Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 87 Applicant: Gillermo Najar | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0406010085 | |||||
SCORE 87 Applicant: Gillermo Najar | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0406010086 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020015 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020021 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020023 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020024 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020025 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020026 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020028 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020029 | |||||
SCORE 87 Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020035 | |||||
SCORE 87 Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0412140031 | |||||
SCORE 87 Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Permit id: 0412140032 | |||||
SCORE 87 Applicant: Abell Helou Homes - Guillermo Najar | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0412140033 | |||||
SCORE 87 Applicant: Guillermo Najar | Permit status: Finaled | Completion date: September 27, 2006 | Permit id: 0502140041 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0512190077 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0512190078 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0512190079 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0512190080 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0512190081 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: 0512190082 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0512190083 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0512190084 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0512190085 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Permit id: 0512190086 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Permisud | Permit id: 0512190087 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0601310010 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0601310011 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0601310012 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0601310059 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0601310060 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0601310061 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0601310062 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0601310063 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0601310064 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0601310065 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 22, 2006 | Permit id: 0601310066 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0601310067 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0601310068 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: 0601310069 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0601310070 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0601310071 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0601310072 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0601310073 | |||||
SCORE 87 Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0601310074 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606260060 | |||||
SCORE 87 Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0606260061 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606260062 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606260066 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606260067 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0606260068 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Permit id: 0606260069 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Permit id: 0606260070 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0606260071 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606260072 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606260073 | |||||
SCORE 87 Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Permit id: 0606260074 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409020013 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210036 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210037 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210038 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210039 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210040 | |||||
SCORE 87 Date: October 25, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210043 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210044 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260047 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260048 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Permit id: 0508260049 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030023 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030024 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Permit id: 0601030025 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Permit id: 0601030026 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030027 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 13, 2006 | Permit id: 0601030030 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030031 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0601030032 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0601030033 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: 0601030034 | |||||
SCORE 87 Date: February 2, 2006 Contractor: Abellhelou Homes Inc Applicant: Garcia Emigdio | Permit status: Finaled | Completion date: October 3, 2006 | Permit id: 0602020026 | |||||
SCORE 87 Date: February 2, 2006 Contractor: Abellhelou Homes Inc Applicant: Garcia Emigdio | Permit status: Finaled | Completion date: July 26, 2006 | Permit id: 0602020031 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030023 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030024 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030025 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030026 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030027 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: 0602030028 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030029 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030030 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030032 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030033 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030034 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030035 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030036 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030039 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030040 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030041 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0602030042 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0606290039 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0606290041 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Permit id: 0606290043 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Permit id: 0606290044 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606290045 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606290046 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Permit id: 0606290047 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Permit id: 0606290048 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0606290049 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Permit id: 0606290050 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Permit id: 0606290051 | |||||
SCORE 87 Date: June 30, 2005 Contractor: Abellhelou Homes Inc Applicant: Jong Hank | Permit status: Finaled | Completion date: November 19, 2008 | Permit id: 0410120003 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210012 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210013 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210014 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210015 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210016 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210017 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210019 | |||||
SCORE 87 Date: October 22, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0410210020 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260030 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260032 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Permit id: 0508260033 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030013 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030016 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030017 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Permit id: 0601030018 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Permit id: 0601030019 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030020 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 13, 2006 | Permit id: 0601030021 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0601030023 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: 0601030025 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030012 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030013 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030014 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030015 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030016 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: 0602030017 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030018 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030019 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030020 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2007 | Permit id: 0602030021 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030022 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030023 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030024 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030027 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030028 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030029 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0602030030 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0606300001 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300003 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300004 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300005 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300006 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Permit id: 0606300008 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0606300009 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Permit id: 0606300010 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606300011 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606300012 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Permit id: 0606300013 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070019 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070020 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070021 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070022 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070023 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070024 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070026 | |||||
SCORE 87 Date: September 8, 2004 Contractor: Abellhelou Homes Inc Applicant: Latham Don | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0409070027 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260025 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0508260027 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Permit id: 0508260028 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030017 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030019 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030020 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Permit id: 0601030021 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Permit id: 0601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030023 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Permit id: 0601030024 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0601030025 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Permit id: 0601030026 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Permit id: 0601030028 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030030 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030033 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Permit id: 0602030034 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030035 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030036 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: 0602030037 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0602030038 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030039 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030040 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030041 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030042 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030043 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Permit id: 0602030044 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030047 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0602030048 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0602030049 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0602030050 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0606300005 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300027 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Permit id: 0606300029 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606300030 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300031 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300032 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0606300034 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Permit id: 0606300035 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0606300036 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0606300037 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Permit id: 0606300038 | |||||
SCORE 87 Date: January 11, 2005 Contractor: Abellhelou Homes Inc Applicant: Gillermo Najar | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070005 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070007 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070009 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070010 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070011 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070012 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070014 | |||||
SCORE 87 Date: January 10, 2005 Contractor: Abellhelou Homes Inc Applicant: Beatty Roger | Permit status: Finaled | Completion date: April 19, 2005 | Permit id: 0501070015 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0606230006 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Permisud | Permit id: 0606230007 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230008 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230009 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0606230010 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Permit id: 0606230011 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230012 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230013 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Permisud | Permit id: 0606230014 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230016 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230017 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230018 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 3, 2007 | Permit id: 0606230020 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230021 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230022 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0606230023 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 7, 2006 | Permit id: 0606230025 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230027 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2007 | Permit id: 0606230028 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0606230029 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0606230030 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0606230031 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Permit id: 0606230032 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0606230033 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0606230034 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0606230035 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 20, 2006 | Permit id: 0606230036 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Permit id: 0606230037 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 15, 2006 | Permit id: 0606230038 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Permit id: 0607030001 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0607030002 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0607030003 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Permit id: 0607030005 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Permit id: 0607030007 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Permit id: 0607030008 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Permit id: 0607030009 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0607030010 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Permit id: 0607030011 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Permit id: 0607030012 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 13, 2006 | Expiration date: July 2, 2006 | Permit id: 601030021 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: December 30, 2006 | Permit id: 606290039 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606290045 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: December 16, 2006 | Permit id: 512190084 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Expiration date: December 16, 2006 | Permit id: 512190082 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: December 16, 2006 | Permit id: 512190081 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: December 16, 2006 | Permit id: 512190080 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: December 16, 2006 | Permit id: 512190078 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: December 16, 2006 | Permit id: 512190077 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030024 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260032 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: August 8, 2006 | Permit id: 602030042 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Expiration date: December 30, 2006 | Permit id: 606290044 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030023 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Expiration date: December 30, 2006 | Permit id: 606290043 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 16, 2006 | Permit id: 512190083 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: December 30, 2006 | Permit id: 606290041 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030024 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310010 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: February 2, 2007 | Permit id: 601310011 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310012 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: February 2, 2007 | Permit id: 601310059 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: February 2, 2007 | Permit id: 601310060 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310061 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310062 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: February 2, 2007 | Permit id: 601310063 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: February 2, 2007 | Permit id: 601310064 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: February 2, 2007 | Permit id: 601310065 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 22, 2006 | Expiration date: February 2, 2007 | Permit id: 601310066 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310067 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: February 2, 2007 | Permit id: 601310068 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Expiration date: February 2, 2007 | Permit id: 601310069 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: February 2, 2007 | Permit id: 601310070 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: February 2, 2007 | Permit id: 601310071 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: February 2, 2007 | Permit id: 601310072 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: February 2, 2007 | Permit id: 601310073 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: February 2, 2007 | Permit id: 601310074 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 16, 2006 | Permit id: 512190079 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030012 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030013 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030014 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030015 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030016 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Expiration date: August 8, 2006 | Permit id: 602030017 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030018 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030019 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030020 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2007 | Expiration date: August 8, 2006 | Permit id: 602030021 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030022 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030023 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Expiration date: February 27, 2006 | Permit id: 508260033 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030023 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030024 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Expiration date: July 2, 2006 | Permit id: 601030025 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Expiration date: July 2, 2006 | Permit id: 601030026 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030027 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 13, 2006 | Expiration date: July 2, 2006 | Permit id: 601030030 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030031 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: July 2, 2006 | Permit id: 601030032 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: July 2, 2006 | Permit id: 601030033 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Expiration date: July 2, 2006 | Permit id: 601030034 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260030 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: July 2, 2006 | Permit id: 601030023 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Expiration date: July 2, 2006 | Permit id: 601030025 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300027 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Expiration date: December 30, 2006 | Permit id: 606300029 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 606300030 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: December 30, 2006 | Permit id: 606300005 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030042 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030043 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030044 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030047 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030048 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030049 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: August 8, 2006 | Permit id: 602030050 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030041 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030030 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030033 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030034 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030035 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030036 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Expiration date: August 8, 2006 | Permit id: 602030037 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030038 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030039 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030040 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030025 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 11, 2006 | Expiration date: July 2, 2006 | Permit id: 601030026 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: August 8, 2006 | Expiration date: July 2, 2006 | Permit id: 601030028 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030024 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030017 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030019 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030020 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Expiration date: July 2, 2006 | Permit id: 601030021 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Expiration date: July 2, 2006 | Permit id: 601030022 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030023 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: June 28, 2007 | Permit id: 606260062 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: June 28, 2007 | Permit id: 606260066 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: June 28, 2007 | Permit id: 606260067 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: June 28, 2007 | Permit id: 606260068 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Expiration date: June 28, 2007 | Permit id: 606260069 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Expiration date: June 28, 2007 | Permit id: 606260070 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: June 28, 2007 | Permit id: 606260071 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: June 28, 2007 | Permit id: 606260072 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: June 28, 2007 | Permit id: 606260073 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Expiration date: June 28, 2007 | Permit id: 606260074 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300031 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300032 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300034 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Expiration date: December 30, 2006 | Permit id: 606300035 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: December 30, 2006 | Permit id: 606300036 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 606300037 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Expiration date: December 30, 2006 | Permit id: 606300038 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260047 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260048 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Expiration date: February 27, 2006 | Permit id: 508260049 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: December 30, 2006 | Permit id: 606300001 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300003 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300004 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300005 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606300006 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Expiration date: December 30, 2006 | Permit id: 606300008 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: December 30, 2006 | Permit id: 606300009 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Expiration date: December 30, 2006 | Permit id: 606300010 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 606300011 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 6, 2006 | Expiration date: August 8, 2006 | Permit id: 602030025 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030026 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030027 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 15, 2006 | Expiration date: August 8, 2006 | Permit id: 602030028 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030029 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030030 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030032 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030033 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030034 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030035 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 7, 2006 | Expiration date: August 8, 2006 | Permit id: 602030036 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030039 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030040 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030041 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: June 28, 2007 | Permit id: 606260060 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: June 28, 2007 | Permit id: 606260061 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030027 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: August 8, 2006 | Permit id: 602030028 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: August 8, 2006 | Permit id: 602030029 | |||||
SCORE 87 Date: February 9, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: August 8, 2006 | Permit id: 602030030 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030013 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030016 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: July 2, 2006 | Permit id: 601030017 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Expiration date: July 2, 2006 | Permit id: 601030018 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Permisud | Expiration date: July 2, 2006 | Permit id: 601030019 | |||||
SCORE 87 Date: January 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 12, 2006 | Expiration date: July 2, 2006 | Permit id: 601030020 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: August 26, 2006 | Permit id: 412140031 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Expiration date: August 26, 2006 | Permit id: 412140032 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Abell Helou Homes - Guillermo Najar | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: August 26, 2006 | Permit id: 412140033 | |||||
SCORE 87 Date: April 14, 2004 Contractor: Abellhelou Homes Inc Engineer: John Abell | Applicant: Abell- Helou | Permit status: Finaled | Completion date: May 11, 2006 | Expiration date: October 11, 2004 | Permit id: 310290002 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 16, 2006 | Permit id: 512190085 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Finaled | Completion date: July 7, 2006 | Expiration date: December 16, 2006 | Permit id: 512190086 | |||||
SCORE 87 Engineer: Architrans - Binn Tran | Applicant: Rubio Mayra | Permit status: Permisud | Expiration date: December 16, 2006 | Permit id: 512190087 | |||||
SCORE 87 Engineer: Gary Otto | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: May 11, 2006 | Expiration date: April 9, 2005 | Permit id: 305070047 | |||||
SCORE 87 Engineer: Gary Otto | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: May 11, 2006 | Expiration date: April 9, 2005 | Permit id: 305070052 | |||||
SCORE 87 Date: February 2, 2006 Contractor: Abellhelou Homes Inc Applicant: Garcia Emigdio | Permit status: Finaled | Completion date: October 3, 2006 | Expiration date: August 1, 2006 | Permit id: 602020026 | |||||
SCORE 87 Date: February 2, 2006 Contractor: Abellhelou Homes Inc Applicant: Garcia Emigdio | Permit status: Finaled | Completion date: July 26, 2006 | Expiration date: August 1, 2006 | Permit id: 602020031 | |||||
SCORE 87 Date: August 8, 2006 Contractor: Abellhelou Homes Inc Applicant: Naranjo Cecilia | Permit status: Permisud | Expiration date: February 4, 2007 | Permit id: 608070007 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 606290046 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Expiration date: December 30, 2006 | Permit id: 606290047 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Expiration date: December 30, 2006 | Permit id: 606290048 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: December 30, 2006 | Permit id: 606290049 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 15, 2006 | Expiration date: December 30, 2006 | Permit id: 606290050 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Expiration date: December 30, 2006 | Permit id: 606290051 | |||||
SCORE 87 Date: December 8, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1012080038 | |||||
SCORE 87 Date: December 8, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1012080039 | |||||
SCORE 87 Date: December 8, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1012080040 | |||||
SCORE 87 Date: December 8, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 16, 2011 | Expiration date: December 8, 2011 | Permit id: 1012080041 | |||||
SCORE 87 Date: December 8, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 16, 2011 | Expiration date: December 8, 2011 | Permit id: 1012080042 | |||||
SCORE 87 Date: December 9, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Permisud | Completion date: November 16, 2011 | Expiration date: December 9, 2011 | Permit id: 1012080043 | |||||
SCORE 87 Date: December 9, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1012080044 | |||||
SCORE 87 Date: December 9, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1012080045 | |||||
SCORE 87 Date: December 9, 2010 Contractor: Abellhelou Homes Inc Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1012080046 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1006160035 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1006160038 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 12, 2011 | Expiration date: December 8, 2011 | Permit id: 1006160039 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 16, 2011 | Expiration date: December 8, 2011 | Permit id: 1006160040 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: May 16, 2011 | Expiration date: December 8, 2011 | Permit id: 1006160041 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Permisud | Completion date: November 16, 2011 | Expiration date: December 9, 2011 | Permit id: 1006160042 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1006160043 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1006160044 | |||||
SCORE 87 Applicant: Abell-Helou Homes Inc | Permit status: Finaled | Completion date: June 17, 2011 | Expiration date: December 9, 2011 | Permit id: 1006160045 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 20, 2006 | Permit id: 606230006 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Permisud | Expiration date: December 20, 2006 | Permit id: 606230007 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 20, 2006 | Permit id: 606230008 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 20, 2006 | Permit id: 606230009 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 20, 2006 | Permit id: 606230010 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: June 27, 2006 | Expiration date: December 20, 2006 | Permit id: 606230011 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 20, 2006 | Permit id: 606230012 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 20, 2006 | Permit id: 606230013 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Permisud | Expiration date: December 20, 2006 | Permit id: 606230014 | |||||
SCORE 87 Date: June 23, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 20, 2006 | Permit id: 606230016 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230017 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230018 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 3, 2007 | Expiration date: December 24, 2006 | Permit id: 606230020 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230021 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230022 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: December 24, 2006 | Permit id: 606230023 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 7, 2006 | Expiration date: December 24, 2006 | Permit id: 606230025 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230027 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2007 | Expiration date: December 24, 2006 | Permit id: 606230028 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: December 24, 2006 | Permit id: 606230029 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: December 24, 2006 | Permit id: 606230030 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: December 24, 2006 | Permit id: 606230031 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: November 8, 2006 | Expiration date: December 24, 2006 | Permit id: 606230032 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: December 24, 2006 | Permit id: 606230033 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 26, 2006 | Expiration date: December 24, 2006 | Permit id: 606230034 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: December 24, 2006 | Permit id: 606230035 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 20, 2006 | Expiration date: December 24, 2006 | Permit id: 606230036 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: December 24, 2006 | Permit id: 606230037 | |||||
SCORE 87 Date: June 27, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: September 15, 2006 | Expiration date: December 24, 2006 | Permit id: 606230038 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 8, 2006 | Expiration date: December 30, 2006 | Permit id: 607030001 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 607030002 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 607030003 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 20, 2006 | Expiration date: December 30, 2006 | Permit id: 607030005 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 5, 2007 | Expiration date: December 30, 2006 | Permit id: 607030007 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 3, 2007 | Expiration date: December 30, 2006 | Permit id: 607030008 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: January 9, 2007 | Expiration date: December 30, 2006 | Permit id: 607030009 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 607030010 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 607030011 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Applicant: Limahelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Expiration date: December 30, 2006 | Permit id: 607030012 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260025 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: October 30, 2007 | Expiration date: February 27, 2006 | Permit id: 508260027 | |||||
SCORE 87 Date: August 31, 2005 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Najar Guillermo | Permit status: Finaled | Completion date: August 1, 2007 | Expiration date: February 27, 2006 | Permit id: 508260028 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 28, 2006 | Expiration date: December 30, 2006 | Permit id: 606300012 | |||||
SCORE 87 Date: July 3, 2006 Contractor: Abellhelou Homes Inc Engineer: Architrans - Binn Tran | Applicant: Limaelu Jan | Permit status: Finaled | Completion date: December 1, 2006 | Expiration date: December 30, 2006 | Permit id: 606300013 |