Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Palantir t. I. On 3rd floor for existing tenant demo interior non-structural demising wall and add electrical outlets and dataports no exterior work. Permit status: Permit issued | Permit id: 15000-00695 | |||||
SCORE 93 12000-00704: deferred submittal for balcony guardrail calcs, exterior wall cladding, trellis heating unit and trellis Date: February 20, 2015 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 15rev-00099 | |||||
SCORE 93 Casa olga - boutique hotel: u&o and interior and exterior upgrade-remodel of an existing 8 story hotel; conversion to a boutique hotel with a restaurant and lobby in the first floor. Unreasonable hardship approved for doors at stairway 1 & 2, see attachments for copy of approval. Permit issued 4 5 13 pending health dept approval to be submitted at a later date. O. K. Per dc director see letter in attachments. Health dept approval letter received 6-17-13 see attachments. [deh #sr0839404] 07 30 13 main panel upgrade 12 amp breaker ar approved by gopal Date: March 29, 2012 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 12000-00704 | |||||
SCORE 96 Tenant improvement for existing "palantir" on third floor only (1948 sf); scope of work includes includes reconfiguring 3 offices and 1 conference room, no exterior changes Permit status: Approved | Permit id: 15000-00203 | |||||
SCORE 95 16-2104: revised restroom layout due to existing rebars . Date: May 3, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Permit issued | Permit id: 17rev-00265 | |||||
SCORE 95 Commercial interior non structural demo 6 sf 2nd floor offices Date: September 13, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Permit issued | Permit id: 17000-02182 | |||||
Application expired 4 17 13: the addition of an exit door and ada ramp at the back of 1 hamilton Date: April 17, 2012 Permit status: Fir - not approved | Permit id: 12000-00863 | |||||
SCORE 95 16000-02104: ammr: revision for double acting interior security gate swings out Date: February 22, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Permit issued | Permit id: 17rev-00101 | |||||
SCORE 93 12000-00704: revisions to relocate daylight points for roof drain through curb. Planter pot trays for restaurant sidewalk planters Date: February 11, 2014 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 14rev-00090 | |||||
SCORE 95 16000-02104: revision to add door in back house kitchen hall Date: April 26, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Permit issued | Permit id: 17rev-00252 | |||||
2 12 14: ammr cancelled by joe elliott-owners representative. 12-704: ammr for the use of a high-pressure decorative exterior grade compact laminate. (trespa meteon-kraft fr panel) up to 76 feet in height. Date: March 29, 2012 Permit status: Permit issued | Permit id: 12rev-00187 | |||||
SCORE 100 Palantir: 3rd floor remodel for existing tenant. Scope of work includes removing walls to create open office space and two conference rooms permit reactivated on 1 16 14, henry rafael Permit status: Permit issued | Permit id: 13000-01466 | |||||
SCORE 100 Tenant improvement office ~800sf includes renovation of lobby area. Permit status: Permit issued | Permit id: 14000-00156 | |||||
SCORE 93 12-704: install chandelier at lobby area. Date: December 18, 2013 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 13rev-00782 | |||||
SCORE 93 12000-00704: revision to spiral staircases structural detail changes in lobby to second floor mezzanine Date: October 8, 2013 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 13rev-00619 | |||||
SCORE 100 Tenant improvement (6000sf): demo of non-structural partitions, install (n) non-structural partitions, (n) elec and lighting, (n) finishes, (n) millwork desk, combining 3 suites into 2 suites on ground floor Date: May 6, 2013 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 13000-01219 | |||||
SCORE 100 Tenant improvement ~ 2000sf for "palantir technologies" includes new office layout on 4th floor with associated electrical and mechanical register relocation. Date: April 23, 2013 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 13000-01108 | |||||
SCORE 100 Demolition of non-structural partitions (2136 sf) Date: April 16, 2013 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 13000-01025 | |||||
SCORE 93 Exterior window replacement "casa olga" Date: August 24, 2012 Contractor: Build Group Inc Permit status: Permit issued | Permit id: 12000-02107 | |||||
SCORE 64 12-572: revised structural Date: November 29, 2012 Contractor: M J Mechanical Services Inc Permit status: Permit issued | Permit id: 12rev-00659 | |||||
SCORE 100 Remodel for existing "palantir". Includes new office spaces and associated electrical and mechanical. Date: October 2, 2012 Contractor: Novo Construction Inc Permit status: Gb - final not approved | Permit id: 12000-02474 | |||||
12-677: revision includes underground above ground sewer line. Revision scope of work was to add a 6-inch waste line. Date: July 27, 2012 Permit status: Permit issued | Permit id: 12rev-00415 | |||||
SCORE 64 Tenant improvement for existing "palantir" includes reconfiguring office space. Associated electrical, mechanical and plumbing. Date: September 12, 2012 Contractor: L And S Hallmark Const Permit status: Permit issued | Permit id: 12000-02281 | |||||
SCORE 100 Tenant improvement for existing tenant "palantir". Interior office remodel. Date: August 10, 2012 Contractor: Novo Construction Inc Permit status: Permit issued | Permit id: 12000-01980 | |||||
SCORE 64 Voidvoidvoidvoidvoidvoid tenant improvement for existing "palantir", includes new rear door and interior office configuration with associated electrical and mechanical. Date: July 13, 2012 Contractor: L And S Hallmark Const Permit status: Void | Permit id: 12000-01658 | |||||
Voluntary seismic upgrade. No exterior work. Ti under separate permit. Date: March 26, 2012 Permit status: Permit issued | Permit id: 12000-00677 | |||||
SCORE 64 Replacement of rooftop chiller Date: March 14, 2012 Contractor: M J Mechanical Services Inc Permit status: Bld - approved | Permit id: 12000-00572 | |||||
SCORE 59 Casa olga: interior non-structural demo permit for 8-floors (52,8 sf) Date: February 10, 2012 Contractor: Agjdvp Casa Olga L.P Permit status: Permit issued | Permit id: 12000-00335 | |||||
SCORE 95 16000-02104 nobu: revision minor exterior improvement to existing hotel with ground floor restaurant approved under 16pln-00368. Date: March 16, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Permit issued | Permit id: 17rev-00162 | |||||
17000-02182: revision to expand scope of interior non-structural demo to cover the rest of the 2nd floor Date: November 27, 2017 Permit status: Permit issued | Permit id: 17rev-00747 | |||||
Remodel of the third floor bathroom core (2 sf) for the existing tenant "palantir" Date: October 5, 2017 Value: $75,000 Permit status: Approved | Permit id: 17000-02350 | |||||
SCORE 95 16000-02104: revision to plumbing design. Includes routing in pt slab. Date: April 5, 2017 Contractor: Shawmut Woodworking And Supply Inc Permit status: Completed | Permit id: 17rev-00207 | |||||
SCORE 56 Exterior waterproofing repairs including work at planters, elevated decks, replacing brick and plaster. Permit status: Approved | Permit id: 17000-00799 | |||||
Update accessible 1nd floor restrooms. 280sf Date: October 12, 2017 Value: $75,000 Permit status: Approved | Permit id: 17000-02427 | |||||
SCORE 95 Nobu pa: remodel of two hotel rooms on the third floor for existing tenant (925 sf). Scope of work includes replacing plumbing fixtures, light fixtures, and doors. Scope of work includes replacing exterior deck material Permit status: Permit issued | Permit id: 17000-02356 | |||||
Palantir: commercial ti adding windows 1st-3rd floors. All on 2nd: upgrade (e) bathroom facilities, modifying (e) space to create open office area (n) lighting, modifying (e) ducting. Date: June 21, 2017 Value: $200,000 Permit status: In plan check | Permit id: 17000-01393 | |||||
SCORE 95 Nobu: ti and u&o for a 3257 sf restaurant on the first and second floor. 785 sf of guestrooms on the second floor convereted to back of house space. 3 23 17 add to scope, install of interior wall sign (lettering illuminated) r. O. Permit status: Finaled | Permit id: 16000-02104 | |||||
SCORE 95 Nobu: commercial ti and u&o (name change) 2 floors (1st-2nd) 1st floor - (n) lounge and remodel (e) restrooms 2nd floor - (n) reception area (n) conference rooms (n) office space and (n) restrooms. Scope is all interior work Permit status: Permit issued | Permit id: 17000-01637 | |||||
SCORE 92 Electrical for two illuminated signs. Planning approval under 17pln-00204 Date: July 17, 2017 Contractor: Integrated Sign Installations Inc Permit status: Permit issued | Permit id: 17000-01654 | |||||
SCORE 89 Test Date: July 10, 2017 Contractor: A Teichert And Son Inc Permit status: Finaled | Permit id: 17000-01597 | |||||
Nobu pa 12: exterior improvements include new facade finishes at 1st & 2nd floor. Replace ground floor storefront (at both hamilton and emerson entries) new floor finish at hamilton entry. New patio screens at balconies. Sidewalk replacement and tree replacement at emerson frontage. Date: January 3, 2018 Value: $600,000 Permit status: In plan check | Permit id: 18000-00031 |