Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 31 Repplier St Boulder Co Installation of a flush mount, grid-tied, 6. 6 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: February 4, 2014 Contractor: Golden Solar Electric Llc Client: Len Berg | Applicant: Golden Solar Electric, Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2014 | Current use: Single family d | |||||
SCORE 59 1901 N 63rd St Boulder Co Installation of a new 175 kw low angle (5 degree tilt) grid tied pv system on the boulder county recycling facility (east building). Date: July 1, 2014 Contractor: Golden Solar Electric Llc Client: County Boulder | Applicant: Golden Solar Electric, Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2014 | Current use: Government uses |