Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 691 14th St Nw, Atlanta, Ga 30318 Electrical installation on new construction temporary power for bldg 1 Date: October 14, 2013 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201308626 | |||||
SCORE 99 Date: April 2, 2013 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201302589 | |||||
SCORE 99 Date: January 31, 2013 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201300793 | |||||
SCORE 99 Date: January 28, 2013 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201300792 | |||||
SCORE 99 Date: November 27, 2012 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201209378 | |||||
SCORE 99 Date: September 26, 2012 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201207797 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 29, 2006 | Permit id: Bs06-3171 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 22, 2006 | Permit id: Bs06-3157 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 14, 2006 | Permit id: Bs06-3127 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3337 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 30, 2005 | Permit id: Bs05-2360 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 6, 2005 | Permit id: Bs05-2348 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 6, 2005 | Permit id: Bs05-1718 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2334 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 8, 2005 | Permit id: Bs05-1762 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: June 14, 2007 | Permit id: Bs06-4693 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-0575 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 7, 2006 | Permit id: Bs06-0570 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 13, 2006 | Permit id: Bs06-3141 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 6, 2005 | Permit id: Bs05-2343 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1872 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 5, 2008 | Permit id: Bs07-1831 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs07-1618 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 9, 2005 | Permit id: Bs05-3183 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: June 14, 2007 | Permit id: Bs06-4695 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 16, 2007 | Permit id: Bs06-4694 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-5002 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4990 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-4999 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: August 30, 2007 | Permit id: Bs06-4686 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: August 30, 2007 | Permit id: Bs06-4685 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2513 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4457 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 14, 2006 | Permit id: Bs06-3128 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 28, 2006 | Permit id: Bs06-3172 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2805 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2808 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 15, 2006 | Permit id: Bs06-2523 | |||||
SCORE 99 Date: September 20, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 28, 2005 | Permit id: Bs05-4029 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-5001 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 20, 2005 | Permit id: Bs05-3328 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3350 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2349 | |||||
SCORE 99 Date: May 7, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: November 13, 2008 | Permit id: Bs07-1297 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 21, 2006 | Permit id: Bs06-1793 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 10, 2006 | Permit id: Bs06-1795 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 30, 2005 | Permit id: Bs05-3319 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4456 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 14, 2005 | Permit id: Bs05-4227 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: January 30, 2006 | Permit id: Bs05-2979 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: August 31, 2005 | Permit id: Bs05-3178 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 1, 2005 | Permit id: Bs05-1700 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4977 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: September 1, 2005 | Permit id: Bs05-1739 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 25, 2006 | Permit id: Bs05-3341 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs06-4449 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 3, 2005 | Permit id: Bs05-4167 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4978 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3166 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1868 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 30, 2005 | Permit id: Bs05-2352 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 9, 2005 | Permit id: Bs05-3184 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3364 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 13, 2005 | Permit id: Bs05-2335 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: August 31, 2005 | Permit id: Bs05-3180 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs05-3179 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3347 | |||||
SCORE 99 Date: September 23, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 28, 2005 | Permit id: Bs05-4082 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 4, 2005 | Permit id: Bs05-2311 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3368 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 9, 2005 | Permit id: Bs05-3369 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 31, 2006 | Permit id: Bs06-1742 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Expired | Permit id: Bs05-4162 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2804 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 26, 2006 | Permit id: Bs06-3164 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4995 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: June 6, 2007 | Permit id: Bs06-5163 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1867 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 31, 2007 | Permit id: Bs07-1624 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 31, 2007 | Permit id: Bs07-1625 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 23, 2006 | Permit id: Bs06-2512 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs06-2816 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: Bs06-3129 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 3, 2008 | Permit id: Bs07-1879 | |||||
SCORE 99 Date: July 28, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: September 19, 2005 | Permit id: Bs05-3089 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 9, 2005 | Permit id: Bs05-3181 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3332 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Expired | Permit id: Bs05-4229 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4984 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-5004 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 10, 2006 | Permit id: Bs06-0576 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 31, 2006 | Permit id: Bs06-1746 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2515 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 16, 2006 | Permit id: Bs06-2533 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-2534 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 23, 2007 | Permit id: Bs06-4463 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs07-1075 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 26, 2005 | Permit id: Bs05-1696 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: December 2, 2005 | Permit id: Bs05-1738 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: December 2, 2005 | Permit id: Bs05-1765 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2295 | |||||
SCORE 99 Date: June 16, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2355 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 30, 2005 | Permit id: Bs05-2354 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2981 | |||||
SCORE 99 Date: July 28, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: September 19, 2005 | Permit id: Bs05-3088 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 2, 2005 | Permit id: Bs05-3187 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 9, 2005 | Permit id: Bs05-3188 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 30, 2005 | Permit id: Bs05-3318 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3365 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Expired | Permit id: Bs05-4165 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 23, 2005 | Permit id: Bs05-4224 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4973 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-5003 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-1731 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 31, 2006 | Permit id: Bs06-1745 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 10, 2006 | Permit id: Bs06-1794 | |||||
SCORE 99 Date: May 22, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Expired | Permit id: Bs06-2163 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 16, 2006 | Permit id: Bs06-2539 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-2813 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 13, 2006 | Permit id: Bs06-3140 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3154 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 28, 2006 | Permit id: Bs06-3169 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 4, 2008 | Permit id: Bs07-1834 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 4, 2008 | Permit id: Bs07-1833 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 8, 2005 | Permit id: Bs05-4226 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4991 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: July 12, 2005 | Permit id: Bs05-1736 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 26, 2005 | Permit id: Bs05-2298 | |||||
SCORE 99 Date: June 15, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2304 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 23, 2005 | Permit id: Bs05-3375 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4994 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2544 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: Bs06-2547 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4441 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 8, 2005 | Permit id: Bs05-1704 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 7, 2005 | Permit id: Bs05-1702 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 6, 2005 | Permit id: Bs05-1715 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 26, 2005 | Permit id: Bs05-1727 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 24, 2005 | Permit id: Bs05-1724 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 26, 2005 | Permit id: Bs05-1721 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 17, 2005 | Permit id: Bs05-1729 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 8, 2005 | Permit id: Bs05-1734 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: December 2, 2005 | Permit id: Bs05-1741 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 7, 2005 | Permit id: Bs05-1742 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 19, 2005 | Permit id: Bs05-1732 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 8, 2005 | Permit id: Bs05-1764 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 4, 2005 | Permit id: Bs05-1766 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2289 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 30, 2005 | Permit id: Bs05-2309 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2306 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2310 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2321 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 6, 2005 | Permit id: Bs05-2323 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 6, 2005 | Permit id: Bs05-2319 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 13, 2005 | Permit id: Bs05-2332 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2340 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 13, 2005 | Permit id: Bs05-2341 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 13, 2005 | Permit id: Bs05-2337 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2358 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 30, 2005 | Permit id: Bs05-2350 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2356 | |||||
SCORE 99 Date: July 20, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs05-2926 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2984 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2983 | |||||
SCORE 99 Date: July 28, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: September 19, 2005 | Permit id: Bs05-3087 | |||||
SCORE 99 Date: July 28, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: September 19, 2005 | Permit id: Bs05-3090 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: August 31, 2005 | Permit id: Bs05-3177 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 2, 2005 | Permit id: Bs05-3176 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 9, 2005 | Permit id: Bs05-3185 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3322 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 10, 2006 | Permit id: Bs05-3335 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3323 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3331 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3320 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 20, 2005 | Permit id: Bs05-3329 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 10, 2006 | Permit id: Bs05-3334 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 20, 2005 | Permit id: Bs05-3330 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3338 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3327 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3346 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 25, 2006 | Permit id: Bs05-3339 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3351 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3355 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 18, 2006 | Permit id: Bs05-3352 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3360 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 30, 2005 | Permit id: Bs05-3373 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3366 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 23, 2005 | Permit id: Bs05-3374 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 9, 2005 | Permit id: Bs05-3370 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3363 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 30, 2005 | Permit id: Bs05-3372 | |||||
SCORE 99 Date: August 29, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs05-3656 | |||||
SCORE 99 Date: August 29, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: March 14, 2006 | Permit id: Bs05-3655 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 28, 2005 | Permit id: Bs05-4168 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 28, 2005 | Permit id: Bs05-4166 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 14, 2005 | Permit id: Bs05-4225 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 10, 2005 | Permit id: Bs05-4220 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 10, 2005 | Permit id: Bs05-4219 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 18, 2005 | Permit id: Bs05-4228 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 8, 2005 | Permit id: Bs05-4221 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 16, 2005 | Permit id: Bs05-4223 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 16, 2005 | Permit id: Bs05-4230 | |||||
SCORE 99 Date: October 6, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: January 25, 2006 | Permit id: Bs05-4290 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4957 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4958 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4959 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4963 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4964 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4965 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4966 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 2, 2006 | Permit id: Bs05-4967 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4975 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4969 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4970 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4968 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4971 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4998 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4982 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4979 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4993 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Expired | Permit id: Bs05-4986 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4980 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4992 | |||||
SCORE 99 Date: February 13, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0534 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0573 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0574 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 5, 2006 | Permit id: Bs06-0569 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0572 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0567 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0571 | |||||
SCORE 99 Date: February 22, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: March 2, 2006 | Permit id: Bs06-0666 | |||||
SCORE 99 Date: March 29, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 2, 2006 | Permit id: Bs06-1302 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 31, 2006 | Permit id: Bs06-1743 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: Bs06-1749 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: Bs06-1735 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 31, 2006 | Permit id: Bs06-1747 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 10, 2006 | Permit id: Bs06-1734 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: Bs06-1786 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 21, 2006 | Permit id: Bs06-1791 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 21, 2006 | Permit id: Bs06-1792 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 25, 2006 | Permit id: Bs06-1789 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: Bs06-1784 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: Bs06-1785 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: Bs06-1787 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-1796 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-1797 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1870 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1869 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 23, 2006 | Permit id: Bs06-2519 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 25, 2006 | Permit id: Bs06-2509 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 17, 2006 | Permit id: Bs06-2510 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2516 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 25, 2006 | Permit id: Bs06-2508 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 10, 2006 | Permit id: Bs06-2517 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: Bs06-2532 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2514 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 28, 2006 | Permit id: Bs06-2531 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 23, 2006 | Permit id: Bs06-2521 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 23, 2006 | Permit id: Bs06-2536 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 28, 2006 | Permit id: Bs06-2529 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 28, 2006 | Permit id: Bs06-2530 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 15, 2007 | Permit id: Bs06-2528 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2543 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 28, 2006 | Permit id: Bs06-2537 | |||||
SCORE 99 Date: June 13, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 10, 2006 | Permit id: Bs06-2628 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 14, 2006 | Permit id: Bs06-2807 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2809 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2817 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs06-2810 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs06-2814 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 14, 2006 | Permit id: Bs06-2818 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs06-2812 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 14, 2006 | Permit id: Bs06-2815 | |||||
SCORE 99 Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-3131 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 18, 2006 | Permit id: Bs06-3132 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-3143 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 18, 2006 | Permit id: Bs06-3156 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3151 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 1, 2006 | Permit id: Bs06-3148 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-3145 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 22, 2006 | Permit id: Bs06-3142 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 30, 2006 | Permit id: Bs06-3149 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 30, 2006 | Permit id: Bs06-3152 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 1, 2006 | Permit id: Bs06-3147 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 18, 2006 | Permit id: Bs06-3155 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-3144 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 30, 2006 | Permit id: Bs06-3150 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3158 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 21, 2006 | Permit id: Bs06-3163 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-3167 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-3160 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3165 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 30, 2006 | Permit id: Bs06-3162 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 26, 2006 | Permit id: Bs06-3168 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: Bs06-3159 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: Bs06-3170 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4444 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4443 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4445 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 10, 2007 | Permit id: Bs06-4453 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-4450 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-4447 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4446 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-4448 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4460 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4461 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 10, 2007 | Permit id: Bs06-4454 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4464 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4458 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 23, 2007 | Permit id: Bs06-4459 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4465 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4467 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4455 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs06-4688 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4687 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-4689 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-4684 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2007 | Permit id: Bs06-4691 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4702 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs06-4699 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 10, 2007 | Permit id: Bs06-4698 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 2, 2007 | Permit id: Bs06-4700 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs06-4701 | |||||
SCORE 99 Date: November 6, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: March 14, 2007 | Permit id: Bs06-4744 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-5165 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 16, 2007 | Permit id: Bs06-5162 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-5164 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 3, 2007 | Permit id: Bs06-5166 | |||||
SCORE 99 Client: Brumback, Kevin | Permit status: Finaled | Completion date: June 5, 2008 | Permit id: Bs07-0878 | |||||
SCORE 99 Date: April 10, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs07-0989 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs07-1077 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: August 30, 2007 | Permit id: Bs07-1079 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs07-1074 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: August 30, 2007 | Permit id: Bs07-1080 | |||||
SCORE 99 Date: May 7, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs07-1299 | |||||
SCORE 99 Date: May 7, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs07-1298 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 31, 2007 | Permit id: Bs07-1626 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs07-1616 | |||||
SCORE 99 Date: June 14, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: December 13, 2007 | Permit id: Bs07-1819 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 4, 2008 | Permit id: Bs07-1835 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: January 30, 2008 | Permit id: Bs07-1832 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: August 1, 2008 | Permit id: Bs07-1842 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1880 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: May 8, 2008 | Permit id: Bs07-1875 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: May 8, 2008 | Permit id: Bs07-1887 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: April 10, 2008 | Permit id: Bs07-1873 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1881 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: August 13, 2008 | Permit id: Bs07-1871 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 5, 2008 | Permit id: Bs07-1876 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs07-1619 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 4, 2006 | Permit id: Bs05-5000 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 7, 2005 | Permit id: Bs05-2327 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 13, 2005 | Permit id: Bs05-2339 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 5, 2008 | Permit id: Bs07-1874 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 2, 2006 | Permit id: Bs06-1750 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 24, 2005 | Permit id: Bs05-1698 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 10, 2006 | Permit id: Bs05-3336 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 25, 2006 | Permit id: Bs06-1788 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3353 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: June 6, 2007 | Permit id: Bs06-4696 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 10, 2005 | Permit id: Bs05-1707 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: October 31, 2008 | Permit id: Bs07-1836 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4462 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 24, 2007 | Permit id: Bs06-5161 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4690 | |||||
SCORE 99 Date: February 13, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0535 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 15, 2006 | Permit id: Bs06-2811 | |||||
SCORE 99 Date: April 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit type: Electrical | Permit status: Finaled | Completion date: September 10, 2007 | Permit id: Bs07-1073 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 31, 2007 | Permit id: Bs07-1623 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: Bs06-2546 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4452 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 24, 2006 | Permit id: Bs05-4983 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: Bs06-2545 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 31, 2006 | Permit id: Bs06-2511 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 10, 2006 | Permit id: Bs06-1741 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs07-1614 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: November 29, 2005 | Permit id: Bs05-3182 | |||||
SCORE 99 Date: May 30, 2007 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 31, 2007 | Permit id: Bs07-1622 | |||||
SCORE 99 Date: March 4, 2008 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Expired | Permit id: Bs08-0462 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit type: Electrical | Permit status: Finaled | Completion date: September 2, 2005 | Permit id: Bs05-3186 | |||||
SCORE 99 Date: June 21, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: October 25, 2006 | Permit id: Bs06-2806 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3359 | |||||
SCORE 99 Date: September 23, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 28, 2005 | Permit id: Bs05-4081 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1868 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 26, 2006 | Permit id: Bs06-3161 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-1733 | |||||
SCORE 99 Date: September 28, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: November 8, 2005 | Permit id: Bs05-4164 | |||||
SCORE 99 Date: April 24, 2006 Contractor: Crouch And Western Inc Client: Habitat For Humanity | Permit type: Electrical | Permit status: Finaled | Completion date: June 9, 2006 | Permit id: Bs06-1636 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 12, 2006 | Permit id: Bs05-4972 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2980 | |||||
SCORE 99 Date: June 15, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 4, 2008 | Permit id: Bs07-1841 | |||||
SCORE 99 Date: July 13, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 10, 2005 | Permit id: Bs05-1713 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: September 10, 2007 | Permit id: Bs06-4451 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1878 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3367 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3333 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 25, 2006 | Permit id: Bs05-3342 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: November 28, 2005 | Permit id: Bs05-1761 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 15, 2006 | Permit id: Bs06-2522 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 8, 2008 | Permit id: Bs07-1870 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Expired | Permit id: Bs05-4988 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4997 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: April 1, 2008 | Permit id: Bs07-1886 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 4, 2008 | Permit id: Bs07-1884 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: October 6, 2005 | Permit id: Bs05-2315 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4996 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1871 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3362 | |||||
SCORE 99 Date: February 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: April 19, 2006 | Permit id: Bs06-0566 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 14, 2005 | Permit id: Bs05-3321 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 25, 2006 | Permit id: Bs05-3343 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: August 1, 2008 | Permit id: Bs07-1888 | |||||
SCORE 99 Date: December 14, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 30, 2007 | Permit id: Bs06-5167 | |||||
SCORE 99 Date: May 4, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-1866 | |||||
SCORE 99 Date: July 25, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: July 27, 2005 | Permit id: Bs05-2982 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: November 16, 2005 | Permit id: Bs05-4231 | |||||
SCORE 99 Date: October 3, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Expired | Permit id: Bs05-4222 | |||||
SCORE 99 Date: June 24, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: December 2, 2005 | Permit id: Bs05-1733 | |||||
SCORE 99 Date: August 2, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: September 22, 2005 | Permit id: Bs05-2302 | |||||
SCORE 99 Date: November 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4692 | |||||
SCORE 99 Date: August 10, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: December 9, 2005 | Permit id: Bs05-3371 | |||||
SCORE 99 Date: August 9, 2005 Contractor: Crouch And Western Inc Client: Atkins, Clinton C | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: Bs05-3357 | |||||
SCORE 99 Date: October 24, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Void | Permit id: Bs06-4580 | |||||
SCORE 99 Date: June 18, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: September 5, 2008 | Permit id: Bs07-1877 | |||||
SCORE 99 Date: May 1, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: December 29, 2006 | Permit id: Bs06-1790 | |||||
SCORE 99 Date: November 23, 2005 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: May 18, 2006 | Permit id: Bs05-4974 | |||||
SCORE 99 Date: October 12, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 30, 2007 | Permit id: Bs06-4466 | |||||
SCORE 99 Date: July 11, 2005 Contractor: Crouch And Western Inc Client: Atkins Group | Permit status: Finaled | Completion date: August 8, 2005 | Permit id: Bs05-1760 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: October 18, 2006 | Permit id: Bs06-3153 | |||||
SCORE 99 Date: June 8, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: August 30, 2006 | Permit id: Bs06-2542 | |||||
SCORE 99 Date: July 10, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit type: Electrical | Permit status: Finaled | Completion date: September 18, 2006 | Permit id: Bs06-3130 | |||||
SCORE 99 Date: April 28, 2006 Contractor: Crouch And Western Inc Client: The Atkins Group | Permit status: Finaled | Completion date: July 5, 2006 | Permit id: Bs06-1732 | |||||
SCORE 99 Date: June 19, 2007 Contractor: Crouch And Western Inc Client: Tag Ashland Park | Permit status: Finaled | Completion date: May 8, 2008 | Permit id: Bs07-1882 | |||||
SCORE 99 Date: December 15, 2014 Contractor: Crouch And Western Inc Permit type: Commercial electrical | Permit status: Expired - not issued | Current use: Commercial | Permit id: 20140609314 | Parcel: 402121481004 | |||||
SCORE 99 Date: August 15, 2006 Contractor: Crouch And Western Inc Permit id: El2006-14925 | Parcel: 91210647700 | |||||
SCORE 99 Date: August 15, 2006 Contractor: Crouch And Western Inc Permit id: El2006-14926 | Parcel: 91210647713 | |||||
SCORE 99 Date: September 27, 2006 Contractor: Crouch And Western Inc Permit id: El2006-14977 | Parcel: 91210647700 | |||||
SCORE 99 Date: December 15, 2014 Contractor: Crouch And Western Inc Permit type: Electrical | Permit status: Expired - not issued | Permit id: 20140609314 | Parcel: 402121481004 |