Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Electrical for new cabin #6 Date: January 13, 2014 Contractor: Bhc Construction Applicant: Harrison Lee | Permit status: Permisud | Permit id: 1401080010 | |||||
SCORE 98 New 2-story 1456 sf cabin (cabin 6) with 224 sf 2nd floor deck. 1st floor 728 sf: 3-bedrooms, 1-bath, 1-living room. 2nd fl 728 sf: 2-bedrooms, 1-bath, living room, and kitchen. Engineer: Bolton Engineering | Applicant: Harrison Lee | Permit status: Permisud | Expiration date: January 13, 2015 | Permit id: 1310220094 | |||||
SCORE 98 Construction of 6 new scout staff cabins, new retaining wall and grading for cabin stability drainage Date: January 2, 2014 Contractor: Sequoia Construction Applicant: Bolton Engineering Corporation | Permit status: Permisud | Expiration date: January 2, 2015 | Permit id: 1307290004 | |||||
SCORE 98 Installation of new septic system and subsequent connection to cabin Date: January 13, 2014 Contractor: Bhc Construction Applicant: Harrison Lee | Permit status: Permisud | Permit id: 1401080007 |