Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 125 1st Ave Ne Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 4. 48 kw solar array on west facing roof of the garage Date: July 13, 2016 Contractor: Crabtree Scott Permit type: Electrical | Permit status: Permit closed | Completion date: July 22, 2016 | Expiration date: July 13, 2017 | Current use: Single family / duplex | Permit id: 6545937 |