Moss real estate holdings llc ![]() Permit type: Mechanical | Permit status: Closed | Permit id: 12-01665 |
SCORE 95 March 28, 2012 2:55:07 pm mlipe. Add 2 ton heat pump to mobile home moss real estate holdings llc rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before ![]() ![]() Client: Moss Real Estate Holdings | Permit type: Com: mechanical | Permit status: Closed | Current use: Commercial | Permit id: 12-01665 | Parcel: 20132 |
SCORE 95 March 28, 2012 2:55:07 pm mlipe. Add 2 ton heat pump to mobile home moss real estate holdings llc rec via fax, for inspections please call 828-redacted phone number by 4:30pm the day before ![]() ![]() Client: Moss Real Estate Holdings | Permit type: Com: mechanical | Permit status: Closed | Current use: Commercial | Permit id: 12-01665 | Parcel: 20132 |
Hawkins mh lot 1 ![]() Permit status: Closed | Permit id: 11-01459 |
SCORE 88 Hawkins mh lot 1 Client: Hawkins Mh Lot 1 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-01459 | Parcel: 20132 |
SCORE 100 Hawkins mh lot 1 Client: Hawkins Mh Lot 1 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-01459 | Parcel: 20132 |
Hawkins mh lot 1 ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 11-01459 |
March 18, 2011 1:51: pm kneel. Hawkins - mh lot 1 location: patton to n louisiana r on guess.; april 18, 2011 2:02:32 pm kneel. Hawkins - mh lot 1; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 11-01459 | Parcel: 20132 |
March 18, 2011 1:51: pm kneel. Hawkins - mh lot 1 location: patton to n louisiana r on guess.; april 18, 2011 2:02:32 pm kneel. Hawkins - mh lot 1; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been Permit type: Permits - historical | Permit status: Closed | Permit id: 11-01459 | Parcel: 20132 |