Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 South Capitol Street And Firth Sterling Avenue Se Washington Dc Dccr proposed to excavate 15 utility pothole locations for (tp-a through tp-o) located south of 29 south capitol street se. Each excavation will be less than 8 feet deep using vac truck. All drilling generated waste will be drummed (solids and liquids) for offsite disposal. The work will take up to two weeks to complete. The work zone will be removed at the end of each day, and will require modified work times of 8pm to 5am, and a dcra after hours permit will be obtained. This work will not impact trees, sidewalks or bus stops. Date: July 27, 2017 Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa219194 | |||||
SCORE 61 South Capitol Street And Firth Sterling Avenue Se Washington Dc Dccr proposed to excavate 15 utility pothole locations for (tp-a through tp-o) located south of 29 south capitol street se. Each excavation will be less than 8 feet deep using vac truck. All drilling generated waste will be drummed (solids and liquids) for offsite disposal. The work will take up to two weeks to complete. The work zone will be removed at the end of each day, and will require modified work times of 8pm to 5am, and a dcra after hours permit will be obtained. This work will not impact trees, sidewalks or bus stops. Date: July 18, 2017 Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa219194 | |||||
SCORE 61 South Capitol Street And Firth Sterling Avenue Se Washington Dc Dccr proposed to excavate 15 utility pothole locations for (tp-a through tp-o) located south of 29 south capitol street se. Each excavation will be less than 8 feet deep using vac truck. All drilling generated waste will be drummed (solids and liquids) for offsite disposal. The work will take up to two weeks to complete. The work zone will be removed at the end of each day, and will require modified work times of 8pm to 5am, and a dcra after hours permit will be obtained. This work will not impact trees, sidewalks or bus stops. Client: Dc Water Carlton Ray Co Christopher Gerber | Permit type: Excavation; boring test pit (each addl) | Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa219194-R1 |