Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Replace flooring on front and rear porches, install new tile at existing 2nd floor bath shower Permit type: Addition/alteration | Completion date: March 8, 2013 | Current use: Two-family | Parcel: 23399 | |||||
SCORE 74 Gut and renovate existing bath in unit #1 by installing walk in shower, toilet, and sink as required. Drywall and finish as required along with ceramic tiling, electrical and plumbing in referenced unit #1 bath. Paint entire unit #1 apartment and refinish hardwood floors as required. Install vinyl flooring in kitchen and new counter tops as required in unit #1. Permit type: Addition/alteration | Completion date: January 9, 2014 | Current use: Two-family | Parcel: 26283 | |||||
SCORE 63 Partial demolition of 1 apartment. Installation of new wood siding, new roof, electrical upgrade, bathroom remodeling, kitchen remodeling, drywall, plastering, painting, misc. Rough carpentry. Permit type: Addition/alteration | Completion date: March 28, 2016 | Current use: Two-family | Parcel: 263106 | |||||
SCORE 100 Excavation Date: July 15, 2009 Contractor: Nstar Gas Permit id: Exc13422 | |||||
SCORE 74 Repair 1st floor damaged deck, stairs, and piers as required to code using pressure treated woods measuring 6x18 @ 32" elevation from grade. Further, we will replace existing rails with vinyl balusters and rails. Note: we will install three new footings piers @ 4 depth in 12" sona tubes 40 psi with calcium chloride additive to prohibit freezing before setting up cure. Permit type: Addition/alteration | Completion date: February 21, 2017 | Current use: Two-family | Permit id: 0 | Parcel: 26283 |