2007 9:17:45 am bdavis manufactured home at 31 otis campbell rd. Space is located in existing manufactured home park named quiet hollow mhp; setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc. This permit is issued based on in Date: May 23, 2007 Permit type: Permits - historical | Permit status: Closed | Permit id: 06-05792 | Parcel: 10084 | |||||
April 9, 2009 10:10:49 am cbeavers. New double-wide on park site location: patton ave to right on lousiana, to right on emma then left on bingham then right on pearson bridge then left on otis campbell all the way to the top; april 13, 2009 9:04:57 am alisam. Rec amendment from applicant - contractor name should have been cmh instead of clayton homes ;aml; september 8, 2009 8:35:28 am alisam. New double-wide on park site;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are re Date: September 8, 2009 Permit type: Permits - historical | Permit status: Closed | Permit id: 09-01618 | Parcel: 10084 | |||||
May 21, 2009 11:12: am cbeavers. Set up of new mobile home location: riverside to pearson bridge rd, then l on pearson bridge to otis campbell rd, on r lots are at the far end 33 otis campbell rd; july 28, 2009 10:19: am alisam. Set up of new mobile home-lot 33;aml; 1 for 1 replacement of existing mobile home with new mobile home in quiet hollow mobile home park. Approved - no additional conditions; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling st Date: July 28, 2009 Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02413 | Parcel: 10084 | |||||
May 21, 2009 11:15:35 am cbeavers. Set up of new mobile home location: riverside to pearson bridge rd, then l on pearson bridge to otis campbell rd, on r lots are at the far end otis campbell rd; july 28, 2009 10:18:11 am alisam. Set up of new mobile home lot 40;aml; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line ho Date: July 28, 2009 Permit type: Permits - historical | Permit status: Closed | Permit id: 09-02414 | Parcel: 10084 |