Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 New detention pond outlet tie-in to storm sewer in baseline. Tie into existing 12inch water main stub & install a 8inch meter vault. Date: March 8, 2010 Contractor: Ez Excavating Inc Client: R Name | Applicant: E-Z Excavating, Inc | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 100 Installation of new curbcut for access to new cu student housing Date: July 15, 2010 Contractor: Ez Excavating Inc Client: R Name | Applicant: E-Z Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Temporary closure, (w detour), of multi-use path along bear canyon creek at williams village for the installation of new 4inch irrigation pond fill line. Date: November 16, 2011 Contractor: Ez Excavating Inc Client: R Name | Applicant: E-Z Excavating, Inc | Permit type: Right-of-way | Permit status: Iss |