Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
One oak plaza Date: October 15, 2012 Permit type: Sprinkler system | Permit status: Issued | Permit id: 12-05826 | |||||
One oak pl 2nd floor ladies restroom Date: March 8, 2011 Permit type: Sprinkler system | Permit status: Issued | Permit id: 11-01205 | |||||
First baptist church facade remodel Date: April 25, 2006 Permit status: Closed | Permit id: 06-01170 | |||||
Electrical Date: March 9, 2004 Permit status: Closed | Permit id: 04-01068 | |||||
Date: January 31, 2005 Permit status: Closed | Permit id: 04-00311 | |||||
Date: November 26, 2002 Permit status: Closed | Permit id: 02-05385 | |||||
Date: January 2, 2003 Permit status: Closed | Permit id: 02-05233 | |||||
Top a stop handicap ramp Date: November 17, 2010 Permit type: Other | Permit status: Issued | Permit id: 10-01362 | |||||
First baptist building Date: February 25, 2010 Permit status: Closed | Permit id: 10-00999 | |||||
Asheville citizens times marathon Date: September 9, 2013 Permit status: Issued | Permit id: 13-01892 | |||||
SCORE 100 Comment date: tue mar 09 00:00: est 2004 - 3/9/04 11:25:55 am add lights and switch in lobby rec. Via walk in please call david souther for inspection redacted phone number;scc Date: March 9, 2004 Contractor: Jonathan Paul Fedock Client: Skyland Behavioral | Permit type: Com: electrical | Permit status: Closed | Current use: Commercial | Permit id: 04-01068 | Parcel: 17109 | |||||
SCORE 100 Comment date: thu mar 00:00: est 2003 - replacing package unit on roof;john;cah;call joe chennault for inspections redacted phone number Client: First Baptist | Permit type: Com: mechanical | Permit status: Closed | Current use: Commercial | Permit id: 03-01167 | Parcel: 17109 | |||||
SCORE 95 Comment date: mon may 13 00:00: edt 2002 - state employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
Comment date: fri oct 25 00:00: edt 2002 - temporary sign shall not exceed 32 square feet. Shall not be located within any public right of way. May be displayed for a maximum period of thirty (30) day Client: Secu | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 02-04861 | Parcel: 17109 | |||||
Comment date: mon nov 18 00:00: est 2002 - --- permit for one f-s ground sign (to be dev. I. D. Sign) -- 18. 32 sq ft; comment date: mon nov 18 00:00: est 2002 - work outlined in this permit must commen Client: Secu | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 02-05233 | Parcel: 17109 | |||||
Comment date: tue nov 26 00:00: est 2002 - temporary sign shall not exceed 32 square feet. Shall not be located within any public right of way. May be displayed for a maximum period of thirty (30) day Client: Secu | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 02-05385 | Parcel: 17109 | |||||
SCORE 100 First baptist building Client: First Baptist Building | Permit type: Com: demo | Permit status: Closed | Current use: Commercial | Permit id: 10-00999 | Parcel: 17109 | |||||
SCORE 100 Top a stop handicap ramp Date: September 29, 2015 Contractor: City Of Asheville Client: Top A Stop Handicap Ramp | Permit type: Com: other new | Permit status: Expired | Current use: Commercial | Permit id: 10-01362 | Parcel: 17109 | |||||
SCORE 100 One oak pl 2nd floor ladies restroom Client: One Oak Pl 2nd Floor Ladi | Permit type: Sprinkler sys. | Permit status: Issued | Current use: Fire | Permit id: 11-01205 | Parcel: 17109 | |||||
SCORE 100 One oak plaza Client: One Oak Plaza | Permit type: Sprinkler sys. | Permit status: Issued | Current use: Fire | Permit id: 12-05826 | Parcel: 17109 | |||||
SCORE 100 Asheville citizens times marathon Date: June 3, 2015 Contractor: Applicant Client: Ashe Time Marathon | Permit type: Event-temporary use | Permit status: Closed | Current use: Event-temporary use | Permit id: 13-01892 | Parcel: 17109 | |||||
6:30pm runners finish, 6:30pm to 8:00pm breakdown and clean -up - 8 10x canopies, ft long finish line chute anchored on 4 corners with a single layer scaffold - 5 porta johns, electric for computer and sound system off generator Client: Blue Ridge Relay | Permit type: Event-temporary use | Permit status: Expired | Current use: Event-temporary use | Permit id: 15-11395 | Parcel: 17109 | |||||
SCORE 100 First baptist building Client: First Baptist Building | Permit type: Com: demo | Permit status: Closed | Current use: Commercial | Permit id: 10-00999 | Parcel: 17109 | |||||
Atm Client: Kdh Bp#02-2027 | Permit type: Planning level i | Permit status: Approved | Current use: Development | Permit id: 02-11000062pz | |||||
State employees credit union - atm; p&z#02-11062; recd amendment to add canopy;cah; electric activated by ricky;redacted phone number;cah; recd amendment for canopy @ drive-thru; recd revised site plan for canopy. Pmd; recd sprinkler plans. Pmd; state employees credit union, atm, canopy and drive-thru. Issued by sb.; planning comments: level one approved for new drive-up atm and new 9 foot wide drive thru lane with the conditon that 25 shrubs be planted within feet of the affected vehicular use areas and not within the street right-of-way. Kdh planning comments: if this approved site plan is required to be revised by building safety and/or the fire department when trying to obtain a building permit, a revised plan must be resubmitted to the planning department for review and approval.; architectural plans required. Plans submitted are not acceptable. No p,m, or e plans submitted.; >>>>fire prevention comments<<<< amendment for curtains issued 5/31/02. Call herb roberson or lewis garriso Permit type: Com: remodel | Permit status: Closed | Permit id: 02-02027 | Parcel: 17109 | |||||
State employees credit union interior demo; ee & pl permits under 02-2027:; building safety comments interior non-structural demoltion only. No occupancy under this permit. No demolition of fire separations. See "review comments" sheet fro addition information and requirements regarding demolition. Call harry taylor for building inspection at redacted phone number all subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits.; wnc air pollution approved by mike matthews recd fax Permit type: Com: demo | Permit status: Closed | Permit id: 02-01989 | Parcel: 17109 | |||||
February 24, 20 2:18:58 pm ssalyer. Commercial interior demo for first baptist church building beside church which is the 5 oak building;unit 106 105 credit union 206 205 203 201 1st and 2nd floor hallways due to water damage;no repair work at this time for dry out only;coordinate work in the field;sls; building safety comments see the review comments sheet for additional information and requirements. Building code inspection requests must be received before 7: a. M.: phone: redacted phone number. Internet: go to www. Ashevillenc. Gov; select online services; select permit tracking help; select development & building permit tracking tool and enter permit # the building code inspectors assigned to this project can be reached on their cell: building - anne graham redacted phone number electrical - jay eichhorn redacted phone number plumbing / mechanical / gas piping - dan stewart redacted phone number Permit type: Com: demo | Permit status: Closed | Permit id: 10-00999 | Parcel: 17109 | |||||
Finish line for mile running relay race (blue ridge relay) 11th year for finishing in asheville on september 12 6am to 9:30am set, 9:30am - 6:30pm runners finish, 6:30pm to 8:00pm breakdown and clean -up - 8 10x canopies, ft long finish line chute anchored on 4 corners with a single layer scaffold - 5 porta johns, electric for computer and sound system off generator Permit type: Event-temporary use | Permit status: Expired | Permit id: 15-11395 | Parcel: 17109 | |||||
6:30pm runners finish, 6:30pm to 8:00pm breakdown and clean -up - 8 10x canopies, ft long finish line chute anchored on 4 corners with a single layer scaffold - 5 porta johns, electric for computer and sound system off generator Date: January 11, 2016 Client: Blue Ridge Relay | Permit type: Event-temporary use | Permit status: Expired | Current use: Event-temporary use | Permit id: 15-11395 | Parcel: 17109 | |||||
--- permit for one f-s ground sign (to be dev. I. D. Sign) -- 18. 32 sq ft; comment date: mon nov 18 00:00: est 2002 - work outlined in this permit must commen Date: January 2, 2003 Client: Secu | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 02-05233 | Parcel: 17109 | |||||
Temporary sign shall not exceed 32 square feet. Shall not be located within any public right of way. May be displayed for a maximum period of thirty (30) day Date: October 25, 2002 Client: Secu | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 02-04861 | Parcel: 17109 | |||||
Up at 6: a. M. Tear down ends at 8: p. M. 8 (10x10) canopies, 4(5x8) single layer sccaffold, 2 (50ft long) fences, 1 (1000w) generator. Finish line for 208-mile running relay race. This is the 12th year for the finish in asheville. Date: August 12, 2016 Client: Blue Ridge Relay | Permit type: Event-temporary use | Permit status: Issued | Current use: Event-temporary use | Permit id: 16-08493 | Parcel: 17109 | |||||
Atm Date: May 14, 2002 Client: Kdh Bp#02-2027 | Permit type: Planning level i | Permit status: Approved | Current use: Development | Permit id: 02-11000062pz | |||||
One oak plaza Date: October 15, 2012 Value: $1,700 Permit type: Fire | Permit status: Issued | Permit id: 12-05826 | |||||
One oak pl 2nd floor ladies restroom Date: March 8, 2011 Value: $1,500 Permit type: Fire | Permit status: Issued | Permit id: 11-01205 | |||||
First baptist church facade remodel Date: April 25, 2006 Value: $107,520 Permit type: Commercial | Permit status: Closed | Permit id: 06-01170 | |||||
Historical Date: January 31, 2005 Value: $39,411 Permit status: Closed | Permit id: 04-00311 | |||||
Historical Date: March 1, 2004 Value: $41,000 Permit status: Closed | Permit id: 03-00823 | |||||
Commercial Date: March 13, 2003 Value: $40,000 Permit status: Closed | Permit id: 02-02027 | |||||
Commercial Date: May 17, 2002 Value: $5,600 Permit status: Closed | Permit id: 02-01989 | |||||
Commercial Date: March 20, 2003 Value: $8,000 Permit status: Closed | Permit id: 03-01167 | |||||
First baptist building Date: February 25, 2010 Value: $52,500 Permit type: Commercial | Permit status: Closed | Permit id: 10-00999 | |||||
SCORE 100 June 4, 20 2:53:57 pm alisam. Wayfinding sign project - lighting for signs at the following locations for the wayfinding project 1 oak st (in round-a-bout)existing power source woodfin street (near hometrust bank) premise #redacted phone number6 185 clingman ave (the grey eagle/clingman ave) premise #redacted phone number7;aml call redacted phone number for inspections Date: November 4, 2010 Contractor: Emory Electric Inc Client: Wayfinding Sign Project | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-03008 | Parcel: 485028 | |||||
SCORE 100 One oak plaza;fire sprinkler;cah2/27/03 10:35:12 am; fire sprinkler 1. All fire sprinkler work to meet nfpa 13. 2. Fire inspector is to be present for all required pressure test, performance, and acceptance documentation due at final inspection 3. Approved plans and permits shall be on site for any in spection to take place 4. Fire sprinkler must be connected to an off site alarm monitoring system or a fire alarm that reports off site. 5. Water connections for new fire sprinkler underground work to meet city engineering and water department standards . 6. Knox box. A knox key storage box shall be provided for new construction. For buildings, other than high-rise, a minimum of 3 complete sets of keys shall be provided. Keys shall be provided for all exterior entry doors, fire protection equipment control equipment rooms, mechanical and electrical rooms, elevator controls and equipment spaces, etc. For high-rise buildings, 6 complete sets are required. A key box is required at entrance Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 03-00823 | Parcel: 17109 | |||||
SCORE 95 State employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
State employees credit union - atm; p&z#02-11062; recd amendment to add canopy;cah; electric activated by ricky;redacted phone number;cah; recd amendment for canopy @ drive-thru; recd revised site plan for canopy. Pmd; recd sprinkler plans. Pmd; state employees credit union, atm, canopy and drive-thru. Issued by sb.; planning comments: level one approved for new drive-up atm and new 9 foot wide drive thru lane with the conditon that 25 shrubs be planted within feet of the affected vehicular use areas and not within the street right-of-way. Kdh planning comments: if this approved site plan is required to be revised by building safety and or the fire department when trying to obtain a building permit, a revised plan must be resubmitted to the planning department for review and approval.; architectural plans required. Plans submitted are not acceptable. No p,m, or e plans submitted.; >>>>fire prevention comments<<<< amendment for curtains issued 5 31 02. Call herb roberson or lewis garriso Date: March 13, 2003 Permit type: Com: remodel | Permit status: Closed | Permit id: 02-02027 | Parcel: 17109 | |||||
SCORE 80 Comment date: thu jan 22 00:00: est 2004 - reroof bldg byg; comment date: fri jan 14 00:00: est 2005 - voided due to inactivity sfb; comment date: tue jan 27 00:00: est 2004 - buil Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 04-00311 | Parcel: 17109 | |||||
SCORE 99 Comment date: mon may 13 00:00: edt 2002 - state employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
SCORE 100 Comment date: mon may 13 00:00: edt 2002 - state employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
SCORE 99 Comment date: mon may 13 00:00: edt 2002 - state employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
SCORE 99 Comment date: fri may 00:00: edt 2002 - state employees credit union interior demo; comment date: thu aug 15 00:00: edt 2002 - ee & pl permits under 02-2027:; comment date: tue may 14 00:00: edt 2002 Client: State Employees Interior | Permit type: Com: demo | Permit status: Closed | Current use: Commercial | Permit id: 02-01989 | Parcel: 17109 | |||||
SCORE 100 September 21, 20 9:03:22 am jfortner. Replacing condensing unit and air handler on roof. Same for same. Rec via walk in. To schedule inspection call (828)redacted phone number; jlf Date: March 4, 2011 Contractor: J And C Heating And Cooling Client: One Oak Plaza | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-05320 | Parcel: 485028 | |||||
State employees credit union interior demo; ee & pl permits under 02-2027:; building safety comments interior non-structural demoltion only. No occupancy under this permit. No demolition of fire separations. See "review comments" sheet fro addition information and requirements regarding demolition. Call harry taylor for building inspection at redacted phone number all subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits.; wnc air pollution approved by mike matthews recd fax Date: May 17, 2002 Permit type: Com: demo | Permit status: Closed | Permit id: 02-01989 | Parcel: 17109 | |||||
SCORE 98 Comment date: mon may 13 00:00: edt 2002 - state employees credit union - atm; comment date: tue may 14 00:00: edt 2002 - p&z#02-11062; comment date: wed jul 00:00: edt 2002 - recd amendment to add ca Client: State Employees | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-02027 | Parcel: 17109 | |||||
SCORE 99 February 29, 2012 2:36:52 pm mlipe. Replacing recessed lighting with surface-mount lighting (outside entrance) one oak plz main entrance rec via walk in, for inspections please call 828-redacted phone number by 4:30pm the day before per mark matheny, full cutoff feature required Date: April 5, 2012 Contractor: Grove Electric Client: One Oak Plz Main Entrance | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01087 | Parcel: 485028 | |||||
SCORE 99 Comment date: fri may 00:00: edt 2002 - state employees credit union interior demo; comment date: thu aug 15 00:00: edt 2002 - ee & pl permits under 02-2027:; comment date: tue may 14 00:00: edt 2002 Client: State Employees Interior | Permit type: Com: demo | Permit status: Closed | Current use: Commercial | Permit id: 02-01989 | Parcel: 17109 | |||||
February 24, 20 2:18:58 pm ssalyer. Commercial interior demo for first baptist church building beside church which is the 5 oak building;unit 106 105 credit union 206 205 203 201 1st and 2nd floor hallways due to water damage;no repair work at this time for dry out only;coordinate work in the field;sls; building safety comments see the review comments sheet for additional information and requirements. Building code inspection requests must be received before 7: a. M.: phone: redacted phone number. Internet: go to www. Ashevillenc. Gov; select online services; select permit tracking help; select development & building permit tracking tool and enter permit # the building code inspectors assigned to this project can be reached on their cell: building - anne graham redacted phone number electrical - jay eichhorn redacted phone number plumbing mechanical gas piping - dan stewart redacted phone number Date: February 25, 2010 Permit type: Com: demo | Permit status: Closed | Permit id: 10-00999 | Parcel: 17109 | |||||
SCORE 100 February 17, 2011 9:20:41 am ajohnson. First baptist church (one oak plaza). Replacing air handler and condensor on the roof. Same for same. Rec. Walk-in. To schedule a inspection call (828)redacted phone number. Aet. Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-00887 | Parcel: 485028 | |||||
SCORE 100 April 5, 2012 9:07:22 am mlipe. Replacing heat pump outside on roof, and air handler inside above restroom first baptist church rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01833 | Parcel: 485028 | |||||
SCORE 100 October 12, 2012 10:08:56 am mlipe. Install fuse block in hvac unit on 2ed floor first baptist church rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before ref 12-1833 Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-05880 | Parcel: 485028 | |||||
SCORE 100 October 25, 2012 4:04:42 pm mlipe. Hooking up power to 3 heat pump units on first floor first baptist church rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-06122 | Parcel: 485028 | |||||
SCORE 100 October 22, 2012 9:08:15 am mlipe. Replacing 3 heat pump units on first floor first baptist church rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-06004 | Parcel: 485028 | |||||
SCORE 65 First baptist church - removal of existing facade and replace. Bld; need design professional plans. Need life safty plan. I discussed this with scott harrower march 20, 2006 2:45:05 pm markm; building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Failure to post approved permits & plans at site is a fine, fine must be paid before next inspection is requested. Building inspections contact harry taylor redacted phone number. ; fire marshal? S office plan review comments read attached fire prevention comment sheet the approved plans with the attached plan review comments are required to be on the job site at all times. Call for all fire inspections at 828-redacted phone number between the hours of 8: and 9: for a same day inspection. All calls received past 9: am will be scheduled for t Client: First Baptist Church Faca | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 06-01170 | Parcel: 17109 | |||||
SCORE 100 October 4, 2011 8:36:11 am jfortner. Replacing air handler and heat pump. Same for same. To schedule inspection call (828)redacted phone number, jlf Client: First Baptist Church | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-05701 | Parcel: 485028 | |||||
Finish line for mile running relay race (blue ridge relay) 11th year for finishing in asheville on september 12 6am to 9:30am set, 9:30am - 6:30pm runners finish, 6:30pm to 8:00pm breakdown and clean -up - 8 10x canopies, ft long finish line chute anchored on 4 corners with a single layer scaffold - 5 porta johns, electric for computer and sound system off generator Date: January 11, 2016 Permit type: Event-temporary use | Permit status: Expired | Permit id: 15-11395 | Parcel: 17109 |