Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 3418 4th St Se, Washington, Dc 20032 The work will involve advancing fourteen soil borings on the site, four of which will be converted into groundwater monitoring wells. All borings will be installed via direct push technology using a truck-mounted geoprobe. Five of the borings will be advanced to 4 ft. Bgs. And five of the borings will be advanced to groundwater depth or to refusal, whichever is encountered first. See attached work plan. Date: August 26, 2015 Contractor: Megghan Oksanen Froehling And Robertson In Client: Pam Jones The Southwest Church Of Christ | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500414 |